Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 LAccepted-AOC | ₹2.8 L | L1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | Vidyadharan Krishnan Nair L1 |
|---|---|---|---|---|
| 1.00Civil works | ||||
| 1.01 | Loading & unloading of 9 m psc and squre pole | 10 | Each | 6,000 ₹7,080 |
| 2.01 | Transporting of 9m psc and squre pole from Road side to pole pit up to 2 KM | 10 | Each | 8,000 ₹9,440 |
| 3.01 | Excavation of pole pit in Rocky ground 9 m psc pole | 10 | Per Pit | 10,000 ₹11,800 |
| 4.01 | Erection of 9 m,PSC pole | 10 | Per Pole | 8,000 ₹9,440 |
| 5.01 | Loading & unloading of 8 m psc pole | 29 | Each | 11,600 ₹13,688 |
| 6.01 | Transporting of 8m psc and squre pole from Road side to pole pit up to 2 KM | 29 | Each | 17,400 ₹20,532 |
| 7.01 | Excavation of pole pit in Rocky ground 8 m Psc and Rcc pole | 29 | Per Pit | 21,750 ₹25,665 |
| 8.01 | Erection of 8 m,PSC pole | 29 | Per Pole | 15,950 ₹18,821 |
| 9.01 | Dismantling & Re-Fixing of 3Q Xarm | 15 | Each | 4,500 ₹5,310 |
Tender Value
Refer Docs
EMD Value
₹2,789
Closing Date
13 Jan 2026, 2:00 pmClosed
EE/D/KZI
EE/D/KZI
EE/D/KZI/ETW-48/25-26/30.12.25
2026_EB_638577_1
EE/D/KZI/ETW-48/25-26/30.12.25
Open Tender
Electrical Works
120 days
EE/D/KZI
As per Spec
3 documents required · 3 mandatory
₹0
₹2,789
Yes
26 Feb 2026
2 Jan 2026
14 Jan 2026
2 Jan 2026
13 Jan 2026
2 Jan 2026
2 Jan 2026 - 13 Jan 2026
Loading & unloading of 9 m psc and squre pole
Transporting of 9m psc and squre pole from Road side to pole pit up to 2 KM
Excavation of pole pit in Rocky ground 9 m psc pole
Erection of 9 m,PSC pole
Loading & unloading of 8 m psc pole
Transporting of 8m psc and squre pole from Road side to pole pit up to 2 KM
Excavation of pole pit in Rocky ground 8 m Psc and Rcc pole
Erection of 8 m,PSC pole
Dismantling & Re-Fixing of 3Q Xarm
Dismantling & Re-Fixing of SQ X arm
Dismantling & Re-Fixing of 3.5, 4.5 V X arm
Dismantling & Re Fixing of HT/LT 'TI' Fittings
Dismantling & Re Fixing of HT Pin Insulater
Dismantling & Re Fixing of LT Pin Insulater
Dismantling & Re Fixing of HT Disc Insulater
Dismantling & Re Fixing of LT shackle
Dismantling & Re Fixing of Aluminium knob
Dis & Redoing of S phase connection
Dis & Redoing of 3 phase connection
Excavation of stay pit on rocky ground
Erection of stay set complete
Dismantling and re Erection of stay set complete
Dismantling & re Stringing of HT line 7/4.09 ACSR mm pin point
Dismantling & re Stringing of HT line 7/4.09 ACSR mm cut point
Dismantling & re Stringing of LT line 7/2.50 AAAC or 7/2.59 ACSR pin point
Dismantling & re Stringing of LT line 7/2.50 AAAC or 7/2.59 ACSR cut point
Loading & unloading of line materials
Transporting line materials from substore to section office and office to work spot
OrdinaryTree Clearance
Coconut Tree Clearance
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.74 MB
BOQ_764235.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid