Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance M 8 MIDC AMBAD NASHIK MAHARASHTRA 422010 | NASHIK | MAHARASHTRA | 422010 | Admitted-Finance |
| 2 | Admitted-Finance GIDC 2109 PHASE III VATVA INDUSTRIAL ESTATE VATVA AHMEDABAD GUJARAT 382445 AHMEDABAD GUJARAT 382445 | AHMADABAD | GUJARAT | 382445 | Admitted-Finance |
| 3 | Admitted-Finance W123A W124A AMBAD MIDC AMBAD MIDC MIDC AMBAD NASHIK NASHIK MAHARASHTRA 422010 | NASHIK | MAHARASHTRA | 422010 | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
20 Jul 2022, 3:00 pmClosed
PUNEET KHANNA (Head-Supply Chain Management
Worley India Private Limited, (formerly Jacobs Engineering India Private Limited) New Energy House, Ramakrishna Mandir Road, Kondivita, Andheri (East), Mumbai-400 059, India
Supply of Positive Displacement Pumps
2022_REFHQ_152568_1
213102-00123-00-ME-REQ-00003
Limited
Mechanical - Pumps, Compressors, Steam Turbines and Other Equipment
Supply
180 days
IOCL, Guwahati, Refinery, India
3 documents required · 3 mandatory
Exempted
19 Sept 2022
20 Jun 2022
21 Jul 2022
20 Jun 2022
20 Jul 2022
4 Jul 2022
SUPPLY OF POSITIVE DISPLACEMENT PUMPS - (Refer Material Requisition for details)
Wash Water Injection Pumps
Sulfide Injection Pumps
Net Gas Suction Drum Pumps
Regeneration Chloride Pump 1
Regeneration Chloride Pump 2
Start -up Sulfide Injection Pump 2
Regeneration Condensate Injection Pumps
Description of Work / Item(s)
RECOMMENDED SPARES FOR TWO YEARS O&M – FOR SR NO 1.01 OF BOQ1
RECOMMENDED SPARES FOR TWO YEARS O&M – FOR SR NO 1.02 OF BOQ1
RECOMMENDED SPARES FOR TWO YEARS O&M – FOR SR NO 1.03 OF BOQ1
RECOMMENDED SPARES FOR TWO YEARS O&M – FOR SR NO 1.04 OF BOQ1
RECOMMENDED SPARES FOR TWO YEARS O&M – FOR SR NO 1.05 OF BOQ1
RECOMMENDED SPARES FOR TWO YEARS O&M – FOR SR NO 1.06 OF BOQ1
RECOMMENDED SPARES FOR TWO YEARS O&M – FOR SR NO 1.07 OF BOQ1
Description of Work / Item(s)
CHARGES FOR SITE SUPERVISION -
Estimated Site supervision during Erection (54 Man days) and Pre-commissioning / commissioning (27 Man days) shall be considered (refer Material Requisition for tagnumber wise estimated man-day requirement. Line-item wise Price evaluation shall be carried out as per the estimated Site Supervision man-days mentioned in the Material Requisition, as below) - BOQ1 Sr no. 1.01 : Estimated Site Supervision - 18 man-days - BOQ1 Sr no. 1.02 : Estimated Site Supervision - 09 man-days - BOQ1 Sr no. 1.03 : Estimated Site Supervision - 18 man-days - BOQ1 Sr no. 1.04 : Estimated Site Supervision - 09 man-days - BOQ1 Sr no. 1.05 : Estimated Site Supervision - 09 man-days - BOQ1 Sr no. 1.06 : Estimated Site Supervision - 09 man-days - BOQ1 Sr no. 1.07 : Estimated Site Supervision - 09 man-days i.e. Total 81 man-days shall be considered for bid evaluation
Per diem charges (per person) for 8 hours work on normal working days.
Overtime rate / hour beyond normal 8 hours work on normal working days.
Overtime rate / hour for work on weekly off days/ holidays (as applicable to Refinery site).
Positive Metering Pumps (I) Pvt. Ltd.
Swelore Engineering Pvt. Ltd.
V. K. Pump Industries Pvt Ltd
Swelore Engineering Pvt. Ltd.
V. K. Pump Industries Pvt Ltd
Swelore Engineering Pvt. Ltd.
Per diem charges (per person) for 8 hours work on normal working days.
Overtime rate / hour beyond normal 8 hours work on normal working days.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .