| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.3 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹4.4 L+₹8,025 (1.87%)Admitted-Finance 4 DALURBANDH PANDAVESWAR PANDAVESWAR BARDHAMAN WEST BENGAL 713346 UDYAM WB 03 0006114 | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | L2 | Admitted-Finance | |
| 3 | L3₹4.5 L+₹21,572 (5.02%)Admitted-Finance NATUNDANGA BANAGRAM BARDHAMAN 713381 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713381 | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | MAZUMDER ELECTRICAL L2 | ENERGY ENGINEERING L3 | MONOARA ARMATURE REPAIRING SHOP L1 |
|---|---|---|---|---|---|---|
| 1.00Item Description/ Heading | ||||||
| 2.00100 KVA, 550V/415V Lighting Transformer | ||||||
| 3.00 | Aluminum wire with DPC | 105 | Kg | 606 ₹63,630 | 624 ₹65,520 | 594 ₹62,370 Lowest |
| 4.00 | Class F insulation materials | 1 | LS | 8,415 ₹8,415 | 8,663 ₹8,663 | 8,250 ₹8,250 Lowest |
| 5.00 | Cork sheet 4 mm | 2 | Nos | 2,917 ₹5,834 | 3,003 ₹6,006 | 2,860 ₹5,720 Lowest |
| 6.00 | Connection studs with insulator | 7 | Nos | 1,066 ₹7,462 | 1,097 ₹7,679 | 1,045 ₹7,315 Lowest |
| 7.00 | Wooden work for coil formation | 1 | L.S. | 2,749 ₹2,749 | 2,830 ₹2,830 | 2,695 ₹2,695 Lowest |
| 8.00 | Decarbonizing and cleaning of core & tank | 1 | L.S. | 1,907 ₹1,907 | 1,964 ₹1,964 | 1,870 ₹1,870 Lowest |
| 9.00 | Thinner and varnish | 1 | L.S. | 3,927 ₹3,927 | 4,043 ₹4,043 | 3,850 ₹3,850 Lowest |
| 10.00 | Cooling tubes welding and grinding | 1 | L.S. | 5,161 ₹5,161 | 5,313 ₹5,313 | 5,060 ₹5,060 Lowest |
Tender Value
₹5.1 L
EMD Value
₹6,400
Closing Date
12 Feb 2026, 5:00 pmClosed
Area Engineer(EnM)
Kenda Area
Repairing-rewinding of 3 nos. of transformer installed at Siduli Colliery
2026_ECL_352263_1
GM/KND/AE(ENM)/55(TN)/25-26/56
Open Tender
Miscellaneous Works
Item Rate
15 days
Siduli Colliery
Please refer Tender documents.
4 documents required · 4 mandatory
₹6,400
10 Mar 2026
2 Feb 2026
13 Feb 2026
2 Feb 2026
12 Feb 2026
2 Feb 2026
2 Feb 2026 - 9 Feb 2026
Item Description/ Heading
100 KVA, 550V/415V Lighting Transformer
Aluminum wire with DPC
Class F insulation materials
Cork sheet 4 mm
Connection studs with insulator
Wooden work for coil formation
Decarbonizing and cleaning of core & tank
Thinner and varnish
Cooling tubes welding and grinding
Rewinding Charges
Less Scrap value (-)
Transporting both side
250 KVA, 440V/550V Step-up Power Transformer
Dismantling of burnt winding/decarbonizing
Core dry out and re-assembling
New Electrolyte grade copper conductor
Cleaning/decarbonizing of old copper
Re-insulation into TPC
Wooden forma for new coils
Insulation materials
Re-formation of barrel type coils
New copper studs set
Re-assembling/cover setting
Brazing rod Eutec-1805
Neoprene synthetic gasket
Rewinding charges
Less copper Scrap value (-)
Transporting charges
315 KVA, 3.3 KV/550 V T.S Unit Transformer
De-tanking and dismantling
Glass board, nuts/bolts hardware
Silver brazing electrodes, DA, oxygen
Fitting of re-formed coils
Dry-up and testing
Cleaning/decarbonizing old primary
Cleaning/decarbonizing old secondary
New electrolyte grade copper strips
Re-insulation (Nomex)
Re-formation of Barrel type coils
Class 'F' varnish & thinner
Less scrap value (-)
Transporting Charges
Total impact of GST for the purpose of CTC
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.59 MB
Tendernotice_2.pdf
PDF • 1.25 MB
BOQ_365052.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .