Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.4 LAccepted-Finance | ₹8.4 L | L1 | Accepted-Finance Found L1 |
| 2 | L2₹13.8 L+₹5.4 L (63.6%)Accepted-Finance | ₹13.8 L+₹5.4 L (63.6%) | L2 | Accepted-Finance Found L2 |
Tender Value
₹11.5 L
EMD Value
₹23,002
Closing Date
6 Feb 2020, 4:00 pmClosed
OFFICER INCHARGE
AAI, ACS, BELLARY-583104.
Execution of Armoured 12F Single mode OFC Cable laying work and Fiber termination to a Wall Mounted Cabinet for FTI Purpose at ACS Bellary
2020_AAI_41234_1
AAI/CNS/BI/FTI/OFC/TENDER/2020
Open Tender
OFC Laying Works
Works
42 days
AAI ACS BELLARY
Please refer Tender documents.
11 documents required · 11 mandatory
₹590
Yes
AIRPORTS AUTHORITY OF INDIA
₹23,002
14 Feb 2020
25 Jan 2020
7 Feb 2020
25 Jan 2020
6 Feb 2020
25 Jan 2020
25 Jan 2020 - 5 Feb 2020
Amount
Execution of Armoured 12F Single mode OFC Cable laying work and Fiber termination to a Wall Mounted Cabinet for FTI Purpose - Works
Laying of underground armoured 12 Core, Single Mode (SM) OFC Cable from FTI room to RCAG site through 1.5 feet width and 4 feet depth trench and HDPE conduit (3 inch diameter) on either side of the road. 1. The trench has to be prepared with first layer of bricks, will put HDPE pipe, then second layer will be bricks, will put high visibility Ribbon tape, final layer with soft sand. 2. HDPE pipe and GI pipe environmentally sealed properly where ever laid.3. Three mm Continuous guide wire without joints within/inside GI and HDPE pipes for laying /Pulling cables. 4. Routing Diagram is attached for reference.
Laying a high-visibility tape/ribbon marked with a warning 1.5 feet above the cable.
Fixing of GI Conduit 6” dia. About 3 mm thickness and 6m length to cross the culvert along the laying path. While crossing Culverts GI Pipe should be placed at suitable height by constructing two plinths (Cement) on both sides of crossing culvert to support GI pipe, total- 8 Cement Plinths.
16SWG GI sheet Route Markers shall be erected in the shape of a Flag of size 10 inch X 6 inch to be marked as “FTI OFC”. The flag will be on a 3 feet iron rod out of which 1.5 feet will be embedded in the ground at an interval of 100 meters and at any turning in the path of OFC cable
Laid OFC cable fibers 12F are to be spliced & terminated with LC connectors (LC 100base LX single mode) in a wall mounted Optical termination box metallic type at each location. Total- 6 OTBs 1. Proper attention has to be provided for routing of tubes and drop/patch cable 2. Bend radius maintenance at all points 3. Key to prevent un authorized access 4. Cable and FRP holding options 5.FTTx application 6. Sample wall mounted Optical termination box attached for reference.
Manhole Chambers Digging & Construction of brick chamber with MS top cover along with handle, of size 2mx2mxl.8m depth
Back Filling and Dressing of the Trench with excavated soft earth sand
Testing: Providing a performance report on each fiber core in the bundle at the time of completion. The testing device used to provide this data is the OTDR. The signal loss of each Core shall be 0.5 dB per kilometer or less (1310nm). Each splice (such as between the fiber and the LC connector can be expected to incur additional signal loss of .3 dB or less. The higher Signal loss readings may indicate that the fiber installation has severe bends, which can’t be accepted. The contractor has to ensure to rectify abnormal signal losses at his own cost, efforts and without any time delay.
Execution of Armoured 12F Single mode OFC Cable laying work and Fiber termination to a Wall Mounted Cabinet for FTI Purpose - Connectivity Devices
Supply of Wall mounted Optical termination box metallic type at each location. OFC cable fibers 12F, SM are to be spliced & terminated with LC connectors (type LC 100base LX single mode connector) panel. Diagram attached.
LC Type Patch Cables, Single Mode
HDPE DUCT Pipe (3 inch diameter)
High-visibility tape/ribbon marked with a warning over the cable.
GI Sheet OFC Route markers with Name “FTI OFC”(Yellow Painted)
GI Pipe 6 “ Dia
Cement plinths of Size 0.5X0.5XH(LXBXH in meters)
Rigid PVC Pipe 3” Dia
Manhole Chambers-- construction of brick chamber with MS top cover along with handle, of size 2mx2mxl.8m depth
M S Construction
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .