Tender Value
₹14.3 L
EMD Value
₹15,000
Closing Date
29 Jul 2022, 3:00 pmClosed
Project Director
DRDA, Tenkasi
Improvements of Kattu Perumal Kovil Oorani and Bathing Ghat and Retaining wall in Elathur panchayat Shencottai Panchayat union tenkasi district AGAMT II 2021-22 Package No.33
2022_RDTN_240787_22
A4/1192/2022 dt 05.07.2022 AGAMTII-Tsi
Open Tender
Civil Works - Others
Works
180 days
DRDA
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹15,000
DRDA, Tenkasi
1 Aug 2022
12 Jul 2022
29 Jul 2022
12 Jul 2022
29 Jul 2022
12 Jul 2022
14 Jul 2022
Amount
Impreovement of kattuperumal kovil oorani by digging baby pond ,steining wall ,Bhathing Ghat,Revetment works to Main Pond and Protection wall in Elathur Panchayat
Clearing the light Jungle/Scrubb jungle are removed away from the site including all cutting charges and all labour charges as per standard specification.
Earth work excavation and depositing on bank with on initial lead of 10m and on initial lift of 2m in silt, other loose oils, wet sand, silt not under water light black cotton soil, sandy loam and ordinary soil including excavated earth as per Rural schedule of Rates for Ordinary soil I
Construction of Lining for Baby Pond
Earth work excavation in all clauses of soils with initial lead and lift except hard rock requiring blasting etc., complete for foundation as per SS 20B
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete
Random rubble masonry in cement mortar 1:5 mix with simultaneous pointing including cost and conveyance pf all materials to site and all labour charges etc complete for 10 cum
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc complete.
Provision for Revetment work
Earth work excavation and depositing on bank with initial lead and lift in hard stiff clay and hard gravelly soil as per SS20B for Narrow foundation etc complete.,
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials and all labour charges etc., complete.
Centering Chages for all Concrete Works including cost and conveyance of all materials and all labour charges etc., complete. (for suttering below sill level)
Cement concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials and all labour charges etc., complete.
Supplying suitable gravel and provinding gravel packing 15cm thick for revetment including machine the same for premeasurement spreading and woaring with to plastic waste complete as direaced by the engineer in charge
Rough stone dry packing for aprons and revetments including cost and conveyance and all labour charges etc complete
Providing Productive wall
Earth work excavation in hard stiff clay soil with initial lead and lift as per SS 20B for corewall etc., complete.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Construction of Bathing Ghat.
Earth work excavation in all clauses of soils with initial lead and lift except hard rock requiring blasting etc., complete for foundation as per SS 20B
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Centering charges for RCC works including all cost and conveyance all materials to site etc., complete.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum
GST Amount for providing Service to Government Contract Works for the above RENEWAL Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
MR.S.CHELLADURAI
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .