Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.0 LAccepted-AOC | L1 | Accepted-AOC Lowest | |
| 2 | L2₹10.4 L+₹16,151 (1.57%)Rejected-Finance GF AKRITI TOWER 19 B VIDHAN SABHA MARG LUCKNOW PIN 226001 | LUCKNOW | LUCKNOW | UTTAR PRADESH | 226001 | L2 | Rejected-Finance Being other than lowest | |
| 3 | L3₹17.4 L+₹7.2 L (69.7%)Rejected-Finance | L3 | Rejected-Finance Being other than lowest | |
| 4 | L4₹20.4 L+₹10.1 L (98.9%)Rejected-Finance | L4 | Rejected-Finance Being other than lowest |
Tender Value
Refer Docs
EMD Value
₹36,000
Closing Date
12 Mar 2021, 6:00 pmClosed
GE (AF) E/M CHAKERI KANPUR
GE (AF) E/M CHAKERI KANPUR208008
WORK SERVICES FOR OPERATION OF FIRE PUMP HOUSE MAINT OF FIRE HYDRANT SYSTEM OF 110 BLOCK AND COMPREHENSIVE MAINT OF CO2 FLOODING AND FIRE ALARM SYSTEM FOR 110 BLOCK AND ROH IN TECH AREA AT AF STN CHAKERI KANPUR
2021_MES_423803_1
8422/E8
Open Tender
Civil Works
Item Rate
335 days
GE (AF) E/M CHAKERI KANPUR
Asper NIT
9 documents required · 9 mandatory
₹500
GE (AF) E/M CHAKERI
₹36,000
Yes
19 Mar 2021
19 Feb 2021
17 Mar 2021
19 Feb 2021
12 Mar 2021
26 Feb 2021
Amount
Operation of all equipement installed in Fire Fighting Pump House installed at 110 Block in tech area in 02 Shifts (01 No operator semi skilled to be deployed for each shift) i.e. 2x08 working hours, except sunday & holiday or decided by Air Force Authority) including routine cleaning of pump house and operation of fire hydrant system complete all as specified and directed. Tentative shift timing shall be as under, however it can be changed as per site requirement:- (i) 0600 hrs to 1400 hrs (ii) 1400 hrs to 2200 hrs NOTES: (i) Salaries of tradesmen shall be credited in the bank accounts of tradesmen hired. (ii) No payment will be made for Nos of day (08 Hrs) when trademen absent and effective recovery @ Rs1500/- shall be made for per shift per operator/valveman (08 hrs). (iii) Particulars of employeded trademan shall be maintained properly. (iv) Proper record/attendance register duly signed by contractor shall be maintained. (v) Provn of daily log sheet for pump houses shall be the responsibility of the contractor with out any extra cast and shall be submitted to the deptt duly signed by the trademen. (vi) Proper uniform shall be provided by the contractor after approval of Engr-in-Charge (vii) Preventive maintenance including cleaning of Eqpts,tightening the loose contacts etc pertains to the installation shuld be carried out and monthly report submitted to the deptt. (viii) Pump operator (semi skilled ) should be ITI qualified.
Repair, comprehensive and Preventive Maintenance of FIREALARM AND CO2 FLOODING SYSTEM 110 Block (22 Nos Rig each rig seprate zone panel ,83Nos CO2 Cylinder and 22Nos N2 Cylinder and 12 Zone Fire Alarm system conventional type ) as per manufacturers reccomendation complete all as specified and directed. (i) Checking and cleaning of smoke/ heat detectors ,nozzles /Co2 pipe line etc. (ii) Checking of main control panel and control wiring (iii) weighing of CO2 /N2 cylinders Note : (a) If any defect notice/found ,the same should be rectify immediatly and report to Engr-in-charge. (b) Spares shall be measured and paid separately under relavent item of schedule. (c) If defect not rectified by contractor with in stipulated period Engineer-in-charge then penality @ 500/per day will be recover from RAR /BILL.
Repair, comprehensive and preventive maintenance of CO 2 flooding system in ROH flight(one nos two zone panel, 8 Nos CO2 Cylinder and 01 Nos N2 Cylinder) as per manufacturers reccomendation which include the following:- (i) Checking and cleaning of smoke/ heat detectors ,nozzles/Co2 pipe line etc complete all as specified & directed. (ii) Checking of main control panel and control wiring (iii) weighing of CO2 /N2 cylinders Note : (a) If any defect notice/found ,the same should be rectify immediatly and report to Engr-in-charge. (b) Spares shall be measured and paid separately under relavent item of schedule. (c) If defect not rectified by contractor with in stipulated period as directed by Engineer-in-charge then penality @ 500/per day will be recover from RAR /BILL.
Supply only optical type smoke detector supply voltage 9 to 33 V DC ,UL/FM/LPC approved with junction box and base to be fixed inside test rig with suitable fixing arrangement complete all as specified and directed. Make: Apollo/system senser/Siemens
Supply only fixed cum ROR type heat detector class AIR supply voltage 9 to 33 VDC , UL/FM/LPC approved with base complete all as specified and directed. Make: Apollo /System senser/Siemens
Supply only optical type Multisensor smoke with heat detector supply voltage 9 to 33 V DC ,UL/FM/LPC approved with junction box and base to be fixed with suitable fixing arrangement complete all as specified and directed. Make: Apollo/system sensor/Siemens
Supply & fixing in repair of gun metal landing valve single headed 80 mm dia, flanged inlet 63 mm dia instant type female outlet complete with gun metal cap complete all as specified and directed. Make: G Tech/GEM/New Age/Flamex/ Omex
Supply & fixing in repair of 63 mm dia RRL hose pipe 30 Mtr long with instantaneous type gun metal 63 mm dia ISI marked male & female couplings bend riveted to hose pipe complete all as specified and directed. Make: New Age/Atasi/Omex
Supply & fixing in repair of pneumatic actuator made of brass on CO2 cylinder ISI marked IS 3224, complete all as specified and directed. Make: KEW /Rotex
Supply & fixing in repair of electric solenoid operated actuator code 20126-1.2-2G-S8 DC 24 Volt 11 Watt type 6 Size II all as per IS 8935 for operating the value of nitrogen cylinder complete all as specified and directed. Make: Rotex /KEW
Supply & fixing in repair of wire braded high pressure discharge hose 3/8" WP 3024 PSI /210 BAR on CO2 cylinder complete all as specified and directed.
Supply and filling CO2 gas in fire extinguisher of different capacity including Transportation for refilling from site to workshop on to & fro basise including testing of cylinder before filling the gas complete all as specified and directed.
Supply and filling N 2 gas in fire extinguisher of different capacity including Transportation for refilling from site to workshop on to & fro basis including testing of cylinder before filling the gas complete all as specified and directed.
Supply & fix in repair of CO2 release unit for manually operated with push button fired bride MS box duly painted sealed with glass complete all as specified and directed. Make: Agani/NSD/Agani Alarm
Supply & fix in repair of manual call point with push button fired bride MS box duly painted sealed with glass including necessary electrical connection complete all as specified and directed. Make: Agani/NSD/Agani Alarm
Supply & fix in repair of low intensity hooter for warning of fire connected with central contol panel installed in each zone inside the rooms complete all as specified and directed. Make: Agani/NSD/Agani Alarm
Repair /Maintenance of Fire Zone panels /fire alarm panel in the 110 Block /ROH Flight by means of their cleaning, checking of circuits including recalibration to make the system serviceable complete all as specified and directed. Note :- Spare parts measured and paid seperately under respective item of BOQ.
Supply & fixing in repair of single stage N2 gas regulator system for digital panel complete all as specified and directed.
Supply & fixing in repair of display card microprocessor based detecting system of CO2 flooding system for digital panel complete all as specified and directed.
Supply & fixing in repair of zone card for digital panel complete all as specified and directed.
Supply & fixing in repair of gas flooding control card of CO2 flooding system for digital panel complete all as specified and directed.
Supply & fixing in repair of SMPS power supply including transformer of CO2 flooding system for digital panel complete all as specified and directed.
Supply & fixing in repair of adaptor for N2 gas cylinder making all arrangement to arrest leakage of gas for digital panel complete all as specified and directed.
Supply & fixing in repair of lead acid battery of 12 Volt, 7 AH complete all as specified and directed. Make: EXIDE /OKAYA/AMRON
Supply & fixing in repair of lead acid battery of 12 Volt, 32 AH complete all as specified and directed. Make: EXIDE /OKAYA/AMRON
Supply & fixing in repair of lead acid battery of 12 Volt, 150 AH complete all as specified and directed. Make: EXIDE /OKAYA/AMRON
Supply & fixing in repair sluice valves 150 mm dia class PN-1.0 , IS-14846 with flanged ends, stainless steel spindle and iron wheel including nut bolts and rubber packing complete all as specified and directed. Make: Kirloskar /Upadhaya /GDPA/Kartar
All as per item No 27 but 100mm bore
Testing of CO2 flooding system in automatic and manual mode in Rigs of 110 Blocks/ROH flight by flooding of Co2 gas in rig and reinstalling filled CO2 gas cylinder, cleaning of smoke /heat detector and making system functional complete all as specified and directed.
Repair and preventive maintenance of 55 KW centrifugal pump which include replacement of bearing ,gland etc. and tightening of nuts bolts, washers greasing etc for proper running of pump and checking of all electrical connections from engine to panel and make it functional in manual/auto mode complete all as specified and directed. Note : spares parts shall be measured and paid separately.
Repair and preventive maintenance of Centrifugal fire pump 15 KW , which include replacement of bearing ,gland etc. and tightening of nuts bolts, washers greasing etc for proper running of pump and checking of all electrical connections from engine to panel and make it functional in manual/auto mode complete all as specified and directed. Note : Spares Parts shall be measured and paid separately.
Supply only Bearing of centrifugal pump 55 KW exsisting size complete all as specified and directed. Make: SKF/Tata/NBC
Supply only Bearing of Centrifugal fire pump 15 KW exsisting size complete all as specified and directed. Make: SKF/Tata/NBC
Supply only rubber bush for coupling complete all as specified and directed.
Supply only Gland bush set complete all as specified and directed.
Supply only Gland packing including nut & bolts suitable for 15/55 KW fire pump and engine set complete all as specified and directed.
Repair and preventive maintenance of Fire diesel engine pump set 93BHP capacities which include tightening of battery terminals,checking of oil level , greasing ,filling of distilled water in battery etc and any minor repair to make engine set functional complete all as specified and directed.
Supply and fixing Rubber hose pipe engine set 93 BHP complete all as specified and directed.
Supply and fixing Oil pressure pipe of Engine set 93 BHP complete all as specified and directed.
Supply and fixing Coolant for radiator of any type of DG set complete all as specified and directed. Make: Castorl/Servo ./HP
Supply only Lub Oil filter of engine set 93 BHP complete all as specified and directed. Make: Mico /Kirloskar/Fleet guard
Supply only Diesel filter of engine set 93 BHP complete all as specified and directed. Make: Mico /Kirloskar/Fleet guard
Repair and overhauling and servicing of self starter 12 V by replacement of clutch,carbon bush etc complete all as specified and directed.
Supply and filling of Engine oil 20W40 complete all as specified and directed. Make: Castrol/Servo/HP
Supply and fixing in repair of battery 12 volts 180AH including battery terminals complete all as specified and directed. Make: Exide/Amron/SF
S&F in repair of MS ERW pipe 200 mm bore class C heavy duty including cutting and welding , fittings for fire pipe line in pump house complete all as specified and directed. Make: Jindal/Tata
All as per item no 46 but pipe size 100 mm
All as per item no 46 but pipe size 80 mm
Supply,and fixing in repair of Fire extinguisher CO2 type 4.5 kg capacity Cylinder ISI marked IS : 15683 class 13 B type of fire fitted with PVC bend horn complete all as specified and directed. Make: Cease fire/Omex/Minimax
Supply and installed in repair ABC type fire extinguisher 9 kg capacity ISI marked confirming to IS 15683 with & discharge pipe etc as required complete all as specified and directed. Make: Cease fire/Omex/Minimax
M & L for two coats painting of plant MS platform angle/pipe/ channel support MS tank from out side cable tray and other related surface using Synthetic enamel paint of existing colour including removing rust/dust and oil from surface and writing letters etc complete all as specified and directed.
M&L for fabrication of mild steel flats iron clamp,angle iron ,for support of pipeline , nut bolt etc including painting with one coat of synthetic enamel paint over a coat of red oxide complete all as specified and directed.
Repair and maintenance of automatic system of Fire pump house including replacement of control wiring ,relay,contactor etc including replacement of minor parts to make functional and interlocking of jockey pump ,main fire pump and fire engine pump set including testing complete all as specified and directed.
S&F in repair of pressure switch universal type as per existing type complete all as specified and directed. Make: Indfos
Supply and laying of XLPE insulated PVC sheathed armoured copper conductor 1.5 Sqmm 2 core on surface with fitting complete all as specified and directed. Make: Fionlex /Plaza/Havells.
Supply and laying in repair of FR PVC insulated copper conductor 1.5 Sqmm 2 core multistrand flexible cable drawing in existing steel conduit complete all as specified and directed. Make: Fionlex /Plaza/Havells.
Cleaning of semi under ground water sump of capacity 20000 Gallon approx inside by Mechanised de-watering by using industrial submersible pump, Scrapping sludge and removal by using industrial sludge pumping, Cleaning of all dust particle,Sterilization of sump by using chlorination chemical on internal surfaces of wall including preperation of surfaces, writing date of cleaning of sump with white paint on black base complete all as specified and directed.
Prime Technology
BRITE INDUSTRIES
M/s R.V. Constructions
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .