Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.1 LAdmitted-Fee/PreQual/Technical/Finance | -0.05% | ₹3.1 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹3.1 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹3.1 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹3.2 LAdmitted-Fee/PreQual/Technical/Finance | +1.09% | ₹3.2 L | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹3.1 L
EMD Value
₹3,200
Closing Date
11 Jun 2026, 6:00 pmClosed
Executive Engineering UPSIC KANPUR
Executive Engineering UPSIC KANPUR
Vidhan sabha Sisamau ke Untergat Ward Gwaltoli me Shree Valmiki Malin Basti 12/480 Camety hall ke Samne Chabutre ka Nirman Karya
2026_MSME_1157003_8
466/EE4/26-27
Open Tender
Civil Works
Percentage
90 days
KANPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Executive Engineering UPSIC KANPUR
₹3,200
24 Jun 2026
4 Jun 2026
12 Jun 2026
4 Jun 2026
11 Jun 2026
4 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | e/w in surface excavation not exceding 30 cm in depth but exceding 1.5 m width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m as directed by the engineer-in-charge 2.1.1 all kind of soil. Chapter-4 SI no 1 ref. to DSR/PWD 2.6 (2.6.1) | 3.75 | cum | 205.71 | ₹771.41 |
| 2 | 1:4:8 (1 cement :4 coarse sand : 8 graded brick aggregate 40 mm nominal size | 2 | cum | 5,383.39 | ₹10,766.78 |
| 3 | 1:2:4 (1 Cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 3.87 | cum | 6,783.29 | ₹26,251.33 |
| 4 | Centering and Shuttering including strutting propping etc. and removel of form work for (upto 5th floor) foundation , footings base for column PWD/DSR 4.3.1 | 19.08 | Sqm | 309.91 | ₹5,913.08 |
| 5 | 1:1.5:3 (1 cement :1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size DSR/PWD 4.1.2 | 0.65 | cum | 8,576.87 | ₹5,574.97 |
| 6 | Centering and Shuttering including strutting propping etc. and removel of form work for (upto 5th floor) foundation ,footings base for column PWD/DSR 4.3.1 | 10.07 | Sqm | 581.96 | ₹5,860.34 |
| 7 | Steel reianforcement for r.c.c work including straightering,cutting bending placing in position and binding all complete upto plinth level.PWD/DSR5.22 | 4.43 | Qtl. | 8,463.9 | ₹37,495.08 |
| 8 | Brick work with common burnt clay (Non Modular) Bricks of class-150 in foundation and plinth in: cement mortar 1:4 DSR 6.1.1 | 1.61 | cum | 5,636.48 | ₹9,074.73 |
| 9 | Brick work with common burnt clay (Non Modular) Bricks of class-150 in Superstructure above plinth level up to floor v level in all shape and sizes: cement mortar 1:4 (Coarse sand) DSR 6.4.1 | 3.55 | cum | 7,384.66 | ₹26,215.54 |
| 10 | 12 mm plaster of mix 1:4 (coarse sand) DSR/PWD 13.4.1 | 13.04 | sqm | 282.41 | ₹3,682.63 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
TermsandConditionTenderCivilWorks.pdf
Tender Documents • 0.05 MB
BOQ_2168039.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].