| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.1 LAccepted-AOC | ₹31.1 L | L1 | Accepted-AOC BID ACCEPED HENCE L1 BIDDER |
| 2 | L2₹31.6 LRejected-AOC | ₹31.6 L | L2 | Rejected-AOC BID REJECTED HENCE L2 BIDDER |
| Sl No | Description | Qty | Unit | A GANESAN L1 | THIRUSENTHUR MURUGHA AND CO L2 |
|---|---|---|---|---|---|
| 1.00 | Clearing the Scrub jungle including all labour charges for burying and burning etc., complete. | 705.6 | SQM | 6.3 ₹4,445.28 | 10 ₹7,056 |
| 2.00 | Picking 5 cm to 10 cm old BT surface and sectioning - 1 sq.m | 477.92 | CUM | 23.3 ₹11,135.54 | 30 ₹14,337.60 |
| 3.00 | Collection and supply of gritty gravel from approved quarry including all labour charges for spreading and compaction with power roller etc. complete, for Shoulders | 88.2 | CUM | 581 ₹51,244.20 | 590 ₹52,038 |
| 4.00 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory Soil Compactor to achieve the desired density, complete as per clause 401 | 72.9 | CUM | 2,529.5 ₹1.8 L | 2,535 ₹1.8 L |
| 5.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 236.6 | CUM | 2,589 ₹6.1 L | 2,595 ₹6.1 L |
| 6.00 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. | 1,892.75 | CUM | 87.4 ₹1.7 L | 95 ₹1.8 L |
| 7.00 | Providing and laying Tack coat over BM surface using 2.5kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of 7 material, labour charges, rentals for machinery, fuel and all other incidental char | 1,892.75 | CUM | 20.5 ₹38,801.38 | 30 ₹56,782.50 |
| 8.00 | Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50-13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections 8 and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including Jabour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5 | 94.64 | CUM | 9,339 ₹8.8 L | 9,345 ₹8.8 L |
| 9.00 | Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks, paver finisher/9m paver
finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 | 47.32 | CUM | 11,950 ₹5.7 L | 11,955 ₹5.7 L |
| 10.00 | T JUCTION | 1 | NO | 14,997 ₹14,997 | 14,997 ₹14,997 |
Tender Value
₹31.4 L
EMD Value
₹32,000
Closing Date
26 Feb 2026, 3:00 pmClosed
BDO BP DHARAPURAM
BLOCK DEVELOPMENT OFFICER BP, DHARAPURAM
Strengthening to the road from Pollachi - Karur road to Best Nagar (via) Sakthi School Km 0/0-0/490 H/o Kavundachiputhur Panchayat
2026_RDTN_663459_1
1310/2025/A2
Open Tender
Civil Works
KAVUNDACHIPUTHUR
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹32,000
Yes
BDO OFFICE DHARAPURAM
6 Mar 2026
21 Feb 2026
26 Feb 2026
21 Feb 2026
26 Feb 2026
21 Feb 2026
24 Feb 2026
Clearing the Scrub jungle including all labour charges for burying and burning etc., complete.
Picking 5 cm to 10 cm old BT surface and sectioning - 1 sq.m
Collection and supply of gritty gravel from approved quarry including all labour charges for spreading and compaction with power roller etc. complete, for Shoulders
Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory Soil Compactor to achieve the desired density, complete as per clause 401
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over BM surface using 2.5kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of 7 material, labour charges, rentals for machinery, fuel and all other incidental char
Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50-13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections 8 and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including Jabour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5
Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks, paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
T JUCTION
Provision for Km stone and Hm stone
i) KM stones
ii) HM stones
Provision for Scheme Name board
Provision for Sign board
Road Marking with hot applied thermoplastic 14 Compound with Reflectorising Glass Beads on Bituminous surface
Rumble strips
Provision for Photos
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_796524.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
BOQ_796524.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid