Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 LAccepted-AOC | ₹4.2 L | L1 | Accepted-AOC After drawl of transparent lottery |
| 2 | L1₹4.2 LRejected-AOC | ₹4.2 L | L1 | Rejected-AOC After drawl of transparent lottery |
| 3 | L1₹4.2 LRejected-AOC AT BAGHUABOL TALCHER DIST ANGUL ODISHA 759100 | ANUGUL | ODISHA | 759100 | ₹4.2 L | L1 | Rejected-AOC After drawl of transparent lottery |
| 4 | L1₹4.2 LRejected-AOC | ₹4.2 L | L1 | Rejected-AOC After drawl of transparent lottery |
| 5 | L1₹4.2 LRejected-AOC | ₹4.2 L | L1 | Rejected-AOC After drawl of transparent lottery |
Tender Value
₹4.2 L
EMD Value
₹4,210
Closing Date
7 Jul 2026, 6:00 pmClosed
E.E., R.W. Division-I, Ganjam, Berhampur
O/o the S.E., R.W. Division No.-I, In-front of De-paul School, Engineering School Road, Ganjam, Berhampur, 760010
RI office Motabadi
2026_CERWI_134110_1
OT-06/SERWDG-I/2026-27
National Competitive Bid
Civil Works - Buildings
Percentage
30 days
Berhampur
2 documents required · 2 mandatory
₹2,000
₹4,210
Yes
7 Sept 2026
2 Jul 2026
8 Jul 2026
2 Jul 2026
7 Jul 2026
2 Jul 2026
2 Jul 2026 - 6 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation in hard soil with all leads & lifts including dressing the sides & leveling the bed of the foundation to the required width & required depth including shoring shuttering, propping bullah, pilling, dewatering from foundation supplying & working of pumps including hire & running charges of pumps & all machineries required for the work & providing coffer dam if required & stacking the excavated materials away from the working areas with Cess complete as per specification & direction of the Engineer-in-charge. | 21.1 | cum | 282.89 | ₹5,968.98 |
| 2 | Filling in foundation and plinth with sand including watering and remming with all leads & lifts including cost, conveyance, royalty, DMF (10% over Royality), EMF (5% over Royality), Addl Charges, cess & taxes of all materials & cost of all labour & T&P required for the work complete as per direction of Engineer-in-Charge. | 15.32 | cum | 810.68 | ₹12,419.62 |
| 3 | Providing Plain Cement concrete M-15 in foundation upto a required depth below ground level and upto a required height above ground level/bed level using 40mm down graded hard granite aggregates of approved quality from approved quarry including hoisting, lowering, laying compacting in position in layers to proper slope & level including watering, curing and cost, conveyance, Cess, royality, additional charges, DMF 10% & EMF 5% over royalty taxes of all materials etc. with all labour and T&P required for the work including dewatering, shuttering if necessary complete as per direction of Engineer-in-charge.
Foundation | 3.52 | cum | 5,403.27 | ₹19,019.51 |
| 3.01 | Sub-Structure | 6.92 | cum | 5,522.07 | ₹38,212.72 |
| 4 | Providing Cement concrete (1:2:4) in foundation upto a required depth below ground level and upto a required height above ground level/bed level using 4cm size hard granite metal of approved quality from approved quarry including hoisting, lowering, laying compacting in position in layers not exceeding 15cm thick compacting with proper packing to proper slope & level including watering, curing and cost, conveyance, Cess royality, additional charges, DMF 10% & EMF 5% over royalty taxes of all materials etc. with all labour and T&P required for the work including dewatering, shuttering if necessary complete as per direction of Engineer-in-charge. | 0.58 | cum | 7,965.42 | ₹4,619.94 |
| 5 | RCC of design mix of M-250 grade of controlled qulity having cube strength of 250kg./cm2 in design mix with minimum quantity of cement as specified in IRC Code of 150 mm. cubes at 28 days curing after mixing & tests conducted in accordance with relevant clauses of IS 456/IS 516/IRC 16/1987/IRC-78/1983 using crusher broken hard granite course aggregate of 10 mm. to 20mm. sizes & proportion as specified in clause-302.6.2 of IRC 21/1987, IS-10262 & subject to mix design in conformity with the grading & proportion of different materials for concrete as specified in the relevant codes of approved quality, obtained from approved quarry & using minimum quantity of cement confirming to codal provision including hoisting, lowering & laying concrete in layers not exceeding 15cm thick compacting with vibrators watering & curing for 28 days including water tight steel centering & shuttering & form works finishing the exposed surface smooth providing beads & grooves, fan hooks wherever necessary including cost, conveyance royalties, DMF (10% over Royality), EMF (5% over Royality), Addl Charges Cess and all other taxes of all materials with all leads & lifts, cost of all labour T&P & machineries etc. required for the work including dewatering if necessary, complete in all respects as per direction of the Engineer-in-Charge but excluding cost, conveyance of tor steel & binding wire & labour charges for straightening, cutting, bending, binding welding & tying the grills lapping spacing etc. where ever necessary & hoisting & placing in position ( to be paid separately as required for RCC works)
Roof Slab
Ground Floor | 3.3 | cum | 14,552.82 | ₹48,024.31 |
| 6 | Supply of HYSD bars confirming to approved grade cutting bending , binding, lapping, splicing, welding etc. (conforming to ISI specification ) & jointing if necessary by lapping & tying the grills & placing in position as required for RCC works as per the approved design, hoisting, lowering & laying position including cost & conveyance, Cess of tor steel & binding wires of 18 to 20 gauge ( as approved by the Deptt. ) etc. complete (Weight of binding wire shall not be considered for payment at all which will be bome by the contractor (standard CO-efficient of different size of the steel shall be considered & welding & lapping should confirm to relevant clause of IRC - 21/1987) as per direction of the Engineer in charge. | 1.65 | qtl | 9,688.68 | ₹15,986.32 |
| 7 | Clearing and grubbing road land in area of light jungle including uprooting rank vagetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of tress cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned upto a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness including watering and cost of labour, cess & all materials etc. complete as per direction of Engineer-in-charge. | 39.06 | sqm | 8.63 | ₹337.09 |
| 8 | Dismantaling GCI or Ac Sheet roofing after carefully removing the bolts and nuts including stacking of he materials for reuse and removing the debris within 50mtr lead etc. complete as per direction of Engineer-in-charge. | 1.09 | sqm | 101.33 | ₹110.45 |
| 9 | Fitting fixing GCI sheet roof drilling hole in wind ties including fixing of ridge valleys wind ties etc. excluding cost of fitting as per direction of Engineer-in-charge. | 2.18 | sqm | 570.87 | ₹1,244.5 |
stage.html
html • 0.10 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_599277.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 29.31 MB
Tendernotice_1.pdf
PDF • 3.52 MB
BOQ_599277.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .