Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹99,500Accepted-AOC 25 PRATAP COMPLEX GULAB SINGH MARG JAMMU | L1 | Accepted-AOC Being the lowest | |
| 2 | L2₹1 L+₹500 (0.50%)Rejected-AOC BHAGWATI NAGAR JAMMU | L2 | Rejected-AOC Not the lowest | |
| 3 | L3₹1.0 L+₹1,500 (1.51%)Rejected-AOC BHAGWATI NAGAR JAMMU | L3 | Rejected-AOC Not the lowest |
Tender Value
Refer Docs
EMD Value
₹2,200
Closing Date
14 Jun 2023, 1:00 pmClosed
Executive Engineer Mechanical Division RTIC Jammu
RTIC Mechanical Division Canal Road Jammu
Repair/ Maintenance of 400HP/300KW GEC make 3 phase induction motors unit (3 nos) i.e. Unit no. 2, 5 and 6 installed / fitted inside pump house at lift irrigation station Raya
2023_IFC_213942_1
Short e NIT MDJ/RTIC/03 of 23-24 dt 29-05-2023
Open Tender
Electrical and Maintenance Works
Item Rate
15 days
Jammu
Please refer Tender documents.
8 documents required · 8 mandatory
₹200
Yes
Executive Engineer Mechanical Division RTIC Jammu
₹2,200
Yes
Executive Engineer Mechanical Division RTIC Jammu
14 Oct 2023
29 May 2023
15 Jun 2023
30 May 2023
14 Jun 2023
1 Jun 2023
31 May 2023
Amount
Repair/ Maintenance of 400HP/300KW GEC make 3 phase induction motors unit (3 no’s) i.e. Unit no. 2, 5 & 6 installed / fitted inside pump house at lift irrigation station Raya. Repair / maintenance / servicing of 400HP/300KW GEC make 3 phase induction motor 3 no’s installed / fitted inside pump house at Raya lift irrigation station by way of disconnecting of power connections thereafter dismantling the motor from the base frame as well as decoupling it from the pump. Shifting of motors from LIS Raya to workshop with the help of mechanical transport and unloading the same at workshop carefully with the help of crane. Dismantling the motor covers and thereafter cleaning the stator and rotor first with the help of blower to remove dirt and dust and then with cleaning agent CRC – 226 after dismantling of motor. Cleaning of bearings with kerosene oil and then greasing the bearings properly. Providing and taping with new insulation tape i.e. glass tape / mica tape on all overhanging portion of the coils and also replacing damaged wedges with new wedges. Varnishing of the complete motor i.e. stator and rotor with superior type of Bakelite red / grey varnish. Varnish is to be done with brush by giving two coats till all the grooves / gaps are filled and a uniform layer is formed. Drying out both (Stator and Rotor) under controlled temperature till constant IR value is attained. Assembling of rotor and stator and shifting back to the LIS Raya. Installation of motors on the base frame and coupled with pump, making proper alignment with pump and connecting with all cables properly. Testing of motors on full load.Complete job includes cost of material, transportation charges, labour charges skilled and un-skilled including charges for tools and tackles required for execution of job.
M/S FASTTRACK ENGINEERS
PERFECT ELECTRICAL WORKS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .