Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L 1₹1.9 CrAccepted-AOC | ₹1.9 Cr | L 1 | Accepted-AOC Accept |
| 2 | L2₹1.9 Cr+₹7.5 L (3.99%)Rejected-AOC | ₹1.9 Cr+₹7.5 L (3.99%) | L2 | Rejected-AOC Reject |
| 3 | Rejected-Technical | - | - | Rejected-Technical Non Responsive |
Tender Value
₹2.1 Cr
EMD Value
₹4.1 L
Closing Date
24 Mar 2026, 5:00 pmClosed
Executive Engineer Construction Division no.3 Asr
Executive Engineer Construction Division no.3 Asr
Construction and Renovation of Aviation club at SGRD Airport Amritsar
2026_CEPW_163069_1
EE/C3/ASR/32 dated 09.03.2026
Open Tender
Civil Works - Buildings
Percentage
180 days
Amritsar
Please refer Tender documents.
16 documents required · 16 mandatory
₹10,000
Yes
₹4.1 L
Yes
2 Jun 2026
10 Mar 2026
25 Mar 2026
10 Mar 2026
24 Mar 2026
10 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Adminstrative & Security room Block | - | - | - | - |
| 2 | Earth work in exavation in foundations, trenches, etc. in all kinds of soil where pick jumper work is not involved and not exeeding 2.0 Mtr. depth and subsequent filling around masonary in 15 cm layers with compaction including disposal of all surplus soil as directed within a lead of 30 Mtr. complete in all respect as per specifcation, drawing and to the entire satisfication of Engineer In-Charge. | 835.64 | Cum | 102.19 | ₹85,394.05 |
| 3 | Cement Concrete 1:5:10 with stone ballast of size. 40 mm guage. using concrete mixing volumetric type | 105.58 | Cum | 4,191.9 | ₹4,42,580.8 |
| 4 | Reinforced cement concrete M-25 mechanicaly batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in foundation and plinth. | 223.22 | Cum | 6,214.63 | ₹13,87,229.71 |
| 5 | Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering) | 462.21 | Sqm | 221.24 | ₹1,02,259.34 |
| 6 | First class burnt brick work laid in cement sand mortar 1:6 in foundation and plinth. | 119.81 | Cum | 6,050.75 | ₹7,24,940.36 |
| 7 | Reinforced cement concrete M-25 mechanicaly batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in supersturcture. | 150.76 | Cum | 7,004.75 | ₹10,56,036.11 |
| 8 | Extra Rate For First Floor | 11.6 | Cum | 190.68 | ₹2,211.89 |
| 9 | Centering and shuttering for sides and soffits of beam, beams, launching girders, bressumers, lintels. | 307.2 | Sqm | 400.33 | ₹1,22,981.38 |
| 10 | Extra Rate For First Floor | 26.08 | Sqm | 10.54 | ₹274.88 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
BOQ_330442.xls
BOQ • 0.92 MB
SBDaviationclub.pdf
Tender Documents • 18.16 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .