| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹78.5 LAccepted-AOC | L1 | Accepted-AOC L1 Bidder | |
| 2 | L2₹97.5 L+₹18.9 L (24.1%)Rejected-Finance | L2 | Rejected-Finance Not the lowest Bidder | |
| 3 | L3₹98.0 L+₹19.5 L (24.8%)Rejected-Finance | L3 | Rejected-Finance Not the lowest Bidder | |
| 4 | L4₹1.1 Cr+₹32.9 L (41.9%)Rejected-Finance | L4 | Rejected-Finance Not the lowest Bidder | |
| 5 | L5₹1.2 Cr+₹44.0 L (56.1%)Rejected-Finance | L5 | Rejected-Finance Not the lowest Bidder |
| Sl No | Description | Qty | Unit | CHILLANA CONSTRUCTION COMPANY L1 | V R TRADERS L6 | SHRI BALA JI CONSTRUCTION COMPANY L7 | SHRI SHYAM CONSTRUCTION CO. L2 | HARSH CONSTRUCTION CO. L4 | ROYAL BUILDERS L3 | SHRI RAM TRADING CO. L5 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolition of cement concrete ( un re-inforced) of any description in roofs, floors(other than ground floors), beams, staircases, landing, chajjas and similar suspended work including removing old roof treatement etc complete all as specified and directed by Engineer-in-Charge. | 20 | Cum | 450 ₹9,000 | 440 ₹8,800 | 400 ₹8,000 | 850 ₹17,000 | 660 ₹13,200 | 500 ₹10,000 | 340 ₹6,800 Lowest |
| 2.00 | Demolition/taking out of mud from roofs, any thickness, including removing / cutting uprooting grass,vegetations and | 80 | Cum | 100 ₹8,000 Lowest | 210 ₹16,800 | 400 ₹32,000 | 250 ₹20,000 | 440 ₹35,200 | 350 ₹28,000 | 300 ₹24,000 |
| 3.00 | M&L for levelling course for roof slab, Type B0, 1:2:4 (12.5 mm graded aggregate) using waterproofing compound (SBR) for maintaining proper roof slope and finishing cement concrete surface even and smooth without using extra cement complete all as specified.(Minimum thickness of concrete should not be less than 50mm at any point)
Note : Waterproofing compound should be measured and paid separately. | 16 | Cum | 2,200 ₹35,200 Lowest | 5,500 ₹88,000 | 5,300 ₹84,800 | 4,500 ₹72,000 | 4,900 ₹78,400 | 5,800 ₹92,800 | 6,200 ₹99,200 |
| 4.00 | M & L PCC 1:2:4, type B-1 , using 20mm graded stone aggregate as in kerbs or mud stops, rounded or chamfered on edges and similar work complete all as specified and directed by Engineer-in-Charge. | 4 | Cum | 2,800 ₹11,200 Lowest | 5,200 ₹20,800 | 5,000 ₹20,000 | 4,000 ₹16,000 | 5,000 ₹20,000 | 6,000 ₹24,000 | 6,000 ₹24,000 |
| 5.00 | OVERLAY- PU BASED ELASTOMERIC LIQUIED MEMBRANE SYSTEM FOR EXPOSED ROOF : Providing and applying polyurethane liquid roof waterproofing with improved water ponding capability, elastomeric high build liquid membrane for concrete roofs for exterior wall and exposed surface with solid content not less than 80% and solar reflective index not less than 106 as per (ASTM E1980-19)/tear strength ~20 N/mm (Free film, 14 days, +30 degree C) (ASTM D624) and tensile strength >= 2 N/mm2 (ASTM D4541), elongation 350 to 400% as per ASTM D412 and crack binding ability upto 2.5mm.
(a) After proper surface preparation, Apply one coat of Primer for PU coating as per manufacturers specification.
(b) Apply 1st coat of ShaliUrethane® BTD (white) @ 650 gm / m²(minimum) or equivalent by brush / roller while prime surface is tacky, Spread waterproofing reinforced Glass Fiber mash of 45 GSM with overlaps of 50 mm in both directions when the surface is still tacky. Allow 1st coat to dry.
(c ) Apply 2nd & 3rd coat of ShaliUrethane® BTD (white) @ 650 gm / m² (minimum) or equivalent by brush/roller.
Make : Fosroc/Sika/Choksey/Bostik/STP/ Asian Paints/Berger Paints
Note : (i) The Minimum dry film thickness (DFT) of roof treatment shall be 1.5mm if any shortfall in thickness of above treatment the same shall be achieved by additional coat.
(ii) The procurement of material and execution of the work of water proofing treatment shall be carried out by authorised applicator approved by GE.
(iii) The manufacturer/authorised applicator shall give a warranty for the performance & durability for 10 years. | 400 | Sqm | 660 ₹2,64,000 Lowest | 880 ₹3,52,000 | 900 ₹3,60,000 | 670 ₹2,68,000 | 700 ₹2,80,000 | 700 ₹2,80,000 | 770 ₹3,08,000 |
| 6.00 | Supply of SBR water proofing compound @ 2% of per kg cement used complete all as specified.
Make : Fosroc/Sika/Choksey/Bostik/STP/Asian Paints/Berger Paints | 50 | Kg | 40 ₹2,000 Lowest | 250 ₹12,500 | 360 ₹18,000 | 1,000 ₹50,000 | 500 ₹25,000 | 1,200 ₹60,000 | 1,000 ₹50,000 |
| 7.00 | Demolition of cement concrete ( un re-inforced) of any description in ground floor and pavings Nexc15 cm thickness (below or above GL) complete all as specified and directed by Engineer-in-Charge. | 36 | Cum | 800 ₹28,800 | 560 ₹20,160 | 400 ₹14,400 Lowest | 500 ₹18,000 | 660 ₹23,760 | 450 ₹16,200 | 400 ₹14,400 Lowest |
| 8.00 | M&L for Water proofing treatment to RCC sunken slab (not exceeding 45cm depth of sunken) as specified below and as directed by Engineer-in-Charge. :- (a) applying 15 mm plaster in CM 1:3 with WPC on raised verticle surface (b) Cleaning the surface with wire brush/coir brush, removing lose material like dust particles, dirt etc. (c) Creating fillet coving of 50x50 mm with polymer modified mortar on the junction of slab and walls (d) Apply first coat of two component modified polymer coating on the horizontal and verticle surface (e) Provision of glass fiber mesh of 2 x 2 mm immediately on above coating (f) Apply second coat of two component modified polymer coating after 72 hrs (g) Cement concrete 1:5:10 over the coating as per requirment (h) Joining the saintary pipes with the water proofing tape having bridging ability of more than 1.5 mm (j) Filling the gap between the wall opening and saintary pipe with non shrink cementatious grout complete all as specified and directed by Engineer-in-Charge.
Note: (i) The treatment shall be carried out as per the manufacturers instructions and as directed by the Engineer in charge.
(ii) Plaster shall be measured and paid separately.
(iii) PCC filling under sunken area will be measured & paid separately | 100 | Sqm | 460 ₹46,000 Lowest | 880 ₹88,000 | 500 ₹50,000 | 650 ₹65,000 | 800 ₹80,000 | 700 ₹70,000 | 700 ₹70,000 |
| 9.00 | M & L PCC (1:5:10) using 40mm graded burnt bricks aggregate as in foundation filling & mass concrete or as in sunken floor complete all as specified & directed by Engineer-in-charge | 9 | Cum | 900 ₹8,100 Lowest | 5,500 ₹49,500 | 3,000 ₹27,000 | 3,000 ₹27,000 | 4,000 ₹36,000 | 4,000 ₹36,000 | 4,500 ₹40,500 |
| 10.00 | Rendering to sunken slab floor and vertical sides 15mm thick in CM 1:3 using WP compound complete all as specified and directed by Engineer-in-Charge. | 100 | Sqm | 90 ₹9,000 Lowest | 2,000 ₹2,00,000 | 200 ₹20,000 | 260 ₹26,000 | 500 ₹50,000 | 250 ₹25,000 | 1,200 ₹1,20,000 |
Tender Value
Refer Docs
EMD Value
₹1.6 L
Closing Date
22 Sept 2025, 6:00 pmClosed
HQ CWE SRI GANGANAGAR
HQ CWE POST BOX 48 SRI GANGANAGAR-335001 (Rajasthan)
CERTAIN REPAIRS TO PLUMBING, SANITARY, PLASTERING, FLOORING, JOINERY, LEAKAGE, SEEPAGE, ROOF TREATMENT AND STRUCTURES AT ABOHAR MIL STN
2025_MES_726557_2
CA NO CWE SGNR/TOKEN-28 OF 2025-26
Open Tender
Civil Works
Item Rate
180 days
GE ABOHAR
As per NIT
8 documents required · 8 mandatory
₹1,000
GE ABOHAR
₹1.6 L
Yes
11 Nov 2025
10 Sept 2025
23 Sept 2025
10 Sept 2025
22 Sept 2025
17 Sept 2025
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .