| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC NO 403 BENGALI COLONY RANJHI JABALPUR MP 482001 | JABALPUR | JABALPUR | MADHYA PRADESH | 482001 | ₹1.2 Cr | L1 | Accepted-AOC BEING LOWEST REASONABLE BIDDER |
| 2 | L2₹1.3 Cr+₹7.9 L (6.30%)Rejected-Finance 316 VIJAY NAGAR EXTENSION RANJHI MAIN ROAD JABALPUR MP | JABALPUR | MADHYA PRADESH | 482001 | ₹1.3 Cr+₹7.9 L (6.30%) | L2 | Rejected-Finance OTHER THAN LOWEST BIDDER |
| 3 | L3₹1.3 Cr+₹9.3 L (7.43%)Rejected-Finance | ₹1.3 Cr+₹9.3 L (7.43%) | L3 | Rejected-Finance OTHER THAN LOWEST BIDDER |
| 4 | L4₹1.4 Cr+₹10.4 L (8.33%)Rejected-Finance | ₹1.4 Cr+₹10.4 L (8.33%) | L4 | Rejected-Finance OTHER THAN LOWEST BIDDER |
| 5 | L5₹1.4 Cr+₹12.6 L (10.1%)Rejected-Finance | ₹1.4 Cr+₹12.6 L (10.1%) | L5 | Rejected-Finance OTHER THAN LOWEST BIDDER |
| Sl No | Description | Qty | Unit | NIHAL ENTERPRISES L7 | POONAM ELECTRIC INDUSTRY L6 | J.P ENTERPRISES L1 | M/S RAKESH TRADERS L4 | PARAS BROTHERS L5 | JYOTI ENTERPRISES L3 | M/s PARASRAM MULCHANDANI L2 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Surface excavation not exceeding 30 cm deep and averaging 15 cm deep and getting out in any type of soil complete all as specified. | 930 | Sqm | 40 ₹37,200 | 25 ₹23,250 | 30 ₹27,900 | 20 ₹18,600 Lowest | 20 ₹18,600 Lowest | 30 ₹27,900 | 30 ₹27,900 |
| 2.00Blank | ||||||||||
| 3.00 | M&L Broken stone or boulders hardcore of gauge not exceeding 63 mm, deposited, spread and levelled in layers not exceeding 15 cm thick, watered and rammed to a true surface complete all as specified and directed. | 118.95 | Cum | 1,200 ₹1,42,740 | 950 ₹1,13,002.5 | 1,000 ₹1,18,950 | 920 ₹1,09,434 Lowest | 1,000 ₹1,18,950 | 1,200 ₹1,42,740 | 1,000 ₹1,18,950 |
| 4.00Blank | ||||||||||
| 5.00 | M&L PCC 1:4:8 type D2 using 40mm graded stone aggregate as in fdn filling mass concrete complete all as specified. | 48.3 | Cum | 3,500 ₹1,69,050 | 3,000 ₹1,44,900 | 3,200 ₹1,54,560 | 280 ₹13,524 Lowest | 3,500 ₹1,69,050 | 3,500 ₹1,69,050 | 3,000 ₹1,44,900 |
| 6.00 | M&L PCC 1:3:6 type C2 using 40mm graded stone aggregate as in walls or retaining walls, any thickness, size or shape including pilasters, buttresses columns, pillars, boundary pillars and posts (including caps and bases) complete all as specified. | 36.2 | Sqm | 400 ₹14,480 | 350 ₹12,670 | 3,500 ₹1,26,700 | 300 ₹10,860 Lowest | 300 ₹10,860 Lowest | 4,600 ₹1,66,520 | 300 ₹10,860 Lowest |
| 7.00 | M&L for forming embarkment including raising (or lowering ) earth spreading in layer n.exc. 30cm thick watering , ramming / rolling and finishing to requried size and slope etc n. exc 1.5 mtr high from base concrete complete all as specified. | 18 | Cum | 150 ₹2,700 | 150 ₹2,700 | 100 ₹1,800 | 140 ₹2,520 | 100 ₹1,800 | 95 ₹1,710 Lowest | 120 ₹2,160 |
| 8.00 | M&L forgrit/sand cushioning below interlocking paver block inc spreading and levelling complete all as specified and directed. | 2.25 | Cum | 1,300 ₹2,925 | 1,000 ₹2,250 Lowest | 1,000 ₹2,250 Lowest | 1,100 ₹2,475 | 1,000 ₹2,250 Lowest | 1,350 ₹3,037.5 | 1,100 ₹2,475 |
| 9.00 | Excavation in trenches not exceeding 1.5m wide and not exceeding 1.5m depth for foundation etc and getting out in soft/disintegrated rock etc complete all as specified and directed | 325.75 | Cum | 250 ₹81,437.5 | 180 ₹58,635 | 400 ₹1,30,300 | 160 ₹52,120 Lowest | 200 ₹65,150 | 550 ₹1,79,162.5 | 600 ₹1,95,450 |
| 10.00 | Excavation in trenches not exceeding 1.5m wide and not exceeding 1.5m depth under ground cable and pipe and getting out in hard/dense soil etc complete all as specified and directed | 220.3 | Cum | 250 ₹55,075 | 200 ₹44,060 Lowest | 250 ₹55,075 | 220 ₹48,466 | 200 ₹44,060 Lowest | 450 ₹99,135 | 300 ₹66,090 |
Tender Value
₹1.2 Cr
EMD Value
₹1.9 L
Closing Date
11 Jun 2026, 6:00 pmClosed
CWE JABALPUR
HQ COMMANDER WORKS ENGINEER, SUPPLY MARG, P B NO. 54, JABALPUR - 482001
CERTAIN SANCTIONED WORKS UNDER GE (EAST) JABALPUR
2026_MES_763683_1
82745/E8
Open Tender
Civil Works - Others
Item Rate
270 days
JABALPUR
AS PER NIT
7 documents required · 7 mandatory
₹1,000
GE (EAST) JABALPUR
₹1.9 L
Yes
9 Sept 2026
6 May 2026
18 Jun 2026
6 May 2026
11 Jun 2026
1 Jun 2026
6 May 2026 - 27 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Surface excavation not exceeding 30 cm deep and averaging 15 cm deep and getting out in any type of soil complete all as specified. | - | Sqm | - | - |
| 2 | M&L hardcore of gauge not exceeding 63 mm,Broken below sub base /plinth protection hard standing complete all as specified and directed. | - | Cum | - | - |
| 3 | M&L Broken stone or boulders hardcore of gauge not exceeding 63 mm, deposited, spread and levelled in layers not exceeding 15 cm thick, watered and rammed to a true surface complete all as specified and directed. | - | Cum | - | - |
| 4 | M&L PCC 1:4:8 type D2 using 40mm graded stone aggregate as in fdn filling mass concrete complete all as specified. | - | Cum | - | - |
| 5 | M&L PCC 1:4:8 type D2 using 40mm graded stone aggregate as in fdn filling mass concrete complete all as specified. | - | Sqm | - | - |
| 6 | M&L PCC 1:3:6 type C2 using 40mm graded stone aggregate as in fdn filling mass concrete complete all as specified. | - | Sqm | 1 | - |
| 7 | M&L for forming embarkment including raising (or lowering ) earth spreading in layer n.exc. 30cm thick watering , ramming / rolling and finishing to requried size and slope etc n. exc 1.5 mtr high from base concrete complete all as specified. | - | Cum | 2 | - |
| 8 | M&L forgrit/sand cushioning below interlocking paver block inc spreading and levelling complete all as specified and directed. | - | Cum | - | - |
| 9 | Excavation in trenches not exceeding 1.5m wide and not exceeding 1.5m depth for foundation etc and getting out in soft/loose soil etc complete all as specified and directed | - | Cum | - | - |
| 10 | Excavation in trenches not exceeding 1.5m wide and not exceeding 1.5m depth under ground cable and pipe and getting out in hard/dense soil etc complete all as specified and directed | - | Cum | 1 | - |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.72 MB
TENDER_82745.pdf
Tender Documents • 2.30 MB
BOQ_855411.xls
BOQ • 0.50 MB
CorrD_3.pdf
PDF • 0.33 MB
CorrigendumD82745.pdf
PDF • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .