| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.7 CrAccepted-AOC | ₹28.7 Cr | L1 | Accepted-AOC Due to L1 |
| 2 | L2₹29.2 CrRejected-Finance | ₹29.2 Cr | L2 | Rejected-Finance Due to L2 |
| 3 | L3₹29.7 CrRejected-Finance | ₹29.7 Cr | L3 | Rejected-Finance Due to L3 |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹44.3 L
Closing Date
23 Mar 2023, 2:00 pmClosed
Superintending Engineer Sitapur/Kheri Circle PWD S
Office of the S.E.Sitapur/Kheri Circle PWD Sitapur
Widening And Strengthing of Sidhauli-Biswan Road (MDR-23C). Km- 1 to 28(730).
2023_CEUCZ_783677_1
1095/352C/E.TEND/STP-LMP/22-23 Dt.04-03-2023
Open Tender
Civil Works - Roads
365 days
Sitapur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,715
₹44.3 L
Yes
Office of the S.E.Sitapur/Kheri Circle PWD Sitapur
2 Jun 2023
16 Mar 2023
23 Mar 2023
16 Mar 2023
23 Mar 2023
16 Mar 2023
18 Mar 2023
Amount
Construction of Emabankment with approved material obtained from borrowpits with all lifts and leads,spreading,grading to required slope and compected to meet requirement of table 300-2.
Earthwork in excavation of foundation of structures as per drawing and technical specification,including setting out,construction of shoring and bracing,removal of stumps and other deleterious matter,dressing of sides and bottom,brakfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.
Construction of subgrade and earthen shoulder with approved material obtained from borrowpits with all lifts and leads,spreading,grading to required slope and compected to meet requirement of table 300-2.
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in subbase/base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. (Only spreading and Compacting)
Providing and applying tack coat with VG_10 using bitumen distributor at the rate of 0.20 kg per sqm on the prepared surface cleaned with hydraulic broom .
Providing laying spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in machenical mix plant carriage of mixed material by tipper to site , laying of 1% OPC cement and 3.5% emulsion in uniform layers with paver in sub-base / base course on well prepared surface and compacing with vibratory roller to achieve the desired density.
Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder VG_30 @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.
Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG_30 @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects
Earthwork in excavation of foundation of structures as per drawing and technical specification,including setting out,construction of shoring and bracing,removal of stumps and other deleterious matter,dressing of sides and bottom,brakfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.
Plain cement concrement 1:3:6 nominal mix in foundation with crushed aggregate 40 mm nominal size mechanically mixed,placed in foundation and compected by vibration including curing for 14 days.
Brick masonry work in cement mortar 1:3 in foundation complete excluding pointing and plastering as per drawing and technical speficiations .
Pointing with cement mortar (1:3) on brickwork in sub structure & super structure as per drawing and technical specification.
Plastering with cement mortar (1:3) in substructure/ superstracutre as per technical specification.
Supplying fitting and placing HYSD bar reinforcement in superstructure complete as per drawing and Technical Specifications clauses.
Laying of reinforcement conrement pipe 1000 mm for culvert on first class bedding of granula material in single row including fixing collar with cement mortar 1:2 but excluding excavation protection works back filling concrete and masonary works in head walls and prapets.
R.C.C. Work with cement approved coarse sand and 20 mm gauge stone grit in proportion of 1:1.5:3 for slabs excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shutterring etc. and also including supply of all materials labour and T&P etc. required for proper completion of work. Binding wire cost being included in the item as per SI No. 283(b)
R.C.C. Work with cement approved coarse sand and 20 mm gauge stone grit in proportion of 1:2:4 for slabs excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shutterring etc. and also including supply of all materials labour and T&P etc. required for proper completion of work. Binding wire cost being included in the item as per SI No. 283(b)
Providing and laying Cement Concrete 1:2:4(1 cement :2sand : 4 20 mm nominal size grit) including supply of all materials, labour and T&P etc. required for proper completion of work and curing complete, also including cost of formwork in foundation and floors as per SI no.279(b)
Filling as filler material between roadcrust and abutment
Providing and laying of weephole in brick massonary in abutment with 100mm dia PVC pipe extending through the full width of the structuer with slope of 1v:20 H toward drawing force complete as per drawing and technical specification (MORTH &H-13.8/2706&2200)
Colour washing two coat
Lettering and painting of culvert no. plate 30x30cm of standard size with 2 coats of approved synthetic enamel paint and lettering as per PWD Maintenance manual including cost of all material T&P etc. complete
Scarifying existing bituminous road surface to and disposal of scraified material within all lifts and lead upto 1000 metres
M/s MAA AADI SHAKTI CONSTRUCTION
M/S M V D INFRA DEVELOPERS PRIVATE LIMITED
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf