Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹74.0 LAccepted-AOC | ₹74.0 L | L1 | Accepted-AOC l1 |
| 2 | L2₹74.4 LRejected-Finance 1 136 SOUTH STREET MUTHUMOOTHANMOZHI RADHAPURAM TALUK TIRUNELVELI DISTRICT 627 657 | TIRUNELVELI | TAMIL NADU | 627657 | ₹74.4 L | L2 | Rejected-Finance L2rejected |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | ASHWIN PRANESH A L1 | Aadirudhan Construction L2 |
|---|---|---|---|---|---|
| 1.00Name of work:- Strengthening of Thalamuthunagar - Kamaraj Nagar costal road km 0/0-1/600 ( R 162) | |||||
| 2.00 | Clearing Scrub Jungle without alignment for the widening of the formation of the road cutting of trace up to 30mm girth products the cleaning are to be stocked in such a place as ordered by the departmental officer and the ground shall be left in a perfec | 1,560 | Sqm | 6 ₹9,360 | 7 ₹10,920 |
| 3.00 | Picking the existing surface to 50mm to 100mm thick including labour and hire charges for picking tools and plants and all other incidental charges etc complete as per standard specifications. | 2,027.5 | Sqm | 23 ₹46,632.50 | 25.7 ₹52,106.75 |
| 4.00 | Earth work excavation and depositing on bank with an intial of 10m and lift 2m in hard stiff clay, stiff black cotton, hard red earth and earth mixed with small size boulders, hard gravelly soil etc., as per SS 20A including laying and spreading in layer | 270 | cu.m | 140 ₹37,800 | 154.5 ₹41,715 |
| 5.00Providing laying and compacting red gravel in accordance with requirements of the specification materials shall be in one or more layers as necessary including watering, consolidating by the power roller rolling and all labour charges for soiling includin | |||||
| 6.00 | km 0/0-1/000 | 240 | cu.m | 670 ₹1.6 L | 738.78 ₹1.8 L |
| 7.00 | km 1/0-1/400 | 144 | Cum | 680 ₹97,920 | 749.85 ₹1.1 L |
| 8.00 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepare | 227.88 | Cum | 2,569 ₹5.9 L | 2,826.01 ₹6.4 L |
| 9.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 912.38 | Cum | 2,611 ₹23.8 L | 2,894.72 ₹26.4 L |
| 10.00 | Providing and laying PRIME COAT over the WMM surface using 7.00 Kg of Bituminous Emulsion SS I for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special cond | 6,082.5 | Sqm | 85 ₹5.2 L | 95.55 ₹5.8 L |
Tender Value
₹84.0 L
EMD Value
₹85,000
Closing Date
20 Feb 2026, 3:00 pmClosed
Additional Collector(D)/Project Director
Additional Collector(D)/Project Director
PKG01 Strengthening / Upgradation of Thalamuthunagar - Kamaraj Nagar Costal Road km 0/0 - 1/600 in Thoothukudi Block of Thoothukudi District under NABARD RIDF 2026-27
2026_RDTN_657589_9
DRDA A4/165/2026 Dt.12.02.2026
Open Tender
Civil Works - Roads
180 days
DRDA THOOTHUKUDI
As per tender Schedule
4 documents required · 4 mandatory
₹0
₹85,000
DRDA, Thoothukudi
14 May 2026
14 Feb 2026
20 Feb 2026
14 Feb 2026
20 Feb 2026
14 Feb 2026
16 Feb 2026
Clearing Scrub Jungle without alignment for the widening of the formation of the road cutting of trace up to 30mm girth products the cleaning are to be stocked in such a place as ordered by the departmental officer and the ground shall be left in a perfec
Picking the existing surface to 50mm to 100mm thick including labour and hire charges for picking tools and plants and all other incidental charges etc complete as per standard specifications.
Earth work excavation and depositing on bank with an intial of 10m and lift 2m in hard stiff clay, stiff black cotton, hard red earth and earth mixed with small size boulders, hard gravelly soil etc., as per SS 20A including laying and spreading in layer
Providing laying and compacting red gravel in accordance with requirements of the specification materials shall be in one or more layers as necessary including watering, consolidating by the power roller rolling and all labour charges for soiling includin
Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepare
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying PRIME COAT over the WMM surface using 7.00 Kg of Bituminous Emulsion SS I for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special cond
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the
Provision for Hectametre stone
Provision for Kilometre stone
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.42 MB
01Tuty.pdf
Tender Documents • 1.43 MB
BOQ_788883.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid