Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 LAccepted-AOC | ₹1.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹1.7 LSame as L1Rejected-Finance | ₹1.7 LSame as L1 | L2 | Rejected-Finance Not selected in lottery |
| 3 | L2₹1.7 LSame as L1Rejected-Finance | ₹1.7 LSame as L1 | L2 | Rejected-Finance Not selected in lottery |
Tender Value
₹2.0 L
EMD Value
₹19,662
Closing Date
8 Apr 2026, 6:00 pmClosed
c.e office
c. e office kanpur nagar nigam motijheel
zone-01 ward-98 ke antargat 28/188 se 27/80 tak nala safai ka karya
2026_NNKAN_1127283_2
612/AA-1/2025-26
Open Tender
Civil Works
Fixed-rate
kanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
₹19,662
Yes
10 Aug 2026
2 Apr 2026
8 Apr 2026
2 Apr 2026
8 Apr 2026
2 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Disilting of nala under liqued mud under foul position etc all comp | - | cum | - | - |
| 1.02 | Cariage of silt under bucket etc all comp. | - | cum | - | - |
| 1.03 | Supply of sand filling bag etc all comp. | - | nos | - | - |
| 1.04 | Supply of Fotograph during work and after work etc all comp. | - | nos | - | - |
| 1.05 | Videogaphy during work and after work etc all comp. | - | job | - | - |
| 1.06 | providing and laying in position machine best and machine mix design M-25 grade cement concrete for rainforest cement concrete work using cement content as per approved design mix including pumping of concrete to site of laying but including loading the cast of centring shuttering finishing and reinforcement including and mixture in recommended propagation as per IS 9103 to escalate rated setting of concrete improve work imparing strength and durabilities as per direction of engineer in charge (note,-cement content consider in this item is @ 330 kg per cubic meter. Excess/less cement used as per design mix is payable /recoverable separately)all comp. | - | sqm | - | - |
| 1.07 | M.S. or iron in plain work such as reinforcement concrete or reinforced brick work (when not icluding over rate) wrought torequired shape as necessary including bending for proper complition of the work and including suply of steel its wastage bend hooks and authorized ocerlaping shall be measured up two floor two level (over all rate) | - | qtl | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_2114369.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.86 MB
BOQ_2114369.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .