| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 CrAccepted-AOC B 104 KESAR GARDEN APARTMENT SECTOR 48 NOIDA GAUTAM BUDDH NAGAR | NOIDA | GAUTAM BUDDH NAGAR | UTTAR PRADESH | ₹2.9 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹3.1 Cr+₹16.0 L (5.53%)Rejected-Finance ALIGARH UTTAR PRADESH | ALIGARH | UTTAR PRADESH | 202001 | ₹3.1 Cr+₹16.0 L (5.53%) | L2 | Rejected-Finance L2 |
| 3 | L3₹3.1 Cr+₹17.8 L (6.15%)Rejected-Finance KRISHNA COMPLEX JAIN COLLEGE ROAD SAHARANPUR UTTAR PRADESH PIN CODE 247001 | SAHARANPUR | SAHARANPUR | UTTAR PRADESH | 247001 | ₹3.1 Cr+₹17.8 L (6.15%) | L3 | Rejected-Finance L3 |
| 4 | L4₹3.1 Cr+₹20.6 L (7.14%)Rejected-Finance NAYA GAON CHANDPUR BULANDSHAHAR UP | GONDA | UTTAR PRADESH | 271001 | ₹3.1 Cr+₹20.6 L (7.14%) | L4 | Rejected-Finance L4 |
| 5 | L5₹3.1 Cr+₹24.3 L (8.40%)Rejected-Finance ALAMPUR FATEHPUR JANPAD ALIGARH | ALIGARH | UTTAR PRADESH | ₹3.1 Cr+₹24.3 L (8.40%) | L5 | Rejected-Finance L5 |
Tender Value
₹3.7 Cr
EMD Value
₹7.3 L
Closing Date
10 Sept 2024, 4:00 pmClosed
Superintending Engineer
3rd Circle, Irrigation Works, 139 Mall Road, Pratappra, Agra
Restoration from Km 0.000 to Km 17.200 of Rajwah Govardhan and demarcation work of Canal Land under the jurisdiction of upper Division, Agra Canal, Mathura in District Mathura
2024_UPIDC_943458_2
02/SE/2024-25
Open Tender
Civil Works
Item Rate
180 days
Mathura
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,720
₹7.3 L
28 Dec 2024
5 Aug 2024
10 Sept 2024
5 Aug 2024
10 Sept 2024
5 Aug 2024
Amount
Earth work in Cutting or in Embankment with ordinary soils including lead up to 30m and lift up to 1.5m including dressing and manual compaction etc.complete.
Earth work in foundation in dry ordinary soil (loam clay or sand) including lift up to 1.5 meter and lead up to 30 meter and including back filling, watering and ramming of excavated earth into the trenches or into the space between the structure and the sides of foundation trenches or into the plinth with removal and disposal or surplus earth as directed by the Engineer-in-charge up to a distance of 30M from the foundation trenches
Centering and shuttering of C.C. work including rent of shuttering material, labour and T&P required for proper completion of work
Providing and laying Cement concrete (1:4:8) in base with cement , coarse sand , and 20mm to 40mm stone ballast including cost of all material, labour and T&P etc.complete.
Laying C.C. 1:3:6 Mix cement, coarse sand & 20 well graded mm down graded stone grit including cost of all material, labour and T&P etc. complete but excludiing cost of shuttering.
Brick work in 1:4 cement mortar with cement , coarse sand , and M-150 bricks . including cost of all material, labour and T&P etc.complete.
Providing and laying CC. (1:2:4) with grit Size 10-20mm including cost of all material, labour and T&P etc.complete.
Supply and Laying coarse sand(moorum) in filter below raft & PITCHING including cost of all material, labour and T&P etc..
Supply and Laying 4.75mm -10 mm coarse aggregate in filter below pitching including cost of all material, labour and T&P etc..
Supplying & Laying, filling, packing and pitching of cut/split stone 25 to 40 Kg. including carriage from stock yard to site of work including cost of labour, T & P etc. complete
Struck deep pointing in 1:2 on brick masonry ,cement , coarse sand including cost of all material, labour and T&P etc. complete.
Supplying & Fixing 150 mm. inner dia NP-2 socket hume Pipe placing in position i/c all material, Labour, T&P etc. Complete.
Providing and laying RCC. (1:1.5:3) including cost of all material, labour and T&P etc.complete.
Providing and laying CC. (1:1.5:3) including cost of all material, labour and T&P etc.complete.
Supplying of steel bars with bending,binding,cutting and placing of reinforcement including cost of wire including all material, labour and T&P etc.complete.
Uprooting jhunds and moonj including disposal away from site.
Earth work in embankment by power transported earth with a lead beyond 200m. and upto 1.00 Km. including excavation, loading, unloading, manual compaction, dressing and all lifts complete excluding royalty will be applicable from time to time on Govt.
Finishing walls with acrylic smooth exterior paint of approved brand and manufacturer and required shade on undecorated wall surface to give even shade over 2.20 lt/10 sqm i/c one coat of primer applied 1.67 lt /10 sqm coat curing and cost of all materials labour ,t&p etc required for proper completion of work for two coat
brick on laid flat flooriing with first class bricks with 1:4 CM in proper alignment also including cost of all material labour and T&P complete required for proper comletion of work.
Providing & Laying 4.0 cm thick C.C. floor with cement, approved coarse sand and 2 cm (3/4") graded approved stone ballast, laid in panels finished with 3mm (1/8") floating coat of neat cement and giving them a uniform finish including labour, tools and plants etc. required for proper completion of the work without cost of materials.
P/F Sign board
S F INFRA PROJECTS (BID ID -4517584)
Durga Engineers and Earth Movers (BID ID -4558128)
M/S UNITE ENTERPRISES (BID ID -4558255)
BHAMAR SINGH (BID ID -4554105)
M/S JAMEEL CONTRACTOR (BID ID -4555867)
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .