| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.2 LAccepted-AOC CENTRAL COALFIELDS LIMITED OFFICE OF THE PROJECT OFFICER E M DEPARTMENT SAUNDA D BARKA SAYAL AREA | BOKARO | JHARKHAND | 825102 | L1 | Accepted-AOC The L1 bidder is techno-commercially eligible and the rate quoted is reasonable and justified, which has been accepted by the Competent Authority, NK Area. | |
| 2 | L2₹9.9 L+₹35,080 (3.69%)Rejected-Finance NEAR RELIANCE PETROL PUMP RAMGARH CANTT 829122 DIST RAMGARH JHARKHAND | RAMGARH CANTT | RAMGARH | JHARKHAND | 829122 | L2 | Rejected-Finance L2 |
Tender Value
₹10.6 L
EMD Value
₹13,300
Closing Date
23 Aug 2024, 5:00 pmClosed
SO EnM NK
GM OFFICE, NK AREA
Partial rep. and rewinding of Transformer 3 MVA, 11kV/6.6-3.3kV, Make Andrew Yule, Sl. No. 522(P), Vector group Dyn11, Cooling Type ONAN installed at Q.No. 01 Sub-stn and testing of different parameters from NABL accredited lab under Purnadih OCP.
2024_CCL_315070_1
GM (NK)/EnM/e-NIT/2024-25/ 139
Open Tender
Electrical and Maintenance Works
Item Rate
30 days
Purnadih OCP
As per NIT
2 documents required · 2 mandatory
₹13,300
7 Oct 2024
13 Aug 2024
24 Aug 2024
14 Aug 2024
23 Aug 2024
14 Aug 2024
14 Aug 2024 - 17 Aug 2024
Amount
Cost of DPC Copper wire/strip of 8 SWG for secondary winding only. (Total weight of primary + Secondary = 1380 kg, Primary = 750 kg & Secondary = 630 kg for dual ratio) inclusive of all leads.
Cost of insulating material of total weight i.e. primary + Secondary = 1380 kg.
Cost of Labour charge including transporting to and fro.
Cost of replacement of all gasket of conservator, radiator, top cover and inspection chamber at side.
Cost of Silica gel breather body aluminium dia cast container poly carbonate powder coated with flange mounting with silica gel blue.
Cost for on line filteration of transformer oil at site
Cost of following test from NABL accrediated laboratory for insulating oil as per IS 1866-2017
Dielectric strength
Dissolved gas analysis
Acidity & Flash point
Specific Resistance
Complete testing of transformer including insulation resistance and polarizatio, H1--POT Test, Polarity test by NABL Accrediated laboaratory at site.
Less scrap value of Item No. 01
Total impact of GST for the purpose of CTC
Rajneesh Electricals
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .