Loading…
Loading…
Tender Value
₹76.1 L
EMD Value
₹3.8 L
Closing Date
12 Jun 2026, 12:00 pm7d left
CE LDA
Lucknow Development Authority, vipin Khand Gomti Nagar Lucknow
basantkunj yojna sthit RPS STHAL GATE NO-04 AND 05 KE MADY CC KAR EPDM FLORING AND JHULE WA JIM LAGANE KA KARYA
2026_LDAUP_1156771_1
27/E-NIVIDA/CE/26-27
Open Tender
Civil Works
60 days
LDA
Please refer Tender documents.
3 documents required · 3 mandatory
₹4,366
SECRETARY LDA
₹3.8 L
Yes
4 Jun 2026
4 Jun 2026
13 Jun 2026
4 Jun 2026
12 Jun 2026
4 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Supply and Installation of Spiral tunnel slide Code- FPRS16 Quotation Rate. | - | Nos | 2,15,600 | - | BI01010001010000000000000515BI0100001113 |
| 2 | Supply and Installation of Tri trap Code- NXESTR Quotation Rate. | - | Nos | 2,07,900 | - | BI01010001010000000000000515BI0100001113 |
| 3 | Supply and Installation of Double Arc swing Code- FPSW02 Quotation Rate. | - | Nos | 71,610 | - | BI01010001010000000000000515BI0100001113 |
| 4 | Providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete etc. as per direction of Engineer-in-charge (length of finished kerb edging shall be measured for payment). (Precast C.C. kerb stone shall be approved by Engineer-in-charge). | 1 | Cum | 7,992.43 | ₹7,984.44 | BI01010001010000000000000515BI0100001113 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :, 1:1½:3 (1 Cement: 1½ coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | - | Cum | 6,588.88 | - | BI01010001010000000000000515BI0100001113 |
| 6 | Supply and Installation of Leo Climber Code- FPCL46 Quotation Rate. | - | NOS | 7,43,050 | - | BI01010001010000000000000515BI0100001113 |
| 7 | Supply and Installation of Igloo Climber Code- FPCL03 Quotation Rate. | - | Nos | 9,18,918 | - | BI01010001010000000000000515BI0100001113 |
| 8 | Supply and Installation of Nexlev woody Toss Code- NXWDTO Quotation Rate. | - | Nos | 36,960 | - | BI01010001010000000000000515BI0100001113 |
| 9 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m., All kinds of soil. | 1 | Cum | 205.62 | ₹205.41 | BI01010001010000000000000515BI0100001113 |
| 10 | Supply and Installation of Orbit Climber Code- FPCL04 Quotation Rate. | - | Nos | 8,54,700 | - | BI01010001010000000000000515BI0100001113 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.12 MB
td.pdf
Tender Documents • 1.19 MB
BOQ_2167587.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid