Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹56.9 LAdmitted-Finance GOA | SOUTH GOA | GOA | 403802 | +4.90% | ₹56.9 L | L1 | Admitted-Finance |
| 2 | L2₹56.9 L+₹4,880.23 (0.09%)Admitted-Finance | +4.99% | ₹56.9 L+₹4,880.23 (0.09%) | L2 | Admitted-Finance |
Tender Value
₹54.2 L
EMD Value
₹1.1 L
Closing Date
7 Sept 2026, 11:00 amClosed
EE XIII(R), PWD MAPUSA GOA
EE XIII(R), PWD MAPUSA GOA
Urgent repairs to various roads connecting elevated corridor on account of VIP visit for inauguration of Porvorim-Guirim Elevated Corridor in Porvorim constituency, Bardez Taluka.
2026_PWD_31623_1
6/4/PWD-WD-XIII (R)/ASW/15/2026-27L2
Open Tender
Civil Works - Roads
Percentage
30 days
MAPUSA
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,000
₹1.1 L
7 Sept 2026
5 Sept 2026
7 Sept 2026
5 Sept 2026
7 Sept 2026
5 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Prime coat (Providing and applying primer coat with bitumen emulsion on prepared surface of
granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using
mechanical means.) | 7,993.56 | sqm | 39 | ₹3,11,748.84 |
| 2 | Bituminous Concrete (Providing and laying bituminous concrete with 100-120 TPH batch type
hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of
specified grading premixed with bituminous binder @ 5.4 to 5.6 % of mix and
filler transporting the hot mix to work site laying with a hydrostatic paver
finisher with sensor control to the required grade level and alignment rolling with
smooth wheeled vibratory and tandem rollers to achieve the desired compaction as per
MORTH specification clause No. 507 complete in all respects);for Grading-I
( 13 mm nominal size ) | 319.74 | cum | 14,079 | ₹45,01,619.46 |
| 3 | Bituminous Macadam (Providing and laying bituminous macadam with 100-120 TPH hot mix
plant producing an average output of 75 tonnes per hour using crushed aggregates of specified
grading premixed with bituminous binder transported to site laid over a previously prepared
surface with paver finisher to the required grade leve l and alignment and rolled as per MORT& H Specifi
cationsFifth Edition.;for GradingII(19 mm nominal
size) | 29 | m3 | 9,741 | ₹2,82,489 |
| 4 | Supplying of laterite stone soling of size 150-200 mm size and murrum having P.
I. Value not more than 6 and laying including packing with smaller stones and consolidation
with power road roller including spreading watering and consolidation
of binding material etc.(Measurements shall be considered on finished item) . | 147.65 | m3 | 1,867 | ₹2,75,662.55 |
| 5 | Add 1 % labour cess on item 1,2&3 | 1 | m3 | 50,958.57 | ₹50,958.57 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.49 MB
Tendernotice_2.pdf
PDF • 1.80 MB
Tendernotice_3.pdf
PDF • 1.15 MB
BOQ_32008.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .