Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹43.4 LAccepted-AOC DHOBI MOHALLA BATMALOO SRINAGAR 190010 J K | SRINAGAR | SRINAGAR | J K | 190010 | L1 | Accepted-AOC Awarded being lowest as per NIT | |
| 2 | L2₹52.9 L+₹4.8 L (10.0%)Rejected-Finance QURESHI BUILDING BUDSHAH CHOWK SRINAGAR 190001 KASHMIR J K | SRINAGAR | SRINAGAR | JAMMU AND KASHMIR | 190001 | L2 | Rejected-Finance Rejected being L2 bidder | |
| 3 | L3₹53.2 L+₹5.2 L (10.7%)Rejected-Finance OPP KIRYAPA PARK NATIONAL HIGHWAY ROAD BARAMULLA J K 193101 | NA | NA | 193101 | L3 | Rejected-Finance Rejected being L3 bidder | |
| 4 | L4₹67.9 L+₹19.8 L (41.1%)Rejected-Finance 254 GOVT HOUSING COLONY CHANNAPORA SRINAGAR 190015 | SRINAGAR | SRINAGAR | JAMMU AND KASHMIR | 190015 | L4 | Rejected-Finance Rejected being L4 bidder |
Tender Value
₹76 L
EMD Value
₹1.4 L
Closing Date
11 Nov 2024, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CWE, HQ 133 WORKS ENGRS
HQ 133 WORKS ENGRS, C/O 56 APO, PIN- 914133
CA NO. CWEK-60/874 EWS/2024-25- REPAIR AND MAINT OF STANDBY DG SETS AND CONNECTED ACCESSORIES AT VARIOUS LOCATIONS UNDER GE 874 EWS
2024_MES_678151_1
CWEK-60/874 EWS/2024-25
Open Tender
Electrical and Maintenance Works
Item Rate
270 days
GE 874 EWS
Class C and above and
category b i
7 documents required · 7 mandatory
₹1,000
GE 874 EWS
₹1.4 L
HQ 133 WORKS ENGRS
16 Dec 2024
5 Oct 2024
19 Nov 2024
5 Oct 2024
11 Nov 2024
28 Oct 2024
5 Oct 2024 - 14 Oct 2024
15 Oct 2024
Amount
M&L for Disconnecting, taking out and opening of DG set 250/200 KVA by unscrewing nuts, bolts and servicing of DG set with checking of lubricating oil, coolant, V belt, greasing and oiling of parts and topping up necessary oils, cleaning the inner body, tank and radiator by removing sludge etc and reassembling the DG set after repair/renewal of unserviceable parts of DG set and testing complete all as specified and directed. installed at different location of AOR of GE 874 EWS. Note :- Cost of spares/parts mentioned below will be measured and paid seprately as supply only under respective items mentioned here-in-below. However other minor consumables and spares are included.
Supply Only of Fuel filter of DG set 250/200 KVA complete all as specified and directed.
Supply Only of Lube oil filter of DG set 250/200 KVA complete all as specified and directed.
Supply Only of Air filter of DG set 250/200 KVA complete all as specified and directed.
Supply Only of Cooper washer of DG set 250/200 KVA complete all as specified and directed.
Supply Only of Banjo bolt of DG set 250/200 KVA complete all as specified and directed.
Supply Only of Fuel pipe of DG set 250/200 KVA complete all as specified and directed.
Supply Only of Hose water pipe for radiator of DG set 250/200 KVA complete all as specified and directed.
Supply Only of Warm drive H/clip of DG set 250/200 KVA complete all as specified and directed.
Supply Only of V-belt of DG set 250/200 KVA complete all as specified and directed.
M&L for disconnecting, taking out and opening of DG set 125/ 100 KVA by unscrewing nuts, bolts and servicing of DG set with checking of lubricating oil, coolant, V belt, greasing and oiling of parts and topping up necessary oils, cleaning the inner body, tank and radiator by removing sludge etc and reassembling the DG set after repair/renewal of unserviceable parts of DG set and testing complete all as specified and directed. installed at different location of AOR of GE 874 EWS. Note :- Cost of spares/parts mentioned below will be measured and paid seprately as supply only under respective items mentioned here-in-below. However other minor consumables and spares are included.
Supply Only of Fuel filter of DG set 125/ 100 kVA complete all as specified and directed.
Supply Only of Lube oil filter of DG set 125/ 100 kVA complete all as specified and directed.
Supply Only of Air filter of DG set 125/ 100 kVA complete all as specified and directed.
Supply Only of Cooper washer of DG set 125/ 100 kVA complete all as specified and directed.
Supply Only of Banjo bolt of DG set 125/ 100 kVA complete all as specified and directed.
Supply Only of Fuel pipe of DG set 125/ 100 kVA complete all as specified and directed.
Supply Only of Hose water pipe for radiator of DG set 125/ 100 kVA complete all as specified and directed.
Supply Only of Warm drive H/clip of DG set 125/ 100 kVA complete all as specified and directed.
Supply Only of V-belt of DG set 125/ 100 kVA complete all as specified and directed.
M&L for Disconnecting, taking out and opening of DG set 82.5 KVA by unscrewing nuts, bolts and servicing of DG set with checking of lubricating oil, coolant, V belt, greasing and oiling of parts and topping up necessary oils, cleaning the inner body, tank and radiator by removing sludge etc and reassembling the DG set after repair/renewal of unserviceable parts of DG set and testing complete all as specified and directed. installed at different location of AOR of GE 874 EWS. Note :- Cost of spares/parts mentioned below will be measured and paid seprately as supply only under respective items mentioned here-in-below. However other minor consumables and spares are included.
Supply Only of Fuel filter of DG set 82.5 kVA complete all as specified and directed.
Supply Only of Lube oil filter of DG set 82.5 kVA complete all as specified and directed.
Supply Only of Air filter of DG set 82.5 kVA complete all as specified and directed.
Supply Only of Cooper washer of DG set 82.5 kVA complete all as specified and directed.
Supply Only of Banjo bolt of DG set 82.5 kVA complete all as specified and directed.
Supply Only of Fuel pipe of DG set 82.5 kVA complete all as specified and directed.
Supply Only of Hose water pipe for radiator of DG set 82.5 kVA complete all as specified and directed.
Supply Only of Warm drive H/clip of DG set 82.5 kVA complete all as specified and directed.
Supply Only of V-belt of DG set 82.5 kVA complete all as specified and directed.
M&L for Disconnecting, taking out and opening of DG set 75/63/62.5/50 KVA by unscrewing nuts, bolts and servicing of DG set with checking of lubricating oil, coolant, V belt, greasing and oiling of parts and topping up, cleaning the inner body, tank and radiator by removing sludge etc and reassembling the DG set after repair/renewal of unserviceable parts of DG set and testing complete all as specified and directed. installed at different location of AOR of GE 874 EWS. Note :- Cost of spares/parts mentioned below will be measured and paid seprately as supply only under respective items mentioned here-in-below. However other minor consumables and spares are included.
Supply Only of Fuel filter of DG set 75/63/62.5/50 KVA complete all as specified and directed.
Supply Only of Lube oil filter of DG set 75/63/62.5/50 KVA complete all as specified and directed.
Supply Only of Air filter of DG set 75/63/62.5/50 KVA complete all as specified and directed.
Supply Only of Cooper washer of DG set 75/63/62.5/50 KVA complete all as specified and directed.
Supply Only of Banjo bolt of DG set 75/63/62.5/50 KVA complete all as specified and directed.
Supply Only of Fuel pipe of DG set75/63/62.5/50 KVA complete all as specified and directed.
Supply Only of Hose water pipe for radiator of DG set 75/63/62.5/50 KVA complete all as specified and directed.
Supply Only of Warm drive H/clip of DG set75/63/62.5/50 KVA complete all as specified and directed.
Supply Only of V-belt of DG set 75/63/62.5/50 KVA complete all as specified and directed.
M&L for Disconnecting, taking out and opening of DG set 40/35/25/15 KVA by unscrewing nuts, bolts and servicing of DG set with checking of lubricating oil, coolant, V belt, greasing and oiling of parts and topping up, cleaning the inner body, tank and radiator by removing sludge etc and reassembling the DG set after repair/renewal of unserviceable parts of DG set and testing complete all as specified and directed. installed at different location of AOR of GE 874 EWS. Note :- Cost of spares/parts mentioned below will be measured and paid seprately as supply only under respective items mentioned here-in-below. However other minor consumables and spares are included.
Supply Only of Fuel filter of DG set 40/35/25/15 KVA complete all as specified and directed.
Supply Only of Lube oil filter of DG set 40/35/25/15 KVA complete all as specified and directed.
Supply Only of Air filter of DG set 40/35/25/15 KVA complete all as specified and directed.
Supply Only of Cooper washer of DG set 40/35/25/15 KVA complete all as specified and directed.
Supply Only of Banjo bolt of DG set 40/35/25/15 KVA complete all as specified and directed.
Supply Only of Fuel pipe of DG set 40/35/25/15 KVA complete all as specified and directed.
Supply Only of Hose water pipe for radiator of DG set 40/35/25/15 KVA complete all as specified and directed.
Supply Only of Warm drive H/clip of DG set 40/35/25/15 KVA complete all as specified and directed.
Supply Only of V-belt of DG set 40/35/25/15 KVA complete all as specified and directed.
M&L for Overhaul of DG Set to include disconnecting, taking out and opening of DG set, head job of 250/200/125/100 KVA gen set etc and reassembling the DG set after repair/renewal of unserviceable parts of DG set, any machining works (such as grinding, milling, Lathe and other jobs), any other job to make the DG Set operational and testing complete all as specified and directed. (The DG Set shall be provided with an all inclusive warranty period of 365 days (of running time) from the date of making the DG set operational. Any off road period during this warranty time will sufficiently enhance the warranty duration) Note :- Cost of spares/ parts/ jobs mentioned below will be measured and paid seprately as supply only under respective items mentioned here-in-below. However other minor consumables, spares and jobs are included.
Head facing/Grinding Job
Supply Only of Inlet/Exhaust Valve
Supply Only of Oil Valve Seal
Supply Only of Valve Spring
Supply Only of Valve Guide
Supply Only of Valve seat Inlet/Exhaust
F.I.P Calbiration, cleaning and repair Job (upto250 kVA DG Set)
Injector Nozzel
Supply Only of Began
Supply Only of Linear
Supply Only of Piston
Supply Only of Ring Set
Supply Only of Main Began Bearing
Supply Only of Connecting Rod Bush
Supply Only of Cylinder Rubber Kit
Supply Only of Hose Kit
Supply Only of Benjo
Supply Only of Non Return Valve (NRV)
Supply Only of Fevibond/ epoxy/ cyanoacrylate, as required for complete overhaul of the DG Set
Supply Only of Battery Charger (smart, fast charging type, with both DC and AC inputs)
Supply Only of Battery Terminals
Supply Only of Head Guide
Supply Only of Water Pump
Dynamo Repair Job
Self Starter Repair Job
Supply Only of Starter Switch 24v
Supply Only of Feed Pump
Supply Only of AVR
Supply Only of Head Gasket
Supply Only of Belt Small
Supply Only of Belt Large
Supply Only of Rocker Set/ assembly
Supply Only of Turbo Drain Pipe
Supply Only of Packing Kit, complete for the overhaul
Supply Only of Fuel Pipe
Supply Only of House Connection
Supply Only of Copper Washers
Connecting Rod alignment Job, including any stores required for renewal.
Supply Only of Connecting Rod
Transportation required to work site and back/ for shifting of DG Set from one location to another
M&L for Overhaul of DG Set to include disconnecting, taking out and opening of DG set, head job of 82.5 KVA gen set etc and reassembling the DG set after repair/renewal of unserviceable parts of DG set, any machining works (such as grinding, milling, Lathe and other jobs), any other job to make the DG Set operational and testing complete all as specified and directed. (The DG Set shall be provided with an all inclusive warranty period of 365 days (of running time) from the date of making the DG set operational. Any off road period during this warranty time will sufficiently enhance the warranty duration) Note :- Cost of spares/ parts/ jobs mentioned below will be measured and paid seprately as supply only under respective items mentioned here-in-below. However other minor consumables, spares and jobs are included.
Head facing/Grinding Job
Supply Only of Inlet/Exhaust Valve
Supply Only of Oil Valve Seal
Supply Only of Valve Spring
Supply Only of Valve Guide
Supply Only of Valve seat Inlet/Exhaust
F.I.P Calbiration, cleaning and repair Job (82.5/ 75 kVA DG Set)
Injector Nozzel
Supply Only of Began
Supply Only of Linear
Supply Only of Piston
Supply Only of Ring Set
Supply Only of Main Began Bearing
Supply Only of Connecting Rod Bush
Supply Only of Cylinder Rubber Kit
Supply Only of Hose Kit
Supply Only of Benjo
Supply Only of Non Return Valve (NRV)
Supply Only of Fevibond/ epoxy/ cyanoacrylate, as required for complete overhaul of the DG Set
Supply Only of Battery Charger (smart, fast charging type, with both DC and AC inputs)
Supply Only of Battery Terminals
Supply Only of Head Guide
Supply Only of Water Pump
Dynamo Repair Job
Self Starter Repair Job
Supply Only of Starter Switch 24v
Supply Only of Feed Pump
Supply Only of AVR
Supply Only of Head Gasket
Supply Only of Belt Small
Supply Only of Belt Large
Supply Only of Rocker Set/ assembly
Supply Only of Turbo Drain Pipe
Supply Only of Packing Kit, complete for the overhaul
Supply Only of Fuel Pipe
Supply Only of House Connection
Supply Only of Copper Washers
Connecting Rod alignment Job, including any stores required for renewal.
Supply Only of Connecting Rod
Transportation required to work site and back/ for shifting of DG Set from one location to another
M&L for Overhaul of DG Set to include disconnecting, taking out and opening of DG set, head job of 63/ 62.5/ 50 KVA gen set etc and reassembling the DG set after repair/renewal of unserviceable parts of DG set, any machining works (such as grinding, milling, Lathe and other jobs), any other job to make the DG Set operational and testing complete all as specified and directed. (The DG Set shall be provided with an all inclusive warranty period of 365 days (of running time) from the date of making the DG set operational. Any off road period during this warranty time will sufficiently enhance the warranty duration) Note :- Cost of spares/ parts/ jobs mentioned below will be measured and paid seprately as supply only under respective items mentioned here-in-below. However other minor consumables, spares and jobs are included.
Head facing/Grinding Job
Supply Only of Inlet/Exhaust Valve
Supply Only of Oil Valve Seal
Supply Only of Valve Spring
Supply Only of Valve Guide
Supply Only of Valve seat Inlet/Exhaust
F.I.P Calbiration, cleaning and repair Job (62.5/ 50 kVA DG Set)
Injector Nozzel
Supply Only of Began
Supply Only of Linear
Supply Only of Piston
Supply Only of Ring Set
Supply Only of Main Began Bearing
Supply Only of Connecting Rod Bush
Supply Only of Cylinder Rubber Kit
Supply Only of Hose Kit
Supply Only of Benjo
Supply Only of Non Return Valve (NRV)
Supply Only of Fevibond/ epoxy/ cyanoacrylate, as required for complete overhaul of the DG Set
Supply Only of Battery Charger (smart, fast charging type, with both DC and AC inputs)
Supply Only of Battery Terminals
Supply Only of Head Guide
Supply Only of Water Pump
Dynamo Repair Job
Self Starter Repair Job
Supply Only of Starter Switch 24v
Supply Only of Feed Pump
Supply Only of AVR
Supply Only of Head Gasket
Supply Only of Belt Small
Supply Only of Belt Large
Supply Only of Rocker Set/ assembly
Supply Only of Turbo Drain Pipe
Supply Only of Packing Kit, complete for the overhaul
Supply Only of Fuel Pipe
Supply Only of House Connection
Supply Only of Copper Washers
Connecting Rod alignment Job, including any stores required for renewal
Supply Only of Connecting Rod
Transportation required to work site and back/ for shifting of DG Set from one location to another
M&L for Overhaul of DG Set to include disconnecting, taking out and opening of DG set, head job of 15 KVA gen set etc and reassembling the DG set after repair/renewal of unserviceable parts of DG set, any machining works (such as grinding, milling, Lathe and other jobs), any other job to make the DG Set operational and testing complete all as specified and directed. (The DG Set shall be provided with an all inclusive warranty period of 365 days (of running time) from the date of making the DG set operational. Any off road period during this warranty time will sufficiently enhance the warranty duration) Note :- Cost of spares/ parts/ jobs mentioned below will be measured and paid seprately as supply only under respective items mentioned here-in-below. However other minor consumables, spares and jobs are included.
Head facing/Grinding Job
Supply Only of Inlet/Exhaust Valve
Supply Only of Oil Valve Seal
Supply Only of Valve Spring
Supply Only of Valve Guide
Supply Only of Valve seat Inlet/Exhaust
F.I.P Calbiration, cleaning and repair Job (15 kVA DG Set)
Injector Nozzel
Supply Only of Began
Supply Only of Linear
Supply Only of Piston
Supply Only of Ring Set
Supply Only of Main Began Bearing
Supply Only of Connecting Rod Bush
Supply Only of Cylinder Rubber Kit
Supply Only of Hose Kit
Supply Only of Benjo
Supply Only of Non Return Valve (NRV)
Supply Only of Fevibond/ epoxy/ cyanoacrylate, as required for complete overhaul of the DG Set
Supply Only of Battery Charger (smart, fast charging type, with both DC and AC inputs)
Supply Only of Battery Terminals
Supply Only of Head Guide
Supply Only of Water Pump
Dynamo Repair Job
Self Starter Repair Job
Supply Only of Starter Switch 24v
Supply Only of Feed Pump
Supply Only of AVR
Supply Only of Head Gasket
Supply Only of Belt Small
Supply Only of Belt Large
Supply Only of Rocker Set/ assembly
Supply Only of Turbo Drain Pipe
Supply Only of Packing Kit, complete for the overhaul
Supply Only of Fuel Pipe
Supply Only of House Connection
Supply Only of Copper Washers
Connecting Rod alignment Job, including any stores required for renewal
Supply Only of Connecting Rod
Transportation required to work site and back/ for shifting of DG Set from one location to another
Taking down the radiator complete of 15 to 250 KVA DG set from its mounting and descaling the same including cleaning from top and bottom of the tank and brazing re-soldering complete tank and re-installing the same to its original position all as directed by Engr-in-Charge.
Repair / Complete Overhaul to self starter assembly of DG set of capacity of 82.5 to 250 KVA by cutting of old burnt winding with new copper winding wire as per existing size/ guage including insulation materials, varnishing and heating/ drying up jobs etc complete all as specified and directed.
Repair / Complete Overhaul to self starter assembly of DG set of capacity of 15 to 82.5 KVA by cutting of old burnt winding with new copper winding wire as per existing size/ guage including insulation materials, varnishing and heating/ drying up jobs etc complete all as specified and directed.
Supply and Fixing in renewal TurboCharger complete for DG Set of Capacity of 15 kVA to 250 kVA, including removal of old Turbo Charger, along with all connected Jobs and accessories, complete all as specified, clarified and directed by engineer in charge
Supply and fixing in renewal of off load changeover switch AC, 4 pole, 415 volt upto 320 AMP complete all as specified and directed by Engr-in- Charge.
Supply and fix in renewal of off load changeover switch AC, 4 pole, 415 volt upto 200 AMP complete all as specified and directed Engr-in- Charge.
S&F battery lead wire as per existing size and length, flexible copper conductor single core including taking out old unserviceable battery lead wire complete all as specified and directed by Engr-in-Charge.
S&F battery terminal brass complete with GI nuts & bolts including taking out old unserviceable battery terminal brass complete all as specified and directed Engr-in-Charge.
Repair/renewal of worn out parts of FIP, calibration and testing of fuel pump of 125 to 250 KVA DG set and testing on test bench and renewal of pump element, delivery valve, ball bearing and adjustment of injectors and setting of fuel pressure as per manufacturer instructions complete all as directed by the Engr-in-charge.
Repair / renewal of worn out parts of FIP, calibration and testing of fuel pump of 15 KVA to 125 KVA DG set and testing on test bench and renewal of pump element, delivery valve, ball bearing and adjustment of injectors and setting of fuel pressure as per manufacturer instructions complete all as directed by the Engr-in-charge.
Supply only distilled water for battery top up in one/ five litre packaging complete all as specified and directed by Engineer in charge
Supply Only lead acid battery 12 volt 150 AH with suitable 'C' Rating for use in DG set of capacity upto 250 kVA (or other equipment such as VCBs, etc), with minimum warranty of 36 months (of all inclusive renewal warranty - any pro rata warranty shall be over and above this 36 months warranty), all as specified and defined by Engineer in Charge, of Make: Exide / Amaron/ Luminous
Supply Only Engine oil of recommended grade 15W40, in sealed containers (containers are to be left in MES) complete all as specified and directed by engineer in charge.
Supply Only Engine Coolent in sealed containers (containers are to be left in MES) complete all as specified and directed by Engineer-in-charge.
Supply Only Engine Oil Filter Suitable for up to 62.5 to 250 KVA DG Set complete all as specifed and directed by Engineer-in-Charge
Supply Only Engine Oil Filter Suitable for 15 to125 KVA DG Set complete all as specifed and directed by Engineer-in-Charge
Supply and fix alumimium lugs of size 50 mm sqmm complete all as specified and directed.
Supply and fix alumimium lugs of size 70 mm sqmm complete all as specified and directed.
Supply and fix alumimium lugs of size 120 mm sqmm complete all as specified and directed.
Supply and fix alumimium lugs of size185 mm sqmm complete all as specified and directed.
Supply and fix alumimium lugs of size 240 mm sqmm complete all as specified and directed.
M & L for earthing complete with galvanised steel plate earth electrode 600 mm X 600 mm X 6 mm thick, buried directly in ground (earth pit not less than 2.25 metres deep below ground level) with top edge of the plate not less than 1.5 metres below normal ground level, connected to earthing lead of 32 mm X 6 mm galvanised mild steel strip by means of bolts, nuts, check nuts and washers of galvanised iron from earth plate to test point upto 7.5 metre including all as shown in electrical plate No. 3 of SSR Part I (2009) including necessary concrete chamber in cement concrete M15 (Nominal Mix) using 20 mm nominal size coarse aggregate, precast RCC cover slab in cement concrete M15 (Nominal mix) using 20 mm nominal size coarse aggregate of size 40 cm X 40 cm X 5 cm reinforced with 8 mm dia TMT bars @ 150 mm c/c both ways with one handle for lifting made out of 8 mm dia bar, GI funnel, GI wire mesh filter, 20 mm dia GI pipe medium grade for watering, 40 mm dia GI pipe medium grade for protection of earthing lead, charcoal or coke and salt in alternate layers including necessary excavation and earth work in any type of soil/ strata and testing complete all as specified and as directed by the Engineer-in-charge.
m/s mohd saleem and co (BID ID -3162559)
M/S GHULAM RASOOL LONE (BID ID -3153117)
M/S Sky Engineers (BID ID -3162706)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .