Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.2 LAdmitted-Fee/PreQual/Technical/Finance | -26.27% | ₹1.2 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹1.3 L+₹3,336.30 (2.67%)Admitted-Fee/PreQual/Technical/Finance | -24.30% | ₹1.3 L+₹3,336.30 (2.67%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2 L
EMD Value
₹4,000
Closing Date
12 Aug 2026, 3:00 pmClosed
AS PER THE NIT
AS PER THE NIT
Repair of Drain/Trash Guard from L.D Junction to Amar Singh College Junction
2026_PWDJK_319838_20
NIT NO 59/RNB/RAJ OF 2026-27 DATED 06.08.2026
Open Tender
Civil Works
Percentage
10 days
SRINAGAR
AS PER THE NIT
2 documents required · 2 mandatory
₹200
Yes
AS PER THE NIT
₹4,000
Yes
17 Aug 2026
6 Aug 2026
12 Aug 2026
7 Aug 2026
12 Aug 2026
7 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Pumping out water caused by springs, tidal or river seepage, broken water mains or drains and the like. | 16.2 | 1 kl | - | - |
| 2 | Silt clearance from canals. Inclusive of initial lead and lift ( 50m & 1.5m respectively ) Wet | 33.75 | Cum | - | - |
| 3 | Weed clearance From canals(including extraction of roots) | 36 | Sqm | - | - |
| 4 | Providing and laying of RCC/MS pipe incl. necessary earth work, excavation and filling cushion over pipes incl. cost and carriage of all materials involved as per the directions of EIC at site complete. (225 mm dia) | 5 | Rm | - | - |
| 5 | Making connection of drain or sewer line with existing manhole including breaking into and making good the walls, floors with cement concrete 1:2:4 mix (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) cement plastered on both sides with cement mortar 1:3 ( 1 cement : 3 coarse sand) finished with a floating coat of neat cement and making necessary channels for the drain etc. complete
For pipes 100 to 250 mm diameter | 2 | No. | - | - |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 79.2 | Sqm | - | - |
| 7 | Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 13.06 | Cum | - | - |
| 8 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone
aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete. 40mm thick with 20 mm nominal size stone aggregate. (including cost of all material, leads, lifts and carriages etc upto site of work complete). | 54 | Sqm | - | - |
| 9 | 15mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement : 4 fine sand) (including cost of all material, leads, lifts and carriages etc upto site of work complete). | 93.6 | Sqm | - | - |
| 10Carraige of material by mechanical Transport including loading unloading etc complete. | |||||
stage.html
html • 0.02 MB
finance_1060911.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.52 MB
BOQ_1060911.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .