Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹65.2 L
EMD Value
₹5.3 L
Closing Date
27 Nov 2026, 5:00 pmDue today
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
EE MI LALITPUR
OFFICE OF EE MI LALITPUR
CONSTRUCTION OF SIRSI RAPTA CHECKDAM AT VILL- SIRSI BLOCK JAKHORA LALITPUR
2026_UPMID_1209710_1
09/EE/2026-27
Open Tender
Civil Works
Percentage
120 days
LALITPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
EE MID
₹5.3 L
Yes
18 Nov 2026
18 Nov 2026
28 Nov 2026
18 Nov 2026
27 Nov 2026
18 Nov 2026
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1EARTH WORK | |||||
| 1.01 | EARTHWORK EXCAVATION IN MAR & KAWER AND KANKAR MIXED HARD SOIL INCLUDING LEAD 30 M AND LIFT 1.5 M 40% OF EARTH WORK | 388.86 | CUM | 95.2 | ₹37,019.47 |
| 1.02 | AS ABOVE EARTHWORK BUT LIFT 1.5 M TO BED LEVEL IS 60% OF EARTH WORK | 583.29 | CUM | 107.7 | ₹62,820.33 |
| 1.03 | EARTH WORK IN EXCAVATION IN MAR, KABAR RANKAR AND KANKAR MIXED SATURATED SOIL WITH 5 LIFTS AND 30 MTR LEAD | 402.5 | CUM | 115.6 | ₹46,529 |
| 1.04 | REMOVAL OF SLUSH FROM BED OF NALA BEFORE EXCAVATION OF SATURATED SOIL | 110.3 | CUM | 258.3 | ₹28,490.49 |
| 1.05 | C.C. IN 1:3:6 CEMENT, SAND 20-40 MM GRANITE STONE GRITT INCLUDING THE COST OF MATERIALS LABOURS AND ETC, REQUIRED FOR PROPER COMLETION OF WORK | 459.6 | CUM | 4,746.3 | ₹21,81,399.48 |
| 1.06 | RCR STONE MASONARY (KHANDA STONE) WORK IN 1:4 WITH CEMENT SAND MORTAR IINCLUDING THE COST OF MATERIALS LABOURS AND ETC, REQUIRED FOR PROPER COMLETION OF WORK | 235.63 | CUM | 5,547.1 | ₹13,07,063.17 |
| 1.07 | R R STONE MASONARY WORK IN 1:4 WITH CEMENT SAND MORTAR IINCLUDING THE COST OF MATERIALS LABOURS AND ETC, REQUIRED FOR PROPER COMLETION OF WORK | 287.74 | CUM | 4,291.6 | ₹12,34,864.98 |
| 1.08 | C.C. IN 1:2:4 CEMENT, SAND 10-20MM GRANITE STONE GRITT IINCLUDING THE COST OF MATERIALS LABOURS AND ETC, REQUIRED FOR PROPER COMLETION OF WORK | 132.62 | CUM | 5,436.9 | ₹7,21,041.68 |
| 1.09 | RAISED STRUCK POINTING IN 1:2 CEMENT SAND MORTAR IINCLUDING THE COST OF MATERIALS LABOURS AND ETC, REQUIRED FOR PROPER COMLETION OF WORK | 169.94 | SQM | 153.2 | ₹26,034.81 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.05 MB
BOQ_2297012.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .