Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.4 LAccepted-AOC DHALIWAL | 1 | Accepted-AOC L1 | |
| 2 | 2₹4.9 L+₹49,355.90 (11.3%)Rejected-AOC | 2 | Rejected-AOC L2 | |
| 3 | 3₹5.2 L+₹82,343.10 (18.9%)Rejected-AOC | 3 | Rejected-AOC L3 | |
| 4 | 4₹5.3 L+₹90,269.60 (20.7%)Rejected-AOC N A | FARIDABAD | HARYANA | 121004 | 4 | Rejected-AOC L4 |
Tender Value
₹5.6 L
EMD Value
₹13,975
Closing Date
13 Apr 2022, 5:00 pmClosed
commissioner MC Solan
commissioner MC Solan
Construction of path from Dev Sthan to sunil Flats in ward no.3
2022_UDDHP_59176_1
8858-61 dt. 23.03.2022
Open Tender
Civil Works
Item Rate
60 days
MC Solan
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,000
commissioner MC Solan
₹13,975
22 Jan 2025
6 Apr 2022
16 Apr 2022
6 Apr 2022
13 Apr 2022
6 Apr 2022
Amount
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:5:10 (1 cement : 5 coarse sand): 10 graded stone aggregate 40 mm nominal size)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand) : 6 graded stone aggregate 20 mm nominal size)
Chequerred precast cement concrete tiles 22 mm thick in footpath & courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete, on 20 mm thick bed of cement mortar 1:4 (1 cement: 4 coarse sand) Dark shade pigment using ordinary cement
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing:1:3:6 (1 cement : 3 coarse sand) : 6 graded stone aggregate 20 mm nominal size)
Centering and shuttering including strutting, propping etc. and removal of form for : Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Vivek Dobhal
Prateek Sonkhla
RAMESH CHAND
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .