| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.3 LAccepted-AOC HOUSE NO 8 589 BEHIND PHC HOSPITAL OLD BUS STAND KORBA KORBA CHHATTISGARH 495678 | 495678 | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹14.0 L+₹58,085.40 (4.34%)Rejected-Finance | L2 | Rejected-Finance Quoted other than lowest rate | |
| 3 | L3₹14.5 L+₹1.1 L (8.55%)Rejected-Finance INDEX NO B 33 NC R O KRALPORA DISTT BUDGAM SRINAGAR J K 190019 | SRINAGAR | BUDGAM | JAMMU AND KASHMIR | 190019 | L3 | Rejected-Finance Quoted other than lowest rate | |
| 4 | L4₹14.6 L+₹1.2 L (9.14%)Rejected-Finance | L4 | Rejected-Finance Quoted other than lowest rate | |
| 5 | L5₹14.6 L+₹1.3 L (9.39%)Rejected-Finance 1000 PUDA MODEL TOWN PHASE 5 BATHINDA 151001 | BATHINDA | BATHINDA | PUNJAB | 151001 | L5 | Rejected-Finance Quoted other than lowest rate |
Tender Value
₹20 L
EMD Value
₹40,000
Closing Date
23 Jun 2022, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SH ASHOK KUMAR, EE, IDSE
GE NORTH BATHINDA PIN-151004
REPAIR TO FLOOR, WALL, PLASTER, PLINTH, CHAJJAS, SHAFT ETC. IN OTM ACCN NORTH SIDE OF VIKRAM BATRA MARG UNDER AGE BR III OF GE (N) BATHINDA AT BATHINDA MIL STN
2022_MES_527163_1
8937/NIT-14/22-23
Open Tender
Civil Works
Item Rate
240 days
GE NORTH BATHINDA
Class E category a (i)
8 documents required · 8 mandatory
₹500
GE NORTH BATHINDA
₹40,000
Yes
5 Jul 2022
28 May 2022
25 Jun 2022
28 May 2022
23 Jun 2022
11 Jun 2022
28 May 2022 - 6 Jun 2022
Amount
SCHEDULE 'A' B/R Works
Taking down cement or cement lime plaster from brick wall etc including racking out joints, hacking for key & scrubbing down with water etc complete all as specified and directed by Engineer-in-Charge.
Material and labour for rendering/plastering 15mm thick in cement mortar (1:4) on any face of Brick walls or concrete surfaces or stone masonry, parapets, chajjas, shafts including finished even and smooth without using extra cement complete all as specified and as directed by the Engineer-in-Charge.
Material and labour for plastering 10mm thick in cement mortar (1:6) on fare face of Brick walls or concrete surfaces, finished even and smooth without using extra cement complete all as specified and as directed by the Engineer-in-Charge.
Material and labour for rendering/plastering 5mm thick in cement mortar (1:3) on any face of ceiling, finished fair and even and smooth without using extra cement complete all as specified and as directed by the Engineer-in-Charge.
Material and labour for preparing newly plastered or concrete surface of ceiling by sand papering or by any other mean and after preparing the surfaces applying three coats of white wash complete all as specified & directed by Engineer-in- charge
Material and labour for preparation of new plastered surfaces of walls/pillars /cornices by brooming down with using broom/sand papering or by any other means, and preparing the surfaces smooth by applying chalk whiting to make the surface even and smooth upto entire satisfaction of Engineer-in-charge, and after preparing the surfaces applying two coats of oil emulsion distemper (washable), as approved tint/colour by using paint roller brush complete all as specified and as directed by Engineer-in-Charge.
Material and labour for preparation of new plastered surfaces of walls/pillars /cornices by brooming down with using broom/sand papering or by any other mean, washing down with water and applying two coats of cement base paint (one coat as as priming coat) as per approved tint/colour by using paint brush complete all as specified and as directed by Engineer-in-Charge.
Demolition of brick work or stone / boulder masonry, built in cement mortar or cement lime mortar including all quoins, arches, pillars, etc, in any description including cleaning and stacking serviceable brick for re use and balance removing rubbish from the site complete all as specified and as directed by Engineer-in-charge.
Material and labour for brick work with sub class ‘B’ old size burnt clay bricks, straight or curved on plan exc. 6 metre mean radius built in cement mortar (1:6) complete all as specified and as directed by Engineer-in-charge.
Material and labour for brick work in half brick thick wall using burnt clay bricks (sub class 'B' old size burnt clay bricks) straight or curved on plan to any radius built in cement mortar (1:4) complete all as specified and as directed by Engineer-in- charge.
Demolition of floor hearth or wall tilling including cement mortar bedding but not backing including removing rubbish material from building and thrown in low lying empty area (as per direcction of AGE/JE) at any distance upto 500 metres from the site complete all as specified and as directed by Engineer-in-Charge
Material and labour for Glazed ceramic coloured tiles of size 300mmx 200mm, 7mm to 8mm thick, as in vertical surface set and jointed in neat cement slurry and pointed in white or coloured cement to match the shade of tile including necessary cutting as per site requirement, tiles laid over and including 10 mm thick (Av thickness) bedding layer (rendering) in cement mortar (1:4) complete all as specified and as directed by Engineer-in-Charge.
Material and labour for Glazed ceramic coloured tiles of size 350mmx 250mm / 450mmX 350mm// 450mmX 300mm, 7mm to 8mm thick, as in vertical surface set and jointed in neat cement slurry and pointed in white or coloured cement to match the shade of tile including necessary cutting as per site requirement, tiles laid over and including 10 mm thick (Av thickness) bedding layer (rendering) in cement mortar (1:4) complete all as specified and as directed by Engineer-in-Charge.
Material and labour for Non Skid ceramic coloured tiles 7 to 8mm thick square or rectangular area of each tile exceeding 0.06 sqm but not exceeding 0.11 sqm, as in floor set and jointed in neat cement slurry and pointed in white or coloured cement to match the shade of tile including necessary cutting as per site requirement, tiles laid over and including 15 mm thick bedding layer (screed) in cement mortar (1:6) complete all as specified and directed by Engineer-in-Charge.
Material and labour for Non Skid ceramic coloured tiles 7 to 8 mm thick square or rectangular area of each tile exceeding 0.11 sqm but not exceeding 0.18 sqm, as in floor set and jointed in neat cement slurry and pointed in white or coloured cement to match the shade of tile including necessary cutting as per site requirement, tiles laid over and including 15 mm thick bedding layer (screed) in cement mortar (1:6) complete all as specified and directed by Engineer-in-Charge.
Material and labour for Non Skid ceramic coloured tiles 7 to 8mm thick square or rectangular each tile exceeding 0.11 sqm but not exceeding 0.18 sqm, as in skirting, dado etc. set and jointed in neat cement slurry and pointed in white or coloured cement to match the shade of tile including necessary cutting as per site requirement, tiles laid over and including 10 mm thick bedding layer (screed) in cement mortar (1:4) including making good excess taking down plaster area (above skirting tile ) complete all as specified and directed by Engineer-in-Charge.
Material and labour for Non Skid ceramic coloured tiles 7 to 8mm thick square or rectangular area of each tile exceeding 0.18 sqm but not exceeding 0.38 sqm, as in floor set and jointed in neat cement slurry and pointed in white or coloured cement to match the shade of tile including necessary cutting as per site requirement, tiles laid over and including 15 mm thick bedding layer (screed) in cement mortar (1:6) complete all as specified and directed by Engineer-in-Charge.
Material and labour for Non Skid ceramic coloured tiles 7 to 8mm thick square or rectangular each tile exceeding 0.18 sqm but not exceeding 0.38 sqm, as in skirting, dado etc. set and jointed in neat cement slurry and pointed in white or coloured cement to match the shade of tile including necessary cutting as per site requirement, tiles laid over and including 10 mm thick bedding layer (screed) in cement mortar (1:4) including making good excess taking down plaster area (above skirting tile ) complete all as specified and directed by Engineer-in-Charge.
Material and labour for vitrified ceramic coloured tiles (light shade) 10 mm thick square or rectangular area of each tile not exceeding 0.36 sqm, as in floor, set and jointed in neat cement slurry and pointed in white or coloured cement to match the shade of tile including necessary cutting as per site requirement, tiles laid over and including 15 mm thick bedding layer (screed) in cement mortar (1:6) complete all as specified and directed by Engineer-in-Charge.
Material and labour for vitrified ceramic coloured tiles (light shade) 10mm thick square or rectangular area of each tile not exceeding 0.36 sqm, as in skirting, dado etc. set and jointed in neat cement slurry and pointed in white or coloured cement to match the shade of tile including necessary cutting as per site requirement, tiles laid over and including 10 mm thick bedding layer (screed) in cement mortar (1:4) complete all as specified and directed by Engineer-in-Charge.
Material and labour for endura tiles/stone (coloured/designer) heavy duty of size 300mm x 300mm, 10-12mm thick, as in floor, set and jointed in neat cement slurry and pointed in white or coloured cement to match the shade of tile including necessary cutting as per site requirement, tiles laid over and including 15 mm thick bedding layer (screed) in cement mortar (1:6) complete all as specified and directed by Engineer-in-Charge.
Material and labour for 25mm thick PCC 1:2:4, type B-0 (20mm graded aggregate) in levelling course, sub base, floor and like, complete all as specified and directed by Engineer-in-Charge.
Dismantling of stone/bricks, PCC tiles, interlocking tiles laid flat of any description or thickness in floors, aprons etc. laid dry or laid dry and pointed in any mortar including removing rubbish material from the site including taking out existing fine sand cleaning the surface complete all as specified and as directed by Engineer-in-charge.
Supply & fixing 20 cm x 20 cm x 25 mm thick chequered cement concrete tiles as in floor/path, set, jointed and pointed in neat cement slurry with grey cement and no pigment, tiles laid over and including 15 mm thick bedding layer (screed) in cement mortar (1:6) complete all as specified and as directed by Engineer-in-Charge.
Material and labour 20mm thick machine cut, granite duly factory grinding and polished (table rubbed and polished) of approved colour for counter sunk wash basin, plateform/cooking plateform or as directed, including screed bed 15mm thick in cement mortar (1:4) (grey cement slurry) including pointing in white cement (1:2) using marble dust with admiture of pigment to match with shade of granite stone slab including cutting as required including cleaning and extra polishing if required complete all as specified and as directed by Engineer-in-Charge.
Material and labour for machine cut 18 to 22 mm thick, Kota stone slab (size of slab not less than 550x550mm) as in flooring, laid over and including 20mm thick bedding layer in cement mortar (1:6) and jointed with grey cement slurry mixed with pigment to match the shade of slab including rubbing /grinding (mirror finish) and polishing by machine, including machine cutting to make it square or rectangular as per site complete all as specified and as directed by Engineer-in-Charge.
Material and labour for machine cut 18 to 22mm thick, Kota stone slab as in riser of steps, skirting, dado and on pillar, laid over and including 10 mm thick bedding layer in cement mortar (1:4) and jointed with grey cement slurry mixed with pigment to match the shade of slab including rubbing /grinding (mirror finish ) and polishing by machine, including machine cutting to make it square or rectangular complete all as specified and as directed by Engineer-in-Charge.
Demolition of cement concrete (unreinforced) in ground floor and paving not exceeding 15cm thickness below or above ground level of any description and in any position including removing rubbish material from building and thrown in low lying empty area (as per direcction of AGE/JE) at any distance upto 500 metres from the site complete all as specified and as directed by Engineer-in-Charge
Material and labour for PCC ( 1:4:8), type D-2 using 40 mm graded stone aggregate as in foundation filling, sub base and mass concrete, complete all as specified and as directed by Engineer-in-charge.
Material and labour for 75 mm thick PCC (1:3:6) type C-2 using 40mm graded stone aggregate as in flooring, hard standing, plinth protection/path etc. finished even and smooth without using extra cement including demolition of cement concrete (unreinforced, existing plinth floor, hard standing etc ) of any description and in any position including removing rubbish material from building and thrown in low lying empty area (as per direcction of AGE/JE) at any distance upto 500 metres from the site complete all as specified and as directed by Engineer-in-Charge
Material and labour for 100mm thick cement concrete (1:2:4), type B-2 using 40 mm graded stone aggregate as in foot path, flooring, ramp, hard standing, paving/path etc., in alternate panels, size as directed and surface finished even & smooth without using extra cement including necessary form work complete all as specified and as directed by Engineer-in-charge.
Supply and fixing 60 mm thick (M35 grade) coloured, precast interlocking tile/paving block factory casted (made by using PVC paver mould / Rubber paver moulds on Vibrating Table Machine) using grey cement and no pigment, shape haxagon / trigular / zigzag / I-shaped etc, as directed, prepolished & preglazed, specification as per relevant IS, having compressive strength not less than 350 Kg/ Sqcm, laid over sand upto required thick layer and filling the interstices etc complete all as specified and as directed by the Engineer-in-Charge. Note : - (i) Sand for filling shall be measured & paid separately as Supply only but labour for spreding leveling shall be included in the unit rate of this item)
Supply only fine sand without silt (Fazilka/Zera or any other approved sources) for filling under interlocking tiles and the interstices etc complete all as specified and as directed by the Engineer-in-Charge.
Material and labour for PCC (1:2:4), type B-1 using 20 mm graded stone aggregate as in coping/packing around chequered tiles/interlocking tiles & similar work etc complete all as specified and as directed by Engineer-in-charge.
Material and labour for precast cement concrete (1:2:4) type B1 using 20mm graded stone aggregate in kerb stone, quoin blocks, copings, kneelers, apex stones, boundary pillars, bed plates, bonders ( for stone walling), etc with plain fair faces, chamfers, weatherings, slightly rounded or chamfered angles and throating etc including form work and laying and setting in cement mortar (1:4) including dismantling of old damaged kerb stone and removing the debris from site all as directed.
Dismantling wall & ceiling boards and PVC wall lining (fibre, pulp, insulation, etc) or insulation boards/slabs/blankets any thickness including cover fillets fixed in any position with nails fixed with screws complete all as specified and as directed by Engineer-in-charge.
Supply and fixing anodised aluminium snap grid frame work of size of grid 605 x605mm for false ceiling including necessary notching and prepared holes, the snap grid shall consist of anodised aluminium main tee of size 36.5mm x 25mm x 1.4mm weighing 0.24 Kg/RM, cross and Intermediate tee of size 23.5mm x 26.4mm x 1.4mm weighing 0.191 Kg/RM. The main and cross tee shall be jointed at junction with steel screws or MS bolts, nuts and washers, the snap grid (main / cross tee sections) shall be supported at ends all along the wall with anodised aluminium angle of size 35mm x25mmx 2mm weighing 0.36 Kg/RM fixed to wall with suitable arrangement and duly suspended with 4mm GI wire hangers (upto 1200 mm length) adjusting level fixed to roof slab by means of ceiling cleats made of GI flat 40x3mm size 60mm long and expansion hold fasteners 12.5mm dia 40mm long including providing 12mm thick gypsum board in grid fixed in false ceiling grid made of aluminium as per above specifications complete all as specified and as directed by Engineer-in-charge.
Material and labour for providing precast cement concrete (1:2:4), type B-0 using 12.5mm graded stone aggregate as in louvers and jallies, 25mm thick (measured solid) including all moulding but excluding frame set in cement mortar 1:4, complete all as specified and as directed by Engineer-in-charge.
Supply and fixed hollow PVC lining consisting 5mm thick plain colour PVC sheet inclusive of solvent cement and fixing at site on PVC frame, complete all as specified and as directed by Engineer-in-charge.
Demolition of cement concrete reinforced of any discription and in any position, like roofs, floors (other than ground floors), beams, staircases, landing, chajjas, fins, facia and similar suspended works, including reinforcement cut as required to facilitate demolition and prepare the surface to casting chajja, slabs, fins, facia etc and including removing rubbish material from site and thrown in low lying empty area (as per direcction of AGE/JE) at any distance upto 500 metres from the site complete all as specified and as directed by Engineer-in-charge.
Material and labour for reinforced cement concrete (1:2:4) (nominal mix) type B-1 using 20mm graded stone aggregate as in chajjas etc., complete all as specified and as directed by Engineer-in-Charge. (NOTE : Reinforcement and form work shall be measured and paid for separately under appropriate item of this schedule.
Material and labour for reinforced cement concrete (1:2:4) (nominal mix) type B-1 using 20mm graded stone aggregate as in fins, facia, louvres, parapets and railings exc. 60cm in height, newels, balustrade and similar suspended works complete all as specified and as directed by Engineer-in-Charge. (NOTE : Reinforcement and form work shall be measured and paid for separately under appropriate item of this schedule.
Material and labour for reinforced cement concrete (1:2:4) (nominal mix) type B-1 using 20mm graded stone aggregate as in slabs supported on walls, beams and columns landing, balconies, canopies, deck slabs and in shelves and the like complete all as specified and as directed by Engineer-in-Charge. (NOTE : Reinforcement and form work shall be measured and paid for separately under appropriate item of this schedule.
Form work to chullah hoods, chajjas, trough and similar items including edges rough finished flat surfaces complete all as specified & directed by Engineer-in- charge.
Form work to fins, louvers, fascia etc. rough finished flat surfaces, complete all as specified and as directed by Engineer-in- charge.
Form work to soffits of suspended slabs such as flat roof slabs, floor slabs, shelf slab, landings and similar work not exceeding 200mm thick (horizontal or sloping) rough finished complete all as specified and as directed by Engineer-in- charge.
Material and labour for mild steel TMT bars 10mm dia and over cut to length bent to shape, required including cranking, bending spirally for hoping for columns, hooking ends and binding with mild steel wire (annealed) not less than 0.9mm dia complete all as specified and as directed by the Engineer-in-Charge. (NOTE : Weight of binding wire shall not be considered for measurement and payment purpose.)
Material and labour for mild steel TMT bars 6 mm to 8mm dia cut to length bent to shape, required including cranking, bending spirally for hoping for columns, hooking ends and binding with mild steel wire (annealed) not less than 0.9mm dia complete all as specified and as directed by the Engineer-in-Charge. (NOTE : Weight of binding wire shall not be considered for measurement and payment purpose.)
Easyways Enterprises
G N CONSTRUCTIONS
M/s Balvinder Singh Engineer and Contractors
M/s Kamal Builders
KARTIK BUILDERS
M/s DHEERAJ JAIN CONSTRUCTION COMPANY
M/s GURFATEH BUILDERS
ABHINANDAN ENTERPRISES
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .