Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1ST₹12.7 LAccepted-AOC | ₹12.7 L | 1ST | Accepted-AOC SUCCESSFUL |
| 2 | Rejected-Technical | - | - | Rejected-Technical UNSUCCESSFUL |
Tender Value
₹12.7 L
EMD Value
₹12,693
Closing Date
18 Dec 2025, 5:00 pmClosed
COMMISSIONER, SMC
SAMBALPUR MUNICIPAL CORPORATION, DURGAPALI, SAMBALPUR, 768006
Construction of Drain with cover slab at from sunapali tank towards goutiapada, w.no. 33, under SMC.
2025_ORULB_122591_33
22/SMC_SBP/2025-26
Open Tender
Civil Works - Others
90 days
SAMBALPUR MUNICIPAL CORPORATION
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹12,693
Yes
15 Apr 2026
9 Dec 2025
19 Dec 2025
9 Dec 2025
18 Dec 2025
9 Dec 2025
Dismentaling and removing cement concrete including stacking the useful materilas for reuse and removing the debris within 50M lead
Removal of excavated dismentaled materilas away from work site by mechanical means within 5KM lead including loading unloading etc complete
Earth Excavation of foundation in hard soil within initial lead & lift including leveling the bed & depositing the soil away working area etc completed as direction of Engineer.
Supply fillimg sand in F & P including cost, conveyance & royalty od sand cost of all labour cess, Watering, raming etc
Cement Concrete (1:4:8) using 4cm size B.H.G. (C. B.) Metal including cost, conveyance , royalty & taxes of all materials etc. complete
Rigid & smooth centering & shuttering for C.C.works including dismantling for reuse after casting etc. complete.
R.C.C. M20 grade using 20mm and down graded size chips including cost conveyance etc. complete
Supplying fitting fixing and placing uncoated HYSD bar reinforcement complete as per drawing and technical specification
Providing, spreading Quarry Rubbish in Sub-Base in layers not exceeding 22.5cm. including watering ,compacting to the required density in O.M.C. with rolling by Vibratory Roller as per O.P.W.D. specifications including cost, conveyance & royalty of all materials,cost of all labour, T & P, labour cess, watering, turfedging, hire & running charges of Vibratory Roller etc. complete.
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_570261.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
BOQ_570261.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid