Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.0 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹6.2 L+₹12,419.33 (2.06%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹6.4 L+₹32,967.86 (5.46%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹14,000
Closing Date
14 Jun 2021, 1:00 pmClosed
EE ID AYODHYA
O/O EE ID AYODHYA
LOT NO 19-Reconstruction of V.R.B. at Km. 9.500 of Sariyawa Minor .
2021_UPIDC_593242_19
02/E.E./2021-22
Open Tender
Civil Works
Item Rate
40 days
AYODHYA
AS PER TENDER DOCUMENT
2 documents required · 2 mandatory
₹1,151
₹14,000
16 Dec 2022
8 Jun 2021
14 Jun 2021
8 Jun 2021
14 Jun 2021
8 Jun 2021
Amount
E/W in making diversion from ordinary soil including lead upto 100 m and lift 1.50m with manual compaction and proper completion of work as per direction engineer in charge
dismatalling of R.C.C. including stacking of dismantled materials as directed by engineer in charge within a distance of 60M.
dismantalling of brick work in cement mortar including stacking of dismatled material as directed by engineer in charge within a distance of 60M.
Dry E/W/ in coundation of masonary work on channels of discharge above 10 cuses including all lead & loft including disposal and back filling with all cost of labour and T&P etc.
Providing and laying in cement concrete (M-10) 1:3:6 (1cement : 3 coarse sand : 6stone grit 20-40mm. Nominal size) including supply of all materials, albour, tools & plants and centering shuttering etc. required for proper completion of work.
Brick masonary in 1:4 cement and coarse and mortar using class M-150 bricks complete in all respect including all leads lift all cost of material labour and T&P{ etc. required for proper completiom of the work.
centerring & shuttering for R.C.C. work including all cost of material labour all cost of material labour and T&P etc. required for proper completion of the work.
Centering & shuttering for RCC work including all cost of material labour and T&P etc. required for proper completion of the work
steel bending binding cutting and placing in proper position including all cost of labour and material T&P etc. required for proper completion of the work.
laying RCC of concrete grade 1:1.5:3 in wearing coat and parapet with coarse sand and stone grit size 4.75mm. To 20mm. And cement, including all cost of material. Labour and T&P etc. required for proer completion of the work.
laying CC of concrete grade 1:1.5:3 in wearing coat and parapet with coarse sand and stone grit size 4.75mm. To 20mm. And cement, including all cost of material labour and T&Petc. Required for proper completion of the work.
Deep struck cement pointing with cement and coarse sand mortar 1:2 complete in all respect including all lead, lifts, cost of material, labour and T&P etc.
Providing & fixing drainage pipe in slab of 75mm. Dia PVC including all cost of material, labour and T&P etc. required for proper completion of the work.
Laying class M-150 brick soling, including all cost of labour and T&P as per direction of engineer in charge
providing and placing 25mm. Thick joint filter board with all cost of material, labour and T&P etc. complete
Earth work in making ramp from ordinary soil incuding lead upto 100m. And lift 1.5M. With manual compaction and proper completion of the work as per direction engineer in charge
M/S- S. CONSTRUCTION
MS SIINGHH ASSOCIATES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .