Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.2 CrAccepted-AOC MANSA | ₹1.2 Cr | 1 | Accepted-AOC lowest |
| 2 | 2₹1.4 CrRejected-Finance B 22 152 STREET NO 1 14 BABA FARID NAGAR BATHINDA 151001 PB | BATHINDA | PUNJAB | 151001 | ₹1.4 Cr | 2 | Rejected-Finance highest |
| Sl No | Description | Qty | Unit | HARPREET SINGH CONTRACTOR L2 | ROHIT GARG CONTRACTOR L1 |
|---|---|---|---|---|---|
| 1.00 | Earthwork Undressed involving an avg. horizontal throw upto 2 mtr. and an avg. Vertical Lift upto 0.5 mtr. including Breaking of Clods Item No.6.2(a) of CSR 2020 | 1 | Cum | 95 ₹95 | 93 ₹93 |
| 2.00 | Earth work undressed with combined lead upto 15mtr. including breaking of clods Item No.6.2(b) of CSR 2020 | 1 | Cum | 130 ₹130 | 128 ₹128 |
| 3.00 | Dressing of new earth work Item No.6.3(i) of CSR 2020 | 1 | Sqm | 8 ₹8 | 6 ₹6 |
| 4.00 | Earthwork Filling in 0.152 mtr. layers in foundation, including ramming, watering and consolidation under bed. | 1 | Cum | 175 ₹175 | 170 ₹170 |
| 5.00 | Re-handling of earthwork recently executed item No.6.2(a) of CSR 2020 note No.ii | 1 | Cum | 90 ₹90 | 85 ₹85 |
| 6.00 | Dag belling single kassi stroke minimum 7.5 cm depth item No.6.18(a) | 1 | KM | 1,200 ₹1,200 | 1,000 ₹1,000 |
| 7.00 | Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of Bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres. | 1 | Cum | 220 ₹220 | 210 ₹210 |
| 8.00 | Dressing of bed and preparation of sub-grade for lining.Item No.19.1 of CSR 2020 | 1 | Sqm | 25 ₹25 | 20 ₹20 |
| 9.00 | First class burnt brick laid in cement sand mortar 1:6 for bed and side wall [Item No 11.3(i)]. | 1 | Cum | 7,500 ₹7,500 | 7,200 ₹7,200 |
| 10.00 | 10 mm thick cement plaster with cement sand mortar 1:4 on side walls. | 1 | Sqm | 200 ₹200 | 195 ₹195 |
Tender Value
₹1.3 Cr
EMD Value
₹2.5 L
Closing Date
7 Apr 2026, 9:00 amClosed
DivisionalEngineer SangurBarnalaPWRMDC Divi
DivisionalEngineer SangurBarnalaPWRMDC Division Barnala
Estimate for ReLining Lining of WC by Laying BM of O L RD 28610TF Slice1 of Dhilwan Mr Village Dhilwan Nabha Patiala Distt.Barnala
2026_WR_160592_12
NIT04/2026
Open Tender
Civil Works
180 days
Barnala
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,360
₹2.5 L
DivisionalEngineer SangurBarnalaPWRMDC Divi
30 Apr 2026
1 Apr 2026
7 Apr 2026
1 Apr 2026
7 Apr 2026
1 Apr 2026
2 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earthwork Undressed involving an avg. horizontal throw upto 2 mtr. and an avg. Vertical Lift upto 0.5 mtr. including Breaking of Clods Item No.6.2(a) of CSR 2020 | - | Cum | - | - | Item1 |
| 2 | Earth work undressed with combined lead upto 15mtr. including breaking of clods Item No.6.2(b) of CSR 2020 | - | Cum | - | - | Item2 |
| 3 | Dressing of new earth work Item No.6.3(i) of CSR 2020 | - | Sqm | - | - | Item3 |
| 4 | Earthwork Filling in 0.152 mtr. layers in foundation, including ramming, watering and consolidation under bed. | - | Cum | - | - | Item4 |
| 5 | Re-handling of earthwork recently executed item No.6.2(a) of CSR 2020 note No.ii | - | Cum | - | - | Item5 |
| 6 | Dag belling single kassi stroke minimum 7.5 cm depth item No.6.18(a) | - | KM | - | - | Item6 |
| 7 | Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of Bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres. | - | Cum | - | - | Item7 |
| 8 | Dressing of bed and preparation of sub-grade for lining.Item No.19.1 of CSR 2020 | - | Sqm | - | - | Item8 |
| 9 | First class burnt brick laid in cement sand mortar 1:6 for bed and side wall [Item No 11.3(i)]. | - | Cum | - | - | Item9 |
| 10 | 10 mm thick cement plaster with cement sand mortar 1:4 on side walls. | - | Sqm | - | - | Item10 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.17 MB
Tendernotice_2.pdf
PDF • 0.05 MB
PKG9RD28610TFSlice1.xls
Tender Documents • 0.04 MB
BOQ_334775.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid