Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹66.2 Laccepted-aoc | ₹66.2 L | accepted-aoc |
Tender Value
₹63.2 L
EMD Value
₹1.3 L
Closing Date
31 Dec 2025, 11:00 pmClosed
Visvesvaraya Jala Nigam Limited
Sreepeeta S Kumbhavath
SHIFTING EXISTING 11 KV AND LT ELECTRICAL LINE & POLE FROM CH 249.150 KM TO 255.00 KM (RAYAPURA TO THIMMASANDRA AND lAKKAIAHNAPALYA TO kOLALA LIMITS) COMING UNDER PACKAGE-25 OF YETTINAHOLE PROJECT
VJNL/2025-26/EL/WORK_INDENT435
VJNL/2025-26/EL/WORK_INDENT435
Open
Electrical
Two Tender Document System(Two Cover)
VJNL Division YP NO 4 Office Madhugiri
8 documents required · 8 mandatory
Executed in any one year the following minimum quantities of work (Cement Concrete - xxxx cum, Earthwork - xxxx cum, etc) (80% of peak rate of construction)
Owning the following key and critical equipment for this work (xxxx, xxxx, xxxx)
Total value of civl engineering works executed and payments received in the last five years (year-wise)
Banker Details for reference
Construction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awarded
Satisfactorily completed (at least 90% of contract value) as prime contractor, at least one similar work such as Shifting/Construction /Modification of 11 KV or Above Transmission Electrical line of value not less than Rs. 31.60 lakhs in last financial years i.e from FY 2020-21 to 2024-25. An additional weightage of 10% for each year will be added to the cost of work done to bring it to the present price level. The work done certificate should be obtained from competent authority not below the rank of Executive Engineer or equivalent in case of Government under taking
Valid Class-1 electrical contractors license issued by Govt of Karnataka.
List of existing commitments and ongoing works
The Intending bidder should have executed the following minimum quantities in any one year (for a continuous period of 12 months) in the last five years i,e from (FY 2020-21 to 2024-25) 1.Shifting/New installation of PSCC Pole 9 Mtr Long with cross arms : 48 Nos, 2.Shifting/New installation of Rabbit ACSR Conductor:5.2km & 3.Shifting/New installation of Transforms:2.0Nos
Valid Employees Provident fund Registration Certificate with latest paid challan
List of works for which tenders already submitted
Tenderers who meet the above specified minimum eligibility and Prequalification criteria, will only be qualified if their available tender capacity is more than the total tender value. The available bid Capacity is calculated as under.Assessed available tender Capacity:(AXNX2.5 - B) where A:Maximum value of works Executed in any one year during the last five years (updated to FY 2025-26 price level) N-0.05, Number of years prescribed for completion of the works for which bids are invited.B :Value at FY 2025-26 price level of existing commitments and on-going works to be completed during the next 06 Months.(Period of completion of the works for which Tenders are invited)
Achieved in at least two financial years an average annual financial turnover (in all classes of electrical engineering construction works only) of Rs. 63.20.00 Lakhs (in all classes of Electrical engineering construction works only) NOTE: - Audited balance sheets/Profit and loss statement and Turnover certificate duly certified by Chartered accountant with their unique document identification number (UDIN) generated by ICAI portal should be uploaded. The certificate without UDIN will not be considered Financial turnover of previous years will be given a weightage of 10% per year based on the rupee value to bring them to Present price levels
The tenderer/firm/company shall furnish details of liquid assets and or availability of credit facilities of Rs.18.96 Lakhs for the work mentioned above for meeting the required funds in the form of credit lines / line of credit / certificate from Scheduled /nationalized Bank in the prescribed format. The line of Credit shall be in the form of Prescribed under section 10.
Income Tax Returns of Last 5 Financial years (from 2020-21 to 2024-25)
Valid GSTIN registration certificate with PAN
₹1,590
₹1.3 L
31 Dec 2025
17 Dec 2025
2 Jan 2026
23 Dec 2025
SHIFTING EXISTING 11 KV AND LT ELECTRICAL LINE & POLE FROM CH 249.150 KM TO 255.00 KM (RAYAPURA TO THIMMASANDRA AND lAKKAIAHNAPALYA TO kOLALA LIMITS) COMING UNDER PACKAGE-25 OF YETTINAHOLE PROJECT
Spun pole 11 Mtr Long
PSCC Pole 9 Mtr Long-200 Kg WL
11 kV Horizontal Cross Arm with clamps, HTST Supports, Bolt, nuts and washer for PSCC Pole 9M long
Special 3 Pin cross arms complete GI for using for spun pole
11 Kv 5 KN Polymeric pin insulators (24 mum dis FRP Rod)
11 KV 45 KN Disc Insulators for Dead End
4 pin Cross arm with clamp
1.1 kv pin insulator with Gl Pin
No 8. Kv Strain insulator
Guy sets Complete with No 15 Strain Insulator & Concreting Materials
Spiral Earth Electrodes
Guy concreting With boulders, Mud, and Sand
Rabbit ACSR Conductor
11 KV 70 Sq mm AAAC (AL 7), Covered Conductor
Supply & Providing Insulated Piercing Connector
Supply & Providing Alignment Tie
Supply & Providing Wedge Connectors
New of 63 KVA DTC complete set with Transformer (Using 4 Star DT) a per cost data sheet 625 SR 23-24
Shifting of 25 KVA DTC with New Poles & 9 Structure set, earthing etc (Using 4 Star DT) a per cost data sheet 24 SR 23-24
Earthing materials pipe type for grounding
1.1 kV, 3 Phase Aerial Bunched Cable of size 3X95+1X70+1X16 Sqmm Street Light
Piercing connector suitable for 16 Sqmm-95 Sqmm AB Cable-Service Connections
Suspension Clamp Assembly 16 to 70 mm(Excluding pole clamp and Eye Hook )
Dead End Clamp or Anchor Clamp Assembly 25 to 95 Sqmm(excluding pole clamps and Eye hook)
Pole clamp for HTor LT AB cable
Universal Hook, Bolts and nuts
End cap for 50 or 70 Sqmm
Eye Hook (Flat type) for fixing Clamps
SHIFTING EXISTING 11 KV AND LT ELECTRICAL LINE & POLE FROM CH 249.150 KM TO 255.00 KM (RAYAPURA TO THIMMASANDRA AND lAKKAIAHNAPALYA TO kOLALA LIMITS) COMING UNDER PACKAGE-25 OF YETTINAHOLE PROJECT
Spun pole 11 Mtr Long
PSCC Pole 9 Mtr Long-200 Kg WL
11 kV Horizontal Cross Arm with clamps, HTST Supports, Bolt, nuts and washer for PSCC Pole 9M long
Special 3 Pin cross arms complete GI for using for spun pole
4 pin Cross arm with clamp
Guy sets Complete with No 15 Strain Insulator & Concreting Materials
Spiral Earth Electrodes
Rabbit ACSR Conductor
11 KV 70 Sq mm AAAC (AL 7), Covered Conductor
Supply & Providing Insulated Piercing Connector
Supply & Providing Alignment Tie
Supply & Providing Wedge Connectors
New of 63 KVA DTC complete set with Transformer (Using 4 Star DT) a per cost data sheet 625 SR 23-24
Shifting of 25 KVA DTC with New Poles & 9 Structure set, earthing etc (Using 4 Star DT) a per cost data sheet 24 SR 23-24
Digging of 2.5 Mtr pit for erection of Spun pole on hard rock
Concreting of spun poles and miscellaneous
Earthing materials pipe type for grounding
1.1 kV, 3 Phase Aerial Bunched Cable of size 3x95+1x70+1x16 Sqmm Street Light
Piercing connector suitable for 16 Sqmm-95 Sqmm AB Cable-Service Connections
Suspension Clamp Assembly 16 to 70 mm(Excluding pole clamp and Eye Hook)
Dead End Clamp or Anchor Clamp Assembly 25 to 95 Sqmm(excluding pole clamps and Eye hook)
Pole clamp for HTor LT AB cable
Universal Hook Bolts and nuts
End cap for 50 or 70 Sqmm
R R Rabbit Conductor at 190 percentage
R R Horizontal Cross Arm 190 percentage
R R 11 KV pin insulators
R R Disc Insulators material
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
NIT 09 Pole Shiting.pdf
Instructions to Tenderers • 11.60 MB
DTS OF Indent No 435.doc
Tender Document • 8.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .