Tender Value
₹19.4 L
EMD Value
₹38,900
Closing Date
20 Feb 2026, 3:30 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Revenue
Above/Below/Par
CRWS/ENGG
24 conditions · 3 needing a document upload
The said suppliers of goods and/or services would be subject to GST Act and Rules as applicable from time to time. Tenderers are requested to submit their offers as per GST Tax regime. All the bidders/tenderers should ensure that they are GST compliant and their quoted tax structure/rates are as per GST Law
Tenderers are required to submit a copy of cancelled cheque in order to facilitate the payments regarding refund of EMD etc. in their proper accounts.
Successful tenderers are required to submit the number of labour to be employed for this particular work. Also the list showing names, along with all other details, of male and female workers employed in this work, should be submitted to office, at the time of submitting performance guarantee and before executing contract agreement. They should also ensure that 1) The payment to the contract labour should be made through bank/cheque. 2) Identity Cards should be issued to all contract workers. 3) Necessary steps should be taken to deduct provident fund from the payment made to contract labour and ensure that the same is credited to their Provident Fund account. 4)Medical facilities from ESI should be ensured, if applicable
Format of Declaration and Self certificate in case of small value tenders, (i.e. tender value less than Rs. 50 lakhs), is being attached in Documents Tab. Tenderers should download, fill and submit both the proforma along with their offer, failing which offer may be rejected summarily.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
In addition to latest provisions of GCC, and all contents of tender documents, all other latest instructions of Railway Boards issued vide various letters received from time to time on concerned matters and related to tender, will also be applicable for the tenders as per necessity and tenderers have to co-operate with Railways and ensure the compliance
We agree to carry out all works with use of modern equipments of required capacity for the work without extra payment. The decision of railway engineer shall be final and binding in this regard.
It is the responsibility of contractor to arrange the payment of the labour employed for the work through bank and to deduct PF as per the provisions of Minimum Wages Act.
The quantities shown above are approximate and to give a general guideline. Railway reserves a right to increase, decrease or to delete any of the items mentioned in schedule
As per Advanced correction slip no. 1 of Railway Boards L. No. 2022/CEI/CT/GCC-2022/Policy New Delhi, Dated 14.07.2022, the PVC Clause shall be applicable only in Tenders having advertised value above Rs. 2 Crores. Tenderers should take a note and quote their rates accordingly.
GCC April 2022 has been introduced and published/available on railways website. The provisions of GCC 2022 will be applicable on the tenders Published in and after April 2022. Tenderers are requested to download the same from the railways website and ensure the implementation of the latest Provisions made in GCC while execution of work.
Maintenance period for this work will be 12 moonths from the date of successful completion of work.
Tenderers are advised to quote their rates including all type of taxes and levies etc. to be paid by them. Any extra payment will not be made on account of taxes/Levies etc., in excess of Contract Agreement Value
In case of submission of Bid Security in the form of Bank Guarantee, a scanned copy of Original BG valid for a period of 90 days beyond the validity period of tender, and addressed in favour of FA & CAO/WCR/JBP, shall be uploaded on IREPS portal while applying for tender. And As per ACS 2 to GCC April 2022, circulated vide Railway Board letter dt. 13.12.22, original BG should be delivered in person to the Concerned Official in Office before closing date for submission of bid (i.e. Excluding the last date of submission of bid) without fail. Any failure in this connection shall lead to summary rejection of bid
Provision of Telemetry based digital water meter & piezometer system equipped with latest technology at CRWS BPL
CRWS-BPL-ENGG-2025-26-06~WCR
CRWS-BPL-ENGG-2025-26-06
Open
Works - General
2 Months
Bhopal, Madhya Pradesh
₹0
₹38,900
20 Feb 2026
29 Jan 2026
6 Feb 2026
11 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 19,43,200.4 | ||
| — | 1.00 | — | — | ||
| Supply and installation of a piezometer equipped with 8 GB internal data storage capacity for long-term monitoring and recording of groundwater levels made with 316L Stainless Steel (SS) port to ensure high strength, durability, and corrosion resistance having Protective housing of IP65 grade ABS material | — | — | — | 65,018 | |
| — | 24.00 | — | — | ||
| Providing and fixing of a digital water flow meter of 2-inch nominal diameter for precise measurement of flow parameters. Internally lined with PTFE material integrated with telemetry | — | — | — | 9,29,462.4 | |
| — | 24.00 | — | — | ||
| Registration and configuration of telemetry devices with a secured server environment. Establishment of a cloud-based monitoring and reporting system for real-time access, storage, and analytics. Setup and activation of data points for continuous and reliable transfer of field data. | — | — | — | 4,24,800 | |
| — | 24.00 | — | — | ||
| Supply and provision of all accessories set for successful setup and operation. including:- High-quality cables for data and power transmission. Junction boxes for safe and organized connectivity. Flanges, clamps, and fittings for secure mechanical mounting and integration. | — | — | — | 4,10,640 | |
| — | 24.00 | — | — | ||
| Complete installation of telemetry-based digital water meters, piezometers, and associated equipment at site. Integration with the central server room for synchronized monitoring. | — | — | — | 1,13,280 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .