| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹52.7 LAdmitted-Finance | -39.31% | ₹52.7 L | L1 | Admitted-Finance |
| 2 | L2₹62.0 LAdmitted-Finance | -28.50% | ₹62.0 L | L2 | Admitted-Finance |
| 3 | L3₹93.5 LAdmitted-Finance | +7.77% | ₹93.5 L | L3 | Admitted-Finance |
Tender Value
₹86.8 L
EMD Value
₹1.7 L
Closing Date
24 Jun 2026, 6:00 pmClosed
SE WR and Canal Construction Circle, Banswara
Superintending Engineer, Water Resources and Canal Construction Circle, Banswara
Construction of Rawla Fala Anicut Village Bhandla, GP Bhandla Tehsil Dhariyawad District Pratapgarh
2026_WRDAS_567507_1
SE E-NIT 01 of 2026-27
Open Tender
Civil Works
270 days
Bhandla Tehsil Dhariyawad
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
EE, WR Jakham Project Division
₹1.7 L
Yes
25 Jun 2026
12 Jun 2026
25 Jun 2026
12 Jun 2026
24 Jun 2026
12 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Side shuttering including propping etc. complete (to achieve finish F 2 for :Retaining wall, counterfort, abutment, wing walls up stream or down- stream slope facings of dams and open faces of construction joints etc. | 654 | Sqm | 220 | ₹1,43,880 |
| 2 | Side shuttering including propping etc. complete (to achieve finish F 2 for :Curved edges or sides of special shapes like baffle or chute blocks, end sills, Basin Block, projected copings, extended sills, curved surfaces arches, circular ducts etc. | 100 | Sqm | 340 | ₹34,000 |
| 3 | Extra labour charges for RCC due to obstruction in laying and placing the reinforced cement concrete due to reinforcement. In foundation rafts, beams, columns bases stilling basins, buckets, aprons etc. (non suspended horizontally laid mass concrete) | 522 | Cum | 140 | ₹73,080 |
| 4 | Extra labour charges for RCC due to obstruction in laying and placing the reinforced cement concrete due to reinforcement. Aqueduct troughs, siphon conduits, box type sluice barrels, domes spiral shafts or stair cases ( thin walled section) and ogee crests, baffle or chute blocks, end sills, buckets, projects coping, extended sill etc. | 36 | Cum | 400 | ₹14,400 |
| 5 | Supplying of M.S. reionforcement including labour charges for bending binding and placing in position all reinforcement as per drawing including cost of binding wire and all leads and lifts using. Tor or ribbed bars (IS :1786-1985) | 15,802 | Kg. | 89 | ₹14,06,378 |
| 6 | Drilling holes of 35 mm diameter for anchor rods.Upto 1.50 m. depth | 103.5 | meter | 129 | ₹13,351.5 |
| 7 | Labour charges for Fixing of anchor bars in neat cement grout including cost of cement and curing etc. complete | 69 | Each | 245 | ₹16,905 |
| 8 | Supply of Tor steel anchor bars of required diameter, length and shape at site of work complete. | 797 | Kg | 72 | ₹57,384 |
| 9 | Preparation of foundation of structure including removal of all loose stones, silt and final washing. By manual labour | 611 | Sqm | 23 | ₹14,053 |
| 10 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect Soft/Loose soil | 468 | Cum | 92 | ₹43,056 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
Tendernotice.pdf
Tender Documents • 0.43 MB
FinancialBid.pdf
Additional Documents • 1.27 MB
BOQ_1009431.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid