| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.0 CrAdmitted-Finance | ₹10.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹10.4 Cr+₹35.9 L (3.59%)Admitted-Finance R K PATH ITACHALI CITY TOWN NAGAON P O NAGAON P S SADAR PIN 782003 DISTRICT NAGAON ASSAM | NAGAON | ASSAM | 782003 | ₹10.4 Cr+₹35.9 L (3.59%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | hitech construction L1 | RCN Constructions Pvt Ltd L2 |
|---|---|---|---|---|---|
| 1.00 | Clearing and Grubbing Road Land .(Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable materials to beused or auctioned up to lead of 1000metres including removal and disposal of top organic soil not exceeding 150mm thickness.
(I) By Manual Means:-
A. In area of light Jungle | 1.55 | Hect | - | - |
| 2.00 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 metres
(b) In Cement mortar | 840 | Cum | - | - |
| 3.00 | (IX) Removing all types of hume pipes and stacking within a lead f 1000 metres including earthwork and dismantling of masonry works
(b) Above 900mm dia | 86 | Metre | - | - |
| 4.00 | Construction of Subgrade and Earthen Shoulders (Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table (300-2) ( including compensation of earth.)(a), (Including cost of testing of materials at site and laboratory as directed by the deptt.) | 3,500 | Cum | - | - |
| 5.00 | Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density,complete as per cl. 401( with an initial lead of 5 Km.)( Including cost of testing of materials at site and laboratory as directed by the deptt.) | 2,686.6 | Cum | - | - |
| 6.00 | Wet Mix Macadam (Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sb-base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density ( including carriage up to initial lead of 5.0 km from quarry and carriage of mixed materials up to 10.0 Km initial lead from mixing plant ) | 3,552.68 | Cum | - | - |
| 7.00 | Prime coat (Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of specified quantity using mechanical means.)( Including cost of testing of materials at site and laboratory as directed by the deptt.)
B. Primer@ 1.00kg per sqm | 9,898 | Sqm | - | - |
| 8.00 | Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.( Including cost of testing of materials at site and laboratory as directed by the deptt.) | 19,796 | Sqm | - | - |
| 9.00 | Dense Graded Bituminous Macadam (Providing and laying dense bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5% by weight of total mix and filler transporting the hot miox to work site,laying with a hydrostatic paver finisher with sensor control to the reqd. grade, lavel and alignment,rolling with smooth wheeled,vibratory and tandem rollers to achieve the desired compaction as per MoSRT&H cl. no. 507. complete in all respect. (including carriage up to initial lead of 5.0 km from quarry and carriage of mixed materials up to 10.0 Km initial lead from mixing plant | 742.35 | Cum | - | - |
| 10.00 | Bituminous Concrete (Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 % of mix and filler transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the reqd. grade, lavel and alignment,rolling with smooth wheeled,vibratory and tandem rollers to achieve the desired compaction as per MoSRT&H cl. no.509. complete in all respect. ( including carriage up to initial lead of 5.0 km from quarry and carriage of mixed materials up to 10.0 Km initial lead from mixing plant ) | 395.92 | Cum | - | - |
Tender Value
₹10 Cr
EMD Value
₹20 L
Closing Date
5 Feb 2020, 2:00 pmClosed
Chief Engineer, PWD (Roads), Assam
O/o the Chief Engineer, PWD (Roads), Assam, Chandmari, Guwahati, 781003
SOPD_SIG_19_20_25 Imrovement of Pub Boragaon to Pachim Boragaon via Gossaigaon under Signature Project of SOPD-G (State Priority Scheme) for the year 2019-20, West Guwahati LAC
2020_PWD_15864_25
CE/DEV/TB/199/2019-20/01
Open Tender
Civil Works
Item Rate
270 days
West Guwahati
Please refer Tender documents.
6 documents required · 6 mandatory
₹10,000
Empowered Officer, ASRB A/C No. 10566991479
₹20 L
Yes
O/o the Chief Engineer, PWD (Roads), Assam
22 Feb 2020
13 Jan 2020
5 Feb 2020
13 Jan 2020
5 Feb 2020
17 Jan 2020
13 Jan 2020 - 1 Feb 2020
17 Jan 2020
Amount
Clearing and Grubbing Road Land .(Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable materials to beused or auctioned up to lead of 1000metres including removal and disposal of top organic soil not exceeding 150mm thickness. (I) By Manual Means:- A. In area of light Jungle
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 metres (b) In Cement mortar
(IX) Removing all types of hume pipes and stacking within a lead f 1000 metres including earthwork and dismantling of masonry works (b) Above 900mm dia
Construction of Subgrade and Earthen Shoulders (Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table (300-2) ( including compensation of earth.)(a), (Including cost of testing of materials at site and laboratory as directed by the deptt.)
Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density,complete as per cl. 401( with an initial lead of 5 Km.)( Including cost of testing of materials at site and laboratory as directed by the deptt.)
Wet Mix Macadam (Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sb-base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density ( including carriage up to initial lead of 5.0 km from quarry and carriage of mixed materials up to 10.0 Km initial lead from mixing plant )
Prime coat (Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of specified quantity using mechanical means.)( Including cost of testing of materials at site and laboratory as directed by the deptt.) B. Primer@ 1.00kg per sqm
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.( Including cost of testing of materials at site and laboratory as directed by the deptt.)
Dense Graded Bituminous Macadam (Providing and laying dense bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5% by weight of total mix and filler transporting the hot miox to work site,laying with a hydrostatic paver finisher with sensor control to the reqd. grade, lavel and alignment,rolling with smooth wheeled,vibratory and tandem rollers to achieve the desired compaction as per MoSRT&H cl. no. 507. complete in all respect. (including carriage up to initial lead of 5.0 km from quarry and carriage of mixed materials up to 10.0 Km initial lead from mixing plant
Bituminous Concrete (Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 % of mix and filler transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the reqd. grade, lavel and alignment,rolling with smooth wheeled,vibratory and tandem rollers to achieve the desired compaction as per MoSRT&H cl. no.509. complete in all respect. ( including carriage up to initial lead of 5.0 km from quarry and carriage of mixed materials up to 10.0 Km initial lead from mixing plant )
Road Marker (Centre & Edge Line) : Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes and conforming to the MoSrt&H specifications
Providing reflective pavement marker with Micro prismatic lens in both direction having thermoplastic body adhering to the specification and guidelines of MoSRT&H’s fixed to the road surface using the adhesives and the procedures recommended by the manufacturers with three months replacement warranty and free maintenance.
Providing ‘Sparkle Solar Road Studs, manufactured by Tata B.P. Solar India Ltd. Of size (125mmx125mm), 90mm height (from bottom of shank to the top of stud) with detachable battery, m6LEDs-three on each side for Bi-directional studs/3 LEDs on one side for unidirectional studs, ultra bright LED in amber and red colour, weight per stud 700+25 gms, flash rate of 50-65 times per minute completely water resistant and weather proof with replacement warranty and free maintenance fro one year from the date of installation of stud on road-(installation should be made using adhesives and procedures recommended by manufacturer under the supervision of their competent technician).
Retro reflectorised Traffic sign: Providing and erecting of Retro-Reflectrorised cautionary, mandatory & informatory sign as per IRC: 67 made of high intensity encapsulated lens type reflective sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick fixed on an angle iron of 25x25x4mm supported on a mild steel angle iron post 75mm x 75mm x 6mm firmly fixed to the ground by means of properly design foundation with M-15 grade Cement concrete 45cm x 45cm x 60cm, 60cm below ground level as per approved drawing and sign. ( All the Steel work must be Tata/Sail/or any other approved brand) 90cm equilateral traingle
Retro reflectorised Traffic sign: Providing and erecting of Retro-Reflectrorised cautionary, mandatory & informatory sign as per IRC: 67 made of high intensity encapsulated lens type reflective sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick fixed on an angle iron of 25x25x4mm supported on a mild steel angle iron post 75mm x 75mm x 6mm firmly fixed to the ground by means of properly design foundation with M-15 grade Cement concrete 45cm x 45cm x 60cm, 60cm below ground level as per approved drawing and sign. ( All the Steel work must be Tata/Sail/or any other approved brand) 60 cm circular
Kilo Metre Stone (Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc) Ordinary Kilometer stone (Precast)
'Planting of Trees and their Maintenance for one Year (Planting of trees by the road side (Avenue trees) in 0.60 m dia holes, 1 m deep dug in the ground, mixing the soil with decayed farm yard/sludge mannure, planting the saplings, backfilling the trenches, watering , fixing the tree guatrd and maintaining the plants for one year.
RCC CROSS CULVERT Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, constructing of shoring and bracing, removal of slumps and other deleterious matter, dressing of sides and bottom, backfilling with approved material
Dry rubble Flooring, Construction of dry rubble flooring at cross drainage works for relatively less important works
Plain cement concrete 1: 3: 6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Removal of Unserviceable Soil with Disposal upto 1000 metres (Removal of unserviceable soil including excavation, loading and disposal upto 1000 metres lead but excluding replacement by suitable soil which shall be paid separately as per clause 305.)
Supplying, fitting and placing TMT bar reinforcement in sub-structure complete as per drawing and technical specifications 1002,1005,1010 &1202.
Providing and laying Reinforced cement concrete, in sub-structure complete as per drawing and technical specification clause 800, 1205.4 and 1205.5 . (E) RCC Grade M20 (a) Height upto 5m
Supplyimg fitting fixing Iron manhole cover including cutting proper size and shapes , Welding etc. As directed by the deptt. And techanical specification.
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specification.
Back filling behind abutment, wing wall and return wall complete as per drawing and technical specification. (B) sandy materials
rubble mASONRY Guard wall Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, constructing of shoring and bracing, removal of slumps and other deleterious matter, dressing of sides and bottom, backfilling with approved material
Removal of Unserviceable Soil with Disposal upto 1000 metres (Removal of unserviceable soil including excavation, loading and disposal upto 1000 metres lead but excluding replacement by suitable soil which shall be paid separately as per clause 305.)
Dry rubble Flooring, Construction of dry rubble flooring at cross drainage works for relatively less important works
Plain cement concrete 1: 3: 6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Stone masonry work in cement mortar 1:3 for sub-structure complete as per drawing and Technical Specifications.(c) Course rubble masonry (forst sort)
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specification.
Back filling behind abutment, wing wall and return wall complete as per drawing and technical specification. (B) sandy materials
Plastering with cement mortar (1:3) on brick work in sub-structure as per Technical specifications
RCC DRAIN CUM FOOTPATH Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, constructing of shoring and bracing, removal of slumps and other deleterious matter, dressing of sides and bottom, backfilling with approved material
Dry rubble Flooring, Construction of dry rubble flooring at cross drainage works for relatively less important works
Plain cement concrete 1: 3: 6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Removal of Unserviceable Soil with Disposal upto 1000 metres (Removal of unserviceable soil including excavation, loading and disposal upto 1000 metres lead but excluding replacement by suitable soil which shall be paid separately as per clause 305.)
Supplying, fitting and placing TMT bar reinforcement in sub-structure complete as per drawing and technical specifications 1002,1005,1010 &1202.
Plain/Reinforced cement concrete, in sub-structure complete as per drawing and technical specification and steel shuttering formwork. (E) RCC Grade M20 (a) Height upto 5m Case I Using concrete Mixer
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specification.
Back filling behind abutment, wing wall and return wall complete as per drawing and technical specification. (B) sandy materials
RCN Constructions Pvt Ltd
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.46 MB
Tendernotice_2.pdf
PDF • 4.50 MB
Tendernotice_3.pdf
PDF • 0.37 MB
BOQ_24004.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .