Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-AOC | ₹1.4 Cr | L1 | Accepted-AOC L1 |
| 2 | Not Admitted-Finance | - | - | Not Admitted-Finance Not qualified for AOC |
| Sl No | Description | Qty | Unit | SHRI KRISHNA SHUKLA L1 |
|---|---|---|---|---|
| 1.00 | Earth work in filling for slope & bed of canal including all lead & lift with all cost of material,labour,T & P etc. required for proper completion of work. | 5,384.85 | Cum. | 140 ₹7,53,878.44 |
| 2.00 | Laying C.C. M-15 (1:2:4) mix in foundation with Kabrai crushed gritt 10 to 20 mm size coarse sand of F.M. not less than 2.0, including all cost of material, labour, T & P etc. required for proper completion of work. | 47.66 | Cum. | 12,200 ₹5,81,391 |
| 3.00 | Filling Local Sand including carriage with all cost of labour and T&P charges etc. | 275.1 | Cum. | 275 ₹75,652.5 |
| 4.00 | Supplying and laying Geo Textile sheet made of 200 gsm woven multifilament polypropylene yarn including all cost of labour, T&P and material charges etc. | 917 | Sqm | 105 ₹96,285 |
| 5.00 | Boulder masonary in 1:4 C:M with coarse sand,of F.M. not less than 2.0, including all cost of material,labour, T & P etc. required for proper completion of work. | 252.04 | Cum. | 9,400 ₹23,69,138.4 |
| 6.00 | Stone grit (4.75 to 10mm) in side slope 75 mm thick including all cost of material,labour, T & P etc. required for proper completion of work. | 68.85 | Cum. | 5,900 ₹4,06,215 |
| 7.00 | Stone grit (10 to 20mm) in side slope 75 mm Thick including all cost of material,labour, T & P etc. required for proper completion of work. | 68.85 | Cum. | 6,900 ₹4,75,065 |
| 8.00 | Supplying and laying Mirzapur hard stone Boulder in G.I. wire crate ( 1.0 x 1.0 x 1.0 ) mtr. With mesh size 20x20 cm including all cost of material with loading, unloading and carriage , labour, T & P etc required for proper completion of work. | 964.8 | Cum. | 5,900 ₹56,92,320 |
| 9.00 | Supplying & laying of Mirzapur hard stone Boulder for slope including all cost of material with loading, unloading and Carriage , labour, T & P etc. required for proper completion of work. | 408.48 | Cum. | 4,900 ₹20,01,552 |
| 10.00 | Centering and shuttering for R.C.C.work; including all cost of material, labour, T & P etc complete work. | 246.2 | Sqm | 800 ₹1,96,960 |
Tender Value
₹1.5 Cr
EMD Value
₹3.0 L
Closing Date
26 Feb 2026, 3:00 pmClosed
Superintending Engineer
Office of the Superintending Engineer Drainage Circle Gonda
Protection work downstream of the fall located at Km 17.000 of Basti Branch
2025_UPIDC_1099050_19
01/SE/2025-26
Open Tender
Civil Works
Sharwasti
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,354
₹3.0 L
26 Mar 2026
18 Feb 2026
26 Feb 2026
18 Feb 2026
26 Feb 2026
18 Feb 2026
Earth work in filling for slope & bed of canal including all lead & lift with all cost of material,labour,T & P etc. required for proper completion of work.
Laying C.C. M-15 (1:2:4) mix in foundation with Kabrai crushed gritt 10 to 20 mm size coarse sand of F.M. not less than 2.0, including all cost of material, labour, T & P etc. required for proper completion of work.
Filling Local Sand including carriage with all cost of labour and T&P charges etc.
Supplying and laying Geo Textile sheet made of 200 gsm woven multifilament polypropylene yarn including all cost of labour, T&P and material charges etc.
Boulder masonary in 1:4 C:M with coarse sand,of F.M. not less than 2.0, including all cost of material,labour, T & P etc. required for proper completion of work.
Stone grit (4.75 to 10mm) in side slope 75 mm thick including all cost of material,labour, T & P etc. required for proper completion of work.
Stone grit (10 to 20mm) in side slope 75 mm Thick including all cost of material,labour, T & P etc. required for proper completion of work.
Supplying and laying Mirzapur hard stone Boulder in G.I. wire crate ( 1.0 x 1.0 x 1.0 ) mtr. With mesh size 20x20 cm including all cost of material with loading, unloading and carriage , labour, T & P etc required for proper completion of work.
Supplying & laying of Mirzapur hard stone Boulder for slope including all cost of material with loading, unloading and Carriage , labour, T & P etc. required for proper completion of work.
Centering and shuttering for R.C.C.work; including all cost of material, labour, T & P etc complete work.
Cutting, bending, binding and placing of steel reinforcement in R.C.C. work; including all, cost of steel, binding wire,labour, T & P etc. complete work.
Drilling suitable holes in reinforced or plain cement concrete with power driven drill machine to a minimum depth of 100mm upto 200mm in RCC beams, lintels, columns and slabs to introduce steel bars for sunshades/balconies including fixing the steel bars in position using epoxy resin anchor grout of approved make but excluding the cost of reinforcement, all complete as per direction of Engineer-In-Charge.
Laying R.C.C. M-20 (1:1½:3) mix with Kabrai crushed stone grit graded 4.75 to 20mm size with coarse sand of F.M. not less then 2.0; including all cost of material, labour T & P etc required for proper completion of work.
Supply & fixing sign board ISA40x40x05mm size 1.20x2.10m. and 1.50mm thick M.S. plate, painting caution letter, including all cost of material, labour, T & P etc complete work.
Dewatering with all cost of power & P.O.L . machine, pump, well point systm and operator etc with assembling and dismentling of machine etc required for proper completion of work.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.63 MB
BOQ_2076822.xls
BOQ • 0.26 MB
LT7.pdf
Tender Documents • 15.90 MB
Download all tender documents and submit your bid