Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹50.6 LAccepted-AOC HOUSE NO 47 SUPRABHA PATH SIJUBARI P O HATIGAON P S HATIGAON DIST KAMRUP M GUWAHATI 38 | GUWAHATI | KAMRUP M | ASSAM | 781038 | L1 | Accepted-AOC Contract Awarded | |
| 2 | L1₹50.6 LRejected-AOC | L1 | Rejected-AOC Contract not Awarded | |
| 3 | L1₹50.6 LRejected-AOC | L1 | Rejected-AOC Contract not Awarded | |
| 4 | L1₹50.6 LRejected-AOC BYLINE NO 9 HOUSE NO 972 SARUMATARIA HENGRABARI GUWAHATI 36 | GUWAHATI | KAMRUP | ASSAM | 781036 | L1 | Rejected-AOC Contract not Awarded | |
| 5 | L1₹50.6 LRejected-AOC MILIJULI PATH BELTOLA HATIGAON GUWAHATI KAMRUP METRO ASSAM 781028 | GUWAHATI | KAMRUP METRO | ASSAM | 781028 | L1 | Rejected-AOC Contract not Awarded |
Tender Value
₹51.6 L
EMD Value
₹1.0 L
Closing Date
21 Oct 2020, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Director, Soil Conservation Deptt.
Directorate of Soil Conservation Deptt., Ghy-05, Assam
GELABARI WATER HARVESTING CUM WATER DISTRIBUTION PROJECT UNDER RIDF XXV DURING 2019-20
2020_SCD_18915_2
E-TEN-1/2020-21/2450 DT.12-10-2020
Open Tender
Civil Works
Works
1095 days
Guwahati
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
Director, Soil Conservation Deptt.
₹1.0 L
Yes
5 Dec 2020
12 Oct 2020
22 Oct 2020
12 Oct 2020
21 Oct 2020
14 Oct 2020
999 days
Amount
Part - A : RCC Check Dam at Jogipara Village
Cost for construction of temporary camp hut to provide acccomudation to the staffs, masons and labours as well as storage of materials at the project site.
Cost for installation of tube well including fitting & fixing and supplying all necessary materials.
Earthwork in excavation for construction of diversion channel to divert the flow of water from the proposed site of RCC Check Dam during the construction.
Earth work in excavation of foundation of structures as per drawing & technical specifications, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, back filling the excavated earth etc. complete as per directed.
Plain Cement Concrete (1:3:6) in foundation mixed with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Reinforced Cement Concrete work in sub- sturucture complete as per drawing & technical specifications including steel shuttering formwork.
Supplying fitting and placing TMT IS:1786 (Fe-500) bar reinforcement in sub-sturcture complete as per drawing and technical specifications.
Providing filtre media with granular materials/ stone crushed aggregates satisfying the requirements laid down behind the head wall, wing wall and side wall as per drawing and technicalspecifications.
Plastering with cement mortar (1:3) on all walls in sub-structures as per technical specifications.
Providing and laying boulder apron on river bed for protection against scour with stone boulders weighing not less than 40 kg. each complete in front of head wall and behind the toe wall as per drawing and technical specifications. Boulders laid down without wire crates.
Earthwork in filling guide bund by head load upto lead of 60 m with approved quality all leads and lifts, dressing, cambering, ramming, including payment of land compensation for obtaining earth from private land or govt. land as required (12.5% deduction being made on the quantity thus arrived for shrinkage allowance) etc. complete per drawing and technical specifications.
Earthwork in filling for closing the diversion channel after completion of work.
Earth work in excavation of structure for foundation of boulder apron/revetment as per drawing and technical specifications.
Providing and laying boulder apron/revetment on river bed for protection against scour with stone boulders weighing not less than 40 kg. each complete in front of head wall and toe wall as per drawing and technical specifications. Boulders laid down without wire crates.
Providing and laying boulder apron/revetment on river bed for protection against scour with stone boulders weighing not less than 40 kg. each complete in front of head wall and toe wall as per drawing and technical specifications. Boulders laid down with wire crates.
Earthwork by head load in filling periphery bund in layers not exceeding 20 cm thick including breaking clods, dressing & sectioning, cambering & ramming, within a lead upto 30 m and lift upto 1.5 m including payment of land compensation for obtaining earth from private land or govt. land as required (measurement will be on the basis of profile or section mesurement, 12.5 % deduction being made on the quantity thus arrived for shrinkage allowance.) etc. as per drawing and technical specifications.
Cost for RCC singboard including engraved letter, colouring and fitting & fixing and supplying all necessary materials at the project site.
Part - B : RCC Check Dam at Jogipara Village
Cost for construction of temporary camp hut to provide acccomudation to the staffs, masons and labours as well as storage of materials at the project site.
Cost for installation of tube well including fitting & fixing and supplying all necessary materials.
Earthwork in excavation for construction of diversion channel to divert the flow of water from the proposed site of RCC Check Dam during the construction.
Construction of Approach Road for carriage of materials to the work site.
Earth work in excavation of foundation of structures as per drawing & technical specifications, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, back filling the excavated earth etc. complete as per directed.
Plain Cement Concrete (1:3:6) in foundation mixed with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Reinforced Cement Concrete work in sub- sturucture complete as per drawing & technical specifications including steel shuttering formwork.
Supplying fitting and placing TMT IS:1786 (Fe-500) bar reinforcement in sub-sturcture complete as per drawing and technical specifications.
Providing filtre media with granular materials/ stone crushed aggregates satisfying the requirements laid down behind the head wall, wing wall and side wall as per drawing and technicalspecifications.
Plastering with cement mortar (1:3) on all walls in sub-structures as per technical specifications.
Providing and laying boulder apron on river bed for protection against scour with stone boulders weighing not less than 40 kg. each complete in front of head wall and behind the toe wall as per drawing and technical specifications. Boulders laid down without wire crates.
Earthwork in filling guide bund by head load upto lead of 60 m with approved quality all leads and lifts, dressing, cambering, ramming, including payment of land compensation for obtaining earth from private land or govt. land as required (12.5% deduction being made on the quantity thus arrived for shrinkage allowance) etc. complete per drawing and technical specifications.
Earthwork in filling for closing the diversion channel after completion of work.
Earth work in excavation of structure for foundation of boulder apron/revetment as per drawing and technical specifications.
Providing and laying boulder apron/revetment on river bed for protection against scour with stone boulders weighing not less than 40 kg. each complete in front of head wall and toe wall as per drawing and technical specifications. Boulders laid down without wire crates.
Providing and laying boulder apron/revetment on river bed for protection against scour with stone boulders weighing not less than 40 kg. each complete in front of head wall and toe wall as per drawing and technical specifications. Boulders laid down with wire crates.
Earthwork by head load in filling periphery bund in layers not exceeding 20 cm thick including breaking clods, dressing & sectioning, cambering & ramming, within a lead upto 30 m and lift upto 1.5 m including payment of land compensation for obtaining earth from private land or govt. land as required (measurement will be on the basis of profile or section mesurement, 12.5 % deduction being made on the quantity thus arrived for shrinkage allowance.) etc. as per drawing and technical specifications.
Providing RCC Pipe NP4 heavy duty non pressure pipe 300 mm dia inside the earthen bund including fitting & fixing etc. complete as directed,.
Cost for RCC singboard including engraved letter, colouring and fitting & fixing and supplying all necessary materials at the project site.
Part - C : RCC Check Dam at Jogipara Village
Cost for construction of temporary camp hut to provide acccomudation to the staffs, masons and labours as well as storage of materials at the project site.
Cost for installation of tube well including fitting & fixing and supplying all necessary materials.
Earthwork in excavation for construction of diversion channel to divert the flow of water from the proposed site of RCC Check Dam during the construction.
Construction of Approach Road for carriage of materials to the work site.
Earth work in excavation of foundation of structures as per drawing & technical specifications, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, back filling the excavated earth etc. complete as per directed.
Plain Cement Concrete (1:3:6) in foundation mixed with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Reinforced Cement Concrete work in sub- sturucture complete as per drawing & technical specifications including steel shuttering formwork.
Supplying fitting and placing TMT IS:1786 (Fe-500) bar reinforcement in sub-sturcture complete as per drawing and technical specifications.
Providing filtre media with granular materials/ stone crushed aggregates satisfying the requirements laid down behind the head wall, wing wall and side wall as per drawing and technicalspecifications.
Plastering with cement mortar (1:3) on all walls in sub-structures as per technical specifications.
Providing and laying boulder apron on river bed for protection against scour with stone boulders weighing not less than 40 kg. each complete in front of head wall and behind the toe wall as per drawing and technical specifications. Boulders laid down without wire crates.
Earthwork in filling guide bund by head load upto lead of 60 m with approved quality all leads and lifts, dressing, cambering, ramming, including payment of land compensation for obtaining earth from private land or govt. land as required (12.5% deduction being made on the quantity thus arrived for shrinkage allowance) etc. complete per drawing and technical specifications.
Earthwork in filling for closing the diversion channel after completion of work.
Earth work in excavation of structure for foundation of boulder apron/revetment as per drawing and technical specifications.
Providing and laying boulder apron/revetment on river bed for protection against scour with stone boulders weighing not less than 40 kg. each complete in front of head wall and toe wall as per drawing and technical specifications. Boulders laid down without wire crates.
Providing and laying boulder apron/revetment on river bed for protection against scour with stone boulders weighing not less than 40 kg. each complete in front of head wall and toe wall as per drawing and technical specifications. Boulders laid down with wire crates.
Earthwork by head load in filling periphery bund in layers not exceeding 20 cm thick including breaking clods, dressing & sectioning, cambering & ramming, within a lead upto 30 m and lift upto 1.5 m including payment of land compensation for obtaining earth from private land or govt. land as required (measurement will be on the basis of profile or section mesurement, 12.5 % deduction being made on the quantity thus arrived for shrinkage allowance.) etc. as per drawing and technical specifications.
Providing RCC Pipe NP4 heavy duty non pressure pipe 300 mm dia inside the earthen bund including fitting & fixing etc. complete as directed,.
Cost for RCC singboard including engraved letter, colouring and fitting & fixing and supplying all necessary materials at the project site.
Manikanchan Traders
ABDUL HASIM
RANJAN DAS
A.B. Construction
stage.html
html • 0.05 MB
techsummary_29272.pdf
PDF • 0.42 MB
BOQ Comparative Chart
xlsx • 0.01 MB
finsummary_29272.pdf
PDF • 0.14 MB
gelabari.pdf
PDF • 0.14 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .