Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.2 LAccepted-AOC | ₹7.2 L | L1 | Accepted-AOC L1 |
| 2 | L2₹8.3 L+₹1.1 L (14.7%)Rejected-Finance | ₹8.3 L+₹1.1 L (14.7%) | L2 | Rejected-Finance L2 |
| 3 | L3₹8.4 L+₹1.2 L (16.5%)Rejected-Finance | ₹8.4 L+₹1.2 L (16.5%) | L3 | Rejected-Finance L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical all requried not complete |
Tender Value
₹8.5 L
EMD Value
₹25,500
Closing Date
24 Jul 2026, 3:00 pmClosed
CE
Ghaziabad Nagar Nigam
City zone ke antargat kanwar ke dirastigat dudheswarnath madir se police choki tak baricating ka karye
2026_DOLBU_1170833_1
128/Nirman/2026-27 Date 17-07-2026
Open Tender
Civil Works
Percentage
Ghaziabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,416
Yes
₹25,500
Yes
7 Aug 2026
18 Jul 2026
24 Jul 2026
18 Jul 2026
24 Jul 2026
18 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil (Loam, clay or sand) including lift upto 1.50 M. and lead upto 30 M. and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplusearth as directed by the Engineer-in-charge upto a distance of 30 M. from the foundation trenches. (Where machine can not reach/move).PWD SOR 2022 4.1.1 | 8.61 | M3 | 100 | ₹860.63 |
| - | Providing and fixing M.S. pipe 50 mm ms pipe 1.80 long in wich .45 under road level and 1.35 mtr above road lever. @ 2.00 mtr orizentel distence | 775 | No. | 198 | ₹1,53,450 |
| - | Providing and fixing errection of barricades by ballies in three rows etc all comp. | 1,550 | Rmt | 50 | ₹77,500 |
| 4 | Wheeled excavator cum Loader Including P.O.L. and Driver | 120 | P/h | 950 | ₹1,14,000 |
| - | Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre leadas per direction of Engineer-in-Charge. | 72 | M2 | 100.45 | ₹7,232.4 |
| - | S/S of 22.4 to 53mm gauge stone ballast with stacking for measurment etc. all complete as per the direction of Engineer in charge (AS PER PWD SOR 2020 RMR) | 9.83 | M3 | 2,151.2 | ₹21,141.99 |
| - | Supply of screening material with stacking for measurment 11 etc all complete as per the direction of engineer in-charge AS PER PWD SOR 2020 RMR | 1.77 | M3 | 2,050.2 | ₹3,626.89 |
| - | Consolidation of stone aggregates of 45-63 mm/22.4-53mm size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2/3 as per Technical Specification Clause 405. AS PER PWD SOR 2022 20.2.1 | 9.83 | M3 | 690 | ₹6,781.32 |
| - | Supply & laying 80 mm thick Precase cement concrete i-shape interlocking paver block (Grey color) with top layer of having plan dimension 200X(160+120mm) of O.P cement smoothing gloss finish, skid resistant manufacturered from rubber moulds through vibro-compression mechanism. the compressive strength of concrete paver block shall not be less than 30 mpa (M-30) and weight 5kg .per no. confirming to 15:15658-2006 including cost of material, labour,t&p etc. required for proper completion of the work as directed by Engineer -in-charge | 72 | M2 | 930 | ₹66,960 |
| - | Laying of Interlocking Tiles of 60 to 80 mm thick including levelling and dressing of surface up to required level and slopes over 30 mm thick bed and filling joints with fine sand including cost of fine sand, labour, T&P etc complete But excluding cost of Tile as directed by Engineer in charge.AS PER PWD SOR 2022 20.13 NEW ITEM | 72 | M2 | 110 | ₹7,920 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.04 MB
BOQ_2197191.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .