Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹33,000
Closing Date
4 Oct 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
BLOCK DEVELOPEMENT OFFICER ODDANCHATRAM PANCHAYAT
BLOCK DEVELOPEMENT OFFICER ODDANCHATRAM PANCHAYAT
ODDANCHATRAM PANCHAYAT UNION 15th FINANCE COMMISSION 2023-24TN05-01 IN DINDIGUL DISTRICT
2023_RDTN_373950_1
948/2023/A4/13.09.2023
Open Tender
Civil Works
Works
270 days
ODDANCHATRAM PANCHAYAT UNION
ODDANCHATRAM PANCHAYAT UNION 15th FINANCE COMMISSION 2023-24TN05-01 IN DINDIGUL DISTRICT
4 documents required · 4 mandatory
₹0
₹33,000
Yes
ODDANCHATRAM PANCHAYAT UNION
5 Oct 2023
27 Sept 2023
4 Oct 2023
27 Sept 2023
4 Oct 2023
27 Sept 2023
29 Sept 2023
Amount
1. Construction of 100000 litre OHT at Kosavapatty H/O Kappiliyapatty (12m Staging) Estimate Amount Rs.32.85 Lakhs
Earth work excavation & Depositing on bank with Initial lead of 10m and lift & 2m in hard stiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth and earth mixed with small size boulder and in hard gravelly soils per SS 20B Including all other incidental charges such as slurring strutting, baling out water forming, protective bunds etc., complete for foundation.
First Depth of 1 m
SDR - (Not Requiring Blasting) Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Soft disintegrated rock, laterite, soft rock or kankar, not requiring blasting for foundation etc.,complete
First Depth of 2 m
Second depth of 1m
Cement concrete 1:4:8 mix using 40mm ISS HBG metal for foundation including cost and conveyance of all materials to site and watering whenever necessary and laid in layers not more than 15cm thick compacting etc., complete complying with std. Specifications and as directed.
Filling with excavated earth other than sand including all labour charges as per standard specification.
Supplying and erecting centering are strutting including neceassary supports for place surface for PCC works erc., using mild steel angles of sizes 90x60x10cm gauge stiffness welded mild steel angles of sizes 25x25x3mm for boarding laying over silver oak joists of single 10cm -6.5cm space of 75cm centre to centre complete complying with standard specificatinon
PLAIN SURFACE
Below ground level
Above Ground level - 3.30m to 4.30m - Brace (B1) at 3.58m
Above Ground level - 7.30m to 8.30m - Brace (B2) at 7.36m
Above Ground level - 11.30m to 12.30m
Above Ground level - 0 m to 3.30m
CURVED SURFACE
Above ground level - 0 m to 3.30m
Above Ground level - 11.30m to 12.30m
Above Ground level - 12.30m to 13.30m
OUTER SQUARE COLUMN
Below Ground level
0m to 3.30m- Above ground level
3.30m to 4.30m- Above ground level
4.30m to 5.30m- Above ground level
5.30m to 6.30m- Above ground level
6.30m to 7.30m- Above ground level
7.30m to 8.30m- Above ground level
8.30m to 9.30m- Above ground level
9.30m to 10.30m- Above ground level
10.30m to 11.30m- Above ground level
11.30m to 12.30m- Above ground level
CENTRAL CIRCULAR COLUMN
Below Ground level
0m to 3.30m- Above ground level
3.30m to 4.30m- Above ground level
4.30m to 5.30m- Above ground level
5.30m to 6.30m- Above ground level
6.30m to 7.30m- Above ground level
7.30m to 8.30m- Above ground level
8.30m to 9.30m- Above ground level
9.30m to 10.30m- Above ground level
10.30m to 11.30m- Above ground level
Supplying and fabricating and placing inposition mild steel or Ribbed Tor Steel for all reinforced cement concrte works as per the design given incuding cost of steel and binding wire in all floor etc. complete complying with standard specification . The binding wire will be supplied by the contractor as per clause MOST specification.
Reinforced Cement concrete 1: 1 1/2:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and watering whenever necessary and laid in layers not more than 15cm thick compacting etc., complete complying with std. Specifications and as directed.
1.50m to 4.50m below Ground level (Rectangular & Trapezoidal Portion)
0m to 1.50m below Ground level - For column
0m to 4.50m above Ground level - For Column & brace
4.50m to 7.32m from ground level - For Column & brace
7.32m to 10.98m from Ground level - For Column & brace
10.98m to 14.64m from Ground level - For Column, Gride beam, Floor slab & Side wall
14.64m to 18.30m from Ground level - For Side wall & Roof Slab
Painting two coats with ready mixed Plastic Emulsion of I st Class Quality paint and of approved colour over a priming coat including through scrapping, clean removal of dirt and cost and conveyance of all materials and labour charges etc,complete.
Construction of RCC Spiral stair case in R.C.C. M30 of required height for approach to the roof of service reservoir with RCC Handrails as per type design No. Sanitary Engineer/ PH (M) No. 18/6465 sanitary Engineer (PH) 3/64 including necessary earthwork excavation in various soil met with at the site of work for providing foundation concrete in C.C. 1:4:8 mix, RCC footing 1:1.5:3 mix, G.L. platform etc. including cost of steel reinforcement, fabrication charges, scaffolding, centering, precasting charges, cement, painting etc., complete and as directed by the TWAD Board officers. The stair case shall be braced to the column of service Reservoir at suitable inverval.
Providing and fixing in position of precast RCC M30 Hand rails of precast RCC M30 Hand rails of approvced design for one meter height by using 20mm HBG stone including cost of all materials, centering, shuttering,strutting,reinforcement, placing ofconcrete, finishing, curing and fixing in position on the roof slab etc.,complete and as directed by Dept officers.
Supplying and fixing in position of RCC M30 inside access ladder of required height using 20mm size HBG jelly with 2 nos. Of vertical posts of size 0.10mx0.10m and steps of size 0.45mx0.15mx 0.05 m at 30 cm c/c including cost of all materials, centering shuttering, strutting fabrication and placing in position of reinforcement, finishing, curing etc., complete and as directed by TWAD Board Officers.
Providing PVC ventilating arragements mosquito proof nylon net with 110mm PVC cowl and as directed by the departmental officers etc.,
Providing and fixing of cut stone (Roughdressed) set in CM 1:3 of size 0.45 X 0.45 X 0.15M at site including cost of all materials, labour charges, curing etc., complete and as directed by Dept. Officers.
Supplying and fixing in position CI manhole covers with CI frames (Heavy duty) of size 60cm x 60cm of best approved quality as per standard specification etc., complete compying with standard specifications
Provisions for pipe connection arrangements for inlet & outlet scour and overflow etc.,cincluding cost of pipes, specials, valve, labour charges for lifting , aligning, cutting,threading,fixing and painting of GI pipes with two coat of approved quality enamel paint etc.,complete
80mm dia GI pipes for inlet connection, over flow & rainwater harvesting pipe,scour pipe and delivary pipe
90 mm dia PVC Threaded coupler
80 mm G.I. Tee
80 mm G.I. Bend
80 mm G.I. Elbow
80 mm G.I. Flange set with rubber sheet
80 mm dia G.I. Hex Nipple
80 mm G.I. Coupler
80 mm G.M. Gate Valve with wheel
Supplying, Delivary , Laying jointing and testing of 90mm dia PVC Pipes and specials for conveying main and branch Pumping main including earthwork, refilling etc.,complete as per Standard specification etc.,complete
90mm OD PVC 4 KSC Pipe
90mm dia PVC Coupler
90mm dia PVC Elbow
90mm dia PVC Tee
Solvent cement
Earth work excavation hard stiff clay and hard rock earth and pipe laying, Jointing and refilling the trench with excavation soils including all labour charges etc.,complete
Pumping main - 90mm dia PVC Pipe line
Delivary line - 90mm dia PVC Pipe line
Towards the cost of Providing Name board including cost and conveyance of all materials to site and all labour charges etc.,complete.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
P SELVAM CONTRACTOR
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .