Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.4 LAccepted-AOC LAUDOHA LAUDOHA P S FARIDPUR BARDHAMAN BARDHAMAN WEST BENGAL 713385 | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713385 | L1 | Accepted-AOC L1 | |
| 2 | L2₹3.8 L+₹5,500 (1.48%)Rejected-Finance RANGAMATI LAUDOHA RANGAMATI BARDHAMAN BARDHAMAN 713363 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713363 | L2 | Rejected-Finance L2 | |
| 3 | L3₹3.9 L+₹15,900 (4.28%)Rejected-Finance AT PO AMRAI BARDHAMAN BARDHAMAN 713203 WEST BENGAL | AMRAI | BARDHAMAN | WEST BENGAL | 713203 | L3 | Rejected-Finance L3 |
Tender Value
₹4.4 L
EMD Value
₹5,500
Closing Date
29 Dec 2023, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Area Engineer EnM, Jhanjra Area
OFFICE OF THE GENERAL MANAGER, JHANJRA AREA, PO-LAUDOHA, BO, DIST. - PASCHIM BARDHAMAN, PIN-713385
Shifting of tail end of 78L Belt Conveyor of LHCM-2 section in 4 times from 28D to 12D in four times for development of panel-6 in R-VII seam in LHCM2 section at 3n4 Incline-JPC
2023_ECL_296237_1
ECL/GM/JNR/EnM/A2/23-24/63 dated 14.12.2023
Open Tender
Miscellaneous Works
Item Rate
45 days
JHANJRA UNDERGROUND
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,500
4 Apr 2024
18 Dec 2023
30 Dec 2023
18 Dec 2023
29 Dec 2023
19 Dec 2023
18 Dec 2023 - 25 Dec 2023
Amount
Unlapping & puiling out of 1 piliar i.e 69mtr long 1000mm PVC belting from TSLbelt conveyor(24D to 25D)
Similarly Unlapping & pulling out of another 3 piliar 1000mm PVC belting from 78L belt conveyor(21D to 22D,16D to17D,12D to 13D)
Dismantling and transportation of dismantled belt structure of 1 pillar (i.e each pillar length 34.5 mtr) frorn78L/24D to 78L/25D from site to about pillar
Simiiarly Dismantling and transportation of dirsmantled belt structure from site to about 1 pillar of 78Lbelt conveyor(21D to22D,16D to 17D,12D to 13D)
Dismantling,transportation and pulling out of pull cord and audio cable throughout the belt line along with lock out and communication devices along the belt. and bobin insulator and GI wire for signalling arrangement.
Grouting of tail end frame for 04 times shifting (03 Hds. for one time grouting and tail end to be grouted in every shifting)
Dismantling of 896mtr(448m track line X 2) 30lb rail & 448 nos. wooden sleeper fuorn77L/24D to 77L/11D in R-VII seam at the time of return pullley shortening and keeping these tracklines about 30 mtrs apart in R-VII seam.
Dismanting, transport of tail end unit for installation manually 4 times in 78L belt conveyor(28D to 24D,24D to21D,21D to 16D,16D to 12D)
Cleaning of site, transport and joining of the dismantled structures and laping of belt for 4 pillars(24D to 25D,21D to 22D,16D to17D,12D to 13D)
Transport of tail end unit manually fuom78L/12D to78L/28D and grouting
Transport and joining of trackline for about 13 pillars from 77L / 11 D to 77L / 24D (448mtr trackline)
Total impact of GST for the purpose of CTC
K R ENTERPRISE
N.K. ENTERPRISE
techsummary_306829.pdf
PDF • 0.76 MB
finsummary_306829.pdf
PDF • 0.76 MB
WOA263.pdf
PDF • 2.08 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .