| 1 | L1₹91.2 LAccepted-Finance NO 28 A SUNTHARA VINAYAGAR KOVIL STREET PALAYAPETTAI GANDHI NAGAR POST TIRUNELVELI 627 008 | TIRUNELVELI | TIRUNELVELI | TAMIL NADU | 627008 | L1 | Accepted-Finance L1 | |
| 2 | L2₹92.5 L+₹1.3 L (1.41%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹96.0 L+₹4.8 L (5.25%)Rejected-Finance | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | A MURUGAN L3 | ROBERT WILSON L2 | Sp Constructions L1 |
|---|---|---|---|---|---|---|
| 1.00 | Labour, machinery, Consumables for the Fabrication for steel structuresHeavy section (14 kg/m and above) | 21.26 | MT | 20,000 ₹4,25,200 | 20,000 ₹4,25,200 | 17,000 ₹3,61,420 Lowest |
| 2.00 | Labour, machinery, Consumables for the Fabrication for steel structuresLight section (below 14 kg/m) | 17.6 | MT | 47,000 ₹8,27,200 | 45,000 ₹7,92,000 | 40,000 ₹7,04,000 Lowest |
| 3.00 | Labour for the Erection of the Fabricated Steel StructuresHeavy section (14 kg/m and above) | 21.26 | MT | 12,000 ₹2,55,120 | 12,000 ₹2,55,120 | 10,000 ₹2,12,600 Lowest |
| 4.00 | Labour for the Erection of the Fabricated Steel StructuresLight section (below 14 kg/m) | 17.6 | MT | 17,000 ₹2,99,200 | 15,000 ₹2,64,000 Lowest | 15,000 ₹2,64,000 Lowest |
| 5.00 | Supply of paint of reputed make and Labour,consumables for first primer coat using red oxide Paint and first finish coat of Painting using Aluminium Paint including consumables, after proper surface preparation using appropriate machinery to remove rust/scales etc as directed by the field engineer . | 38.86 | MT | 3,000 ₹1,16,580 | 2,000 ₹77,720 Lowest | 2,400 ₹93,264 |
| 6.00 | Supply of paint of reputed make (ie Asian,Dulux,Nerolec paint) and Labour for Second coat of Painting using Aluminium paint including consumables. | 38.86 | MT | 2,000 ₹77,720 | 2,000 ₹77,720 | 1,900 ₹73,834 Lowest |
| 7.00 | Labour, machinery, consumables for fabrication, erection of earrthmat, earth connection (including Green colour painting), earth electrode, earthspike (including sharpening of earth spike). As directed by the field engineer. | 10.42 | MT | 56,000 ₹5,83,520 | 50,000 ₹5,21,000 | 40,000 ₹4,16,800 Lowest |
| 8.00 | Labour charges for providing earth spike with G.I pipe including fabrication of base frame,painting and fixing as per departmental specification,excluding cost of G.I pipes,M.S Flats,base angles., etc. 30% extra charges for Line Clearance Work. | 16 | Nos | 3,000 ₹48,000 | 3,000 ₹48,000 | 1,000 ₹16,000 Lowest |
| 9.00 | Providing Earth bore 140/150 mm dia using power rig or 100/125 mm dia using hand bore set including the labour, lead, lift etc., sedimentary strata of clay & sand stone shale pebbles boulders etc., for earth Pits with supply and providing of Bentonite powder(Sodium Bentonite) 5Kg /Mtr depth of the bore mixed with low resistivity earths as directed by the field Engineer. (Earth to be supplied by the contractor). | 168 | RM | 650 ₹1,09,200 Lowest | 800 ₹1,34,400 | 650 ₹1,09,200 Lowest |
| 10.00 | Supplyt and providing of 450-650 mm dia 300 mm height ,36 mm thick cement collar with top cover for idendification of earth electrode location asdirected by the field engineer. | 28 | Each | 500 ₹14,000 Lowest | 500 ₹14,000 Lowest | 600 ₹16,800 |
Tender Value
Refer Docs
EMD Value
₹81,500
Closing Date
12 Mar 2026, 12:00 pmClosed
CE/TP SO/Madurai
CE/ TP SO / Madurai
Labour charges for Fabrication and erection of all equipments and earthing at Kulesekaram
2026_EB_670471_1
CE/TP SO/MDU Specn.No.020/2025-26
Open Tender
Electrical Works
Works
180 days
Madurai
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹81,500
2 Jul 2026
5 Mar 2026
13 Mar 2026
5 Mar 2026
12 Mar 2026
5 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Labour, machinery, Consumables for the Fabrication for steel structuresHeavy section (14 kg/m and above) | 21.26 | MT | - | - |
| 2 | Labour, machinery, Consumables for the Fabrication for steel structuresLight section (below 14 kg/m) | 17.6 | MT | - | - |
| 3 | Labour for the Erection of the Fabricated Steel StructuresHeavy section (14 kg/m and above) | 21.26 | MT | - | - |
| 4 | Labour for the Erection of the Fabricated Steel StructuresLight section (below 14 kg/m) | 17.6 | MT | - | - |
| 5 | Supply of paint of reputed make and Labour,consumables for first primer coat using red oxide Paint and first finish coat of Painting using Aluminium Paint including consumables, after proper surface preparation using appropriate machinery to remove rust/scales etc as directed by the field engineer . | 38.86 | MT | - | - |
| 6 | Supply of paint of reputed make (ie Asian,Dulux,Nerolec paint) and Labour for Second coat of Painting using Aluminium paint including consumables. | 38.86 | MT | - | - |
| 7 | Labour, machinery, consumables for fabrication, erection of earrthmat, earth connection (including Green colour painting), earth electrode, earthspike (including sharpening of earth spike). As directed by the field engineer. | 10.42 | MT | - | - |
| 8 | Labour charges for providing earth spike with G.I pipe including fabrication of base frame,painting and fixing as per departmental specification,excluding cost of G.I pipes,M.S Flats,base angles., etc. 30% extra charges for Line Clearance Work. | 16 | Nos | - | - |
| 9 | Providing Earth bore 140/150 mm dia using power rig or 100/125 mm dia using hand bore set including the labour, lead, lift etc., sedimentary strata of clay & sand stone shale pebbles boulders etc., for earth Pits with supply and providing of Bentonite powder(Sodium Bentonite) 5Kg /Mtr depth of the bore mixed with low resistivity earths as directed by the field Engineer. (Earth to be supplied by the contractor). | 168 | RM | - | - |
| 10 | Supplyt and providing of 450-650 mm dia 300 mm height ,36 mm thick cement collar with top cover for idendification of earth electrode location asdirected by the field engineer. | 28 | Each | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
cancelled_1.pdf
pdf • 0.19 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.98 MB
BOQ_805731.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .