Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAdmitted-Finance | ₹1.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.1 Cr+₹2.4 L (2.18%)Admitted-Finance | ₹1.1 Cr+₹2.4 L (2.18%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SUBRAMANIAN PANDI L1 | VELUSAMY BALAN L2 |
|---|---|---|---|---|---|
| 1.00Name of Work : Strengthening of the Palayanoor to Veeranendal road | |||||
| 2.00 | Clearing and gruing Scrub jungle road land including uprooting wild vegetation, grass, bushes, shrus, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to e used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. | 2,299.92 | Sqm | 4 ₹9,199.68 Lowest | 5 ₹11,499.6 |
| 3.00 | Earthwork excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff lack cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS, 20A | 1,533.28 | Cum | 102 ₹1,56,394.56 Lowest | 105 ₹1,60,994.4 |
| 4.00 | Picking the existing worn out B.T. Surface including all charges etc complete. | 3,425.47 | Sqm | 17 ₹58,232.99 Lowest | 20 ₹68,509.4 |
| 5.00Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete. | |||||
| 6.00 | Km 0/0-1/0 | 207.6 | Cum | 555 ₹1,15,218 Lowest | 600 ₹1,24,560 |
| 7.00 | Km 1/0-2/0 | 240 | Cum | 564 ₹1,35,360 Lowest | 600 ₹1,44,000 |
| 8.00 | Km 2/0-2/873 | 200.58 | Cum | 564 ₹1,13,127.12 Lowest | 600 ₹1,20,348 |
| 9.00Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in Sub Base/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete | |||||
| 10.00 | Km 0/0-2/873 | 1,541.53 | Cum | 3,097 ₹47,74,118.41 Lowest | 3,100 ₹47,78,743 |
Tender Value
₹1.1 Cr
EMD Value
₹1.1 L
Closing Date
18 Mar 2022, 3:00 pmClosed
The Project Director, DRDA, Sivagangai
O/o The Project Director, DRDA, Sivagangai
Strengthening of 1 Road works at Package No.TNSVG/8/TPM/ TNRRIS 2021-22 in Thiruppuvanam Block of Sivagangai District
2022_RDTN_223991_1
DIPR/962/TENDER/2022TNRRISP8
Open Tender
Civil Works - Roads
Item Rate
180 days
SIVAGANGAI
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹1.1 L
O/o The Project Director, DRDA, Sivagangai
8 Apr 2022
5 Mar 2022
18 Mar 2022
5 Mar 2022
18 Mar 2022
5 Mar 2022
14 Mar 2022
Amount
Clearing and gruing Scrub jungle road land including uprooting wild vegetation, grass, bushes, shrus, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to e used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.
Earthwork excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff lack cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS, 20A
Picking the existing worn out B.T. Surface including all charges etc complete.
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in Sub Base/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface (treated with primer) using 2.5 kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fule and all other incidental charges etc.,
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in Central Hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com.
Provision for KM Stone
Provision for HM Stone
Provision for Sign Board
Provision for Name Board
Provision for Toe Wall
Earthwork excavation and depositing on bank with initial lead and list in all classes of soils except hard rock reg. blasting etc., complete as per SS 20B for foundation.
Collection and filling of river sand including cost and conveyance to site and all labour charges for filling water and ramming etc., complete for foundation.
Providing concrete for plain/reinforced concrete (1:4:8) in open foundation scomplete as per drawings and echinical specification clause 802,803, 1202 & 1203
Cement Concrete 1:3:6 mix using 40 mm ISS HG metal including cost of conveyance of all materials and all labour charges etc., complete for foundation
Supplying and erecting centering shuttering including necessary supports for plane including all cost and conveyance of all materials etc., complete (Below)
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
VELUSAMY BALAN
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
BOQ_264783.xls
BOQ • 0.39 MB
08PriceBid2022Tpm.pdf
Tender Documents • 0.28 MB
08TechBid2022Tpm.pdf
Tender Documents • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .