| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.2 CrAccepted-AOC | ₹1.2 Cr | L-1 | Accepted-AOC Lowest bidder for the subject work. |
| 2 | L-2₹1.2 Cr+₹4.4 L (3.70%)Rejected-Finance 84 A VIJAY NAGAR COLONY LALGHATI PO NAYAPURA BHOPAL 462032 | 462032 | ₹1.2 Cr+₹4.4 L (3.70%) | L-2 | Rejected-Finance other than the lowest bidder |
| 3 | L-3₹1.3 Cr+₹8.0 L (6.75%)Rejected-Finance NO 403 BENGALI COLONY RANJHI JABALPUR MP 482001 | JABALPUR | JABALPUR | MADHYA PRADESH | 482001 | ₹1.3 Cr+₹8.0 L (6.75%) | L-3 | Rejected-Finance other than the lowest bidder |
| 4 | L-4₹1.3 Cr+₹8.8 L (7.38%)Rejected-Finance DH 101 DEEN DAYAL NAGAR MAHARAJPUR GWALIOR 474020 MP | GWALIOR | MADHYA PRADESH | 474020 | ₹1.3 Cr+₹8.8 L (7.38%) | L-4 | Rejected-Finance other than the lowest bidder |
| 5 | L-5₹1.3 Cr+₹11.5 L (9.68%)Rejected-Finance BHAWANI KRUPA GANDHI CHOWK PULGAON | PULGAON | WARDHA | MAHARASHTRA | ₹1.3 Cr+₹11.5 L (9.68%) | L-5 | Rejected-Finance other than the lowest bidder |
| Sl No | Description | Qty | Unit | RAVINDRA SALES L6 | M/s Bijender Singh L4 | M/S RAKESH TRADERS L1 | J.P ENTERPRISES L3 | M/S JAI BHAWANI CONSTRUCTIONS L5 | New Era Engineers L7 | POONAM ELECTRIC INDUSTRY L2 | ELECTRA ENGINEERS L9 | JYOTI ENTERPRISES L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 0.00GENERAL SUMMARY | ||||||||||||
| 1.00Lump sum price worked out by the contractor against Schedule ‘A’ Part- I (BUILDING WORKS) for the following building works:- | ||||||||||||
| 1.01 | (a) Lump sump amount worked out by the contractor for Design, development of structural drawings as per the architectural drawing Nos CWE/ARCH/36/2026 Sheet No. 1/2 to 2/2 and Construction of Guard Post to permanent specification including pre construction anti termite treatment , RCC Framed structure, Fittings/Fixtures, internal services , attached Toilet Bath as applicable etc., complete all as specified and as directed.
NOTE:- The structural design and drawing shall be got vetted from any IITs/NITs College before execution of work by the contractor. | 1 | Block | 23,50,000 ₹23,50,000 | 19,50,000 ₹19,50,000 Lowest | 21,00,000 ₹21,00,000 | 22,00,000 ₹22,00,000 | 22,14,560 ₹22,14,560 | 30,50,000 ₹30,50,000 | 23,75,000 ₹23,75,000 | 55,45,000 ₹55,45,000 | 22,50,000 ₹22,50,000 |
| 1.02 | (b) Lump sump amount worked out by the contractor for Design, development of structural drawings as per the TD drawing Nos CEBZ/TD/125/11 Sheet No. 1/1 and Construction of Sentry Post to permanent specification including pre construction anti termite treatment , RCC Framed structure, Fittings/Fixtures, internal services , attached Toilet Bath as applicable etc., complete all as specified and as directed.
NOTE:- The structural design and drawing shall be got vetted from any IITs/NITs College before execution of work by the contractor. | 1 | Block | 1,80,000 ₹1,80,000 | 5,00,000 ₹5,00,000 | 1,40,000 ₹1,40,000 Lowest | 2,35,000 ₹2,35,000 | 2,30,000 ₹2,30,000 | 2,10,000 ₹2,10,000 | 1,50,000 ₹1,50,000 | 17,50,000 ₹17,50,000 | 14,50,000 ₹14,50,000 |
| 1.03 | (c) Lump sump amount worked out by the contractor for Design, development of structural drawings as per the architectural drawing Nos CWE/ARCH/36/2026 Sheet No. 1/2 to 2/2 and Construction of Store Room to permanent specification including pre construction anti termite treatment , RCC Framed structure, Fittings/Fixtures, internal services , attached Toilet Bath as applicable, etc complete all as specified and as directed.
NOTE:- The structural design and drawing shall be got vetted from any IITs/NITs College before execution of work by the contractor. | 1 | Block | 4,25,000 ₹4,25,000 | 5,00,000 ₹5,00,000 | 2,75,000 ₹2,75,000 Lowest | 4,50,000 ₹4,50,000 | 3,98,500 ₹3,98,500 | 3,45,000 ₹3,45,000 | 3,15,000 ₹3,15,000 | 15,00,000 ₹15,00,000 | 2,75,000 ₹2,75,000 Lowest |
| 2.00 | Lump sum price worked out by the contractor for EXCAVATION AND EARTH WORK as listed in Schedule ‘A’ Part- II (Ref prepriced schedule attached seperately) | 1 | Lump Sum | 1,25,000 ₹1,25,000 | 1,00,000 ₹1,00,000 | 70,000 ₹70,000 Lowest | 1,23,000 ₹1,23,000 | 99,601 ₹99,601 | 92,000 ₹92,000 | 1,27,000 ₹1,27,000 | 1,50,000 ₹1,50,000 | 1,10,000 ₹1,10,000 |
| 3.00 | Lump sum price worked out by the contractor for INTERNAL ELECTRIFICATION WORKS as listed in Schedule ‘A’ Part-III (Ref prepriced schedule attached seperately) | 1 | Lump Sum | 1,49,000 ₹1,49,000 | 1,50,000 ₹1,50,000 | 1,40,000 ₹1,40,000 | 1,50,000 ₹1,50,000 | 1,58,941 ₹1,58,941 | 1,44,500 ₹1,44,500 | 1,28,000 ₹1,28,000 Lowest | 1,29,000 ₹1,29,000 | 1,35,000 ₹1,35,000 |
| 4.00 | Lump sum price worked out by the contractor for EXTERNAL ELECTRIFICATION WORKS as listed in Schedule ‘A’ Part- IV (Ref prepriced schedule attached seperately) | 1 | Lump Sum | 92,000 ₹92,000 | 85,000 ₹85,000 | 80,000 ₹80,000 Lowest | 90,000 ₹90,000 | 1,00,000 ₹1,00,000 | 92,500 ₹92,500 | 83,500 ₹83,500 | 95,000 ₹95,000 | 95,000 ₹95,000 |
| 5.00 | Lump sum price worked out by the contractor for PATH WORKS as listed in Schedule ‘A’ Part- V (Ref prepriced schedule attached seperately) | 1 | Lump Sum | 2,45,000 ₹2,45,000 | 2,15,468 ₹2,15,468 | 2,00,000 ₹2,00,000 | 2,60,000 ₹2,60,000 | 1,65,031 ₹1,65,031 Lowest | 2,48,000 ₹2,48,000 | 2,05,000 ₹2,05,000 | 2,95,000 ₹2,95,000 | 2,25,000 ₹2,25,000 |
| 6.00 | Lump sum price worked out by the contractor for SEWAGE DISPOSAL WORKS as listed in Schedule ‘A’ Part-VI (Ref prepriced schedule attached seperately) | 1 | Lump Sum | 60,000 ₹60,000 Lowest | 65,987 ₹65,987 | 60,000 ₹60,000 Lowest | 72,000 ₹72,000 | 69,854 ₹69,854 | 73,000 ₹73,000 | 67,500 ₹67,500 | 75,000 ₹75,000 | 75,000 ₹75,000 |
Tender Value
₹1.1 Cr
EMD Value
₹1.9 L
Closing Date
30 May 2026, 6:00 pmClosed
Col Pawan Kumar, CWE
Headquarters, Commander Works Engineer, Bhopal, Military Engineer Services, SI Line, Bhopal, Pin Code - 462001 (Madhya Pradesh)
ADDN/ALTN AND SPL REPAIR TO CERTAIN BLDGS AT BRAHMASHIRA COMPLEX UNDER GE DRONACHAL
2026_MES_762635_1
84214/E8
Open Tender
Civil Works
Item Rate
150 days
Dronachal
AS PER NIT CONDITION
7 documents required · 7 mandatory
₹1,000
Yes
GE Dronachal
₹1.9 L
Yes
29 Jun 2026
28 Apr 2026
1 Jun 2026
28 Apr 2026
30 May 2026
25 May 2026
28 Apr 2026 - 25 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0GENERAL SUMMARY | |||||
| 1Lump sum price worked out by the contractor against Schedule ‘A’ Part- I (BUILDING WORKS) for the following building works:- | |||||
| 1.01 | (a) Lump sump amount worked out by the contractor for Design, development of structural drawings as per the architectural drawing Nos CWE/ARCH/36/2026 Sheet No. 1/2 to 2/2 and Construction of Guard Post to permanent specification including pre construction anti termite treatment , RCC Framed structure, Fittings/Fixtures, internal services , attached Toilet Bath as applicable etc., complete all as specified and as directed.
NOTE:- The structural design and drawing shall be got vetted from any IITs/NITs College before execution of work by the contractor. | 1 | Block | - | - |
| 1.02 | (b) Lump sump amount worked out by the contractor for Design, development of structural drawings as per the TD drawing Nos CEBZ/TD/125/11 Sheet No. 1/1 and Construction of Sentry Post to permanent specification including pre construction anti termite treatment , RCC Framed structure, Fittings/Fixtures, internal services , attached Toilet Bath as applicable etc., complete all as specified and as directed.
NOTE:- The structural design and drawing shall be got vetted from any IITs/NITs College before execution of work by the contractor. | 1 | Block | - | - |
| 1.03 | (c) Lump sump amount worked out by the contractor for Design, development of structural drawings as per the architectural drawing Nos CWE/ARCH/36/2026 Sheet No. 1/2 to 2/2 and Construction of Store Room to permanent specification including pre construction anti termite treatment , RCC Framed structure, Fittings/Fixtures, internal services , attached Toilet Bath as applicable, etc complete all as specified and as directed.
NOTE:- The structural design and drawing shall be got vetted from any IITs/NITs College before execution of work by the contractor. | 1 | Block | - | - |
| 2 | Lump sum price worked out by the contractor for EXCAVATION AND EARTH WORK as listed in Schedule ‘A’ Part- II (Ref prepriced schedule attached seperately) | 1 | Lump Sum | 1,23,856.63 | ₹1,23,856.63 |
| 3 | Lump sum price worked out by the contractor for INTERNAL ELECTRIFICATION WORKS as listed in Schedule ‘A’ Part-III (Ref prepriced schedule attached seperately) | 1 | Lump Sum | 1,54,691.28 | ₹1,54,691.28 |
| 4 | Lump sum price worked out by the contractor for EXTERNAL ELECTRIFICATION WORKS as listed in Schedule ‘A’ Part- IV (Ref prepriced schedule attached seperately) | 1 | Lump Sum | 90,084.76 | ₹90,084.76 |
| 5 | Lump sum price worked out by the contractor for PATH WORKS as listed in Schedule ‘A’ Part- V (Ref prepriced schedule attached seperately) | 1 | Lump Sum | 2,63,235.77 | ₹2,63,235.77 |
| 6 | Lump sum price worked out by the contractor for SEWAGE DISPOSAL WORKS as listed in Schedule ‘A’ Part-VI (Ref prepriced schedule attached seperately) | 1 | Lump Sum | 72,329.47 | ₹72,329.47 |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.32 MB
84214TenderDocuments.pdf
Tender Documents • 1.54 MB
BOQ_854267.xls
BOQ • 0.29 MB
Alldrawings.pdf
Additional Documents • 5.53 MB
84214PrepricedSch.pdf
Additional Documents • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .