Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹81,977.11Admitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹86,353.15+₹4,376.04 (5.34%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹86,539.57+₹4,562.46 (5.57%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹93,211.56+₹11,234.45 (13.7%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹98,100
EMD Value
₹2,943
Closing Date
21 Sept 2026, 6:00 pmClosed
Office of the Executive Engineer REW Anantnag
Office of the Executive Engineer REW Anantnag
C/O L/ROAD WITH E/WALL NHO FAYAZ BHAT AND OTHERS AT BANDERPORA BLOCK DPORA
2026_RDPR_324543_41
ENIT108of2026-27
Open Tender
Civil Works
Percentage
30 days
Anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Office of the Executive Engineer REW Anantnag
₹2,943
25 Sept 2026
14 Sept 2026
22 Sept 2026
14 Sept 2026
21 Sept 2026
14 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Site Clearence including removing vegetation and inequalities , roots, saplings temporary diversion of | 2 | lab | 625 | ₹1,250 |
| 2 | Earth work in excavation by manual means in trenches for foundations drains , pipes , cablesetc. (not exceeding 1.5 m in width ) and for shafts ,wells , cesspits and the like not exceeding 60 sqm on plan depth up to 1.5 m including disposal ofexcavated earth up to 1 m from cutting edge disposal earth is to be leveled and neatly dressed in all kinds of soil. | 2.71 | cum | 479.3 | ₹1,298.9 |
| 3 | Providing and laying stone soling hand packed in foundation complete with all costs and carriages. | 2.1 | cum | 1,000 | ₹2,100 |
| 4 | Providing and laying in position cement concrete of specified grade Of 1:3:6 mix ( 1 cement : 3 coarse sand : 6 graded stone agg.20 mm nominal size incl the cost and carriage of cement complete Excluding cost of centering and Shuttering all work up to plinth level. | 4.92 | cum | 5,733.6 | ₹28,209.31 |
| 5 | Centering & shuttering including strutting & propping etc in foundations footings, bases of columns etc incl. removal of forms complete job | 49.2 | cum | 286.35 | ₹14,088.42 |
| 6 | 12 mm cement plaster in 1:6 | - | cum | 268.4 | - |
| 7 | Supplying and stacking of graded stone aggregate at site of size range 63 mm to 45 mm (excluding carriages).(Quarry) | 3.95 | cum | 1,204.2 | ₹4,756.59 |
| 8 | Supplying and stacking of stone screenings/ chippings at site. excluding carriage.(13.2 mm nominal size | 0.58 | cum | - | - |
| 9 | Supplying , stacking and laying of Stone Dust incl. required compaction at site excluding carriages. | 0.27 | cum | 668.95 | ₹180.62 |
| 10 | Laying water bound macadam with specified stone aggregate stone screening and binding material including screening, sorting, spreading to template and consolidation with power road roller of 8 to 10 tonne
capacity etc. complete (Payment for stone aggregate, screenings, kankar, moorum and red bajri etc. to be made separately). | 3.42 | cum | 768.15 | ₹2,627.07 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
BOQ_1094959.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .