Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 LAdmitted-Fee/PreQual/Technical/Finance | ₹3.2 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹3.2 L+₹4,427.19 (1.38%)Admitted-Fee/PreQual/Technical/Finance | ₹3.2 L+₹4,427.19 (1.38%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹3.4 L+₹19,496.85 (6.10%)Admitted-Fee/PreQual/Technical/Finance | ₹3.4 L+₹19,496.85 (6.10%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹3.5 L+₹25,595.44 (8.00%)Admitted-Fee/PreQual/Technical/Finance | ₹3.5 L+₹25,595.44 (8.00%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | G VISHNU L4 | DEEPAM CONSTRUCTION L3 | V SUBRAMANIA PILLAI WORKS CONTRACTOR L2 | S KAIGIN RAJ L1 |
|---|---|---|---|---|---|---|---|
| 1.00Construction of MINI CSC Toilet building at Kurunthencode near Segregation shed in Kurunthencode Village Panchayat in Kurunthancode Panchayat Union | |||||||
| 1.01 | Earth work excavation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard red earth,shales, murrams, gravel,hard rock not requiring blasting etc., complete.,SS 20 B | 8.31 | cum | 224.71 ₹1,867.34 | 220.26 ₹1,830.36 | 210.89 ₹1,752.5 | 197.22 ₹1,638.9 Lowest |
| 1.02 | Cement concrete 1:4:8 mix using 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc., complete. | 2.94 | cum | 4,529.57 ₹13,316.94 | 4,449.63 ₹13,081.91 | 4,235.01 ₹12,450.93 | 4,036.18 ₹11,866.37 Lowest |
| 1.03 | Random Rubble masonry in CM 1:5 foundation and basement including simultaneously flush etc. complete. | 8.68 | cum | 4,845.59 ₹42,059.72 | 4,760.08 ₹41,317.49 | 4,530.56 ₹39,325.26 | 4,375.38 ₹37,978.3 Lowest |
| 1.04 | Refilling the basement with excavated earth etc etc., complete complying with standard specifiction. | 2.71 | cum | 38.97 ₹105.61 | 38.28 ₹103.74 | 36.66 ₹99.35 | 34.28 ₹92.9 Lowest |
| 1.05 | Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications | 0.77 | cum | 1,466.39 ₹1,129.12 | 1,440.51 ₹1,109.19 | 1,360.41 ₹1,047.52 | 1,194.82 ₹920.01 Lowest |
| 1.06Supplying and erection centering for sides and soffits including necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam column,sunshade etc., complete. | |||||||
| 1.07 | Upto Plinth Beam | 5.16 | sqm | 465.38 ₹2,401.36 | 457.16 ₹2,358.95 | 437.73 ₹2,258.69 | 413.2 ₹2,132.11 Lowest |
| 1.08 | Above Plinth Beam | 10.03 | sqm | 930.75 ₹9,335.42 | 914.33 ₹9,170.73 | 875.45 ₹8,780.76 | 826.4 ₹8,288.79 Lowest |
| 1.09 | R.C.C 1:11/2:3 using 20mm metal for all RCC works including curing and providing fixtures like fan clamps in the RCC roof wherever necessary and bearing curfaces of walls sides and bottom at slabs etc. as directed by the departmental officers complete | 2.21 | sqm | 7,693.01 ₹17,001.55 | 7,557.25 ₹16,701.52 | 7,210.51 ₹15,935.23 | 7,062.74 ₹15,608.66 Lowest |
Tender Value
₹4.8 L
EMD Value
₹4,830
Closing Date
27 Jul 2026, 3:00 pmClosed
Block Development Office V.pt, Kurunthencode
Block Development Officer V.pt, Kurunthencode
Construction of MINI CSC Toilet building at Kurunthencode near Segregation shed in Kurunthencode Village Panchayat in Kurunthancode Panchayat Union
2026_RDTN_683290_1
Construction of MINI CSC Toilet building at Kurunthencode near Segregation shed in Kurunthencode
Open Tender
Civil Works
Works
Kurunthencode V.pt
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹4,830
Yes
27 Jul 2026
30 Jun 2026
27 Jul 2026
30 Jun 2026
27 Jul 2026
13 Jul 2026
30 Jun 2026 - 8 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Construction of MINI CSC Toilet building at Kurunthencode near Segregation shed in Kurunthencode Village Panchayat in Kurunthancode Panchayat Union | |||||
| 1.01 | Earth work excavation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard red earth,shales, murrams, gravel,hard rock not requiring blasting etc., complete.,SS 20 B | 8.31 | cum | 263.78 | ₹2,192.01 |
| 1.02 | Cement concrete 1:4:8 mix using 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc., complete. | 2.94 | cum | 5,297.07 | ₹15,573.39 |
| 1.03 | Random Rubble masonry in CM 1:5 foundation and basement including simultaneously flush etc. complete. | 8.68 | cum | 5,666.74 | ₹49,187.3 |
| 1.04 | Refilling the basement with excavated earth etc etc., complete complying with standard specifiction. | 2.71 | cum | 45.85 | ₹124.25 |
| 1.05 | Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications | 0.77 | cum | 1,701.58 | ₹1,310.22 |
| 1.06 | Supplying and erection centering for sides and soffits including necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam column,sunshade etc., complete. | - | - | - | - |
| 1.07 | Upto Plinth Beam | 5.16 | sqm | 547.5 | ₹2,825.1 |
| 1.08 | Above Plinth Beam | 10.03 | sqm | 1,095 | ₹10,982.85 |
| 1.09 | R.C.C 1:11/2:3 using 20mm metal for all RCC works including curing and providing fixtures like fan clamps in the RCC roof wherever necessary and bearing curfaces of walls sides and bottom at slabs etc. as directed by the departmental officers complete | 2.21 | sqm | 9,018.77 | ₹19,931.48 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.93 MB
BOQ_821355.xls
BOQ • 0.36 MB
Mikur.pdf
Tender Documents • 0.72 MB
290.pdf
PDF • 0.12 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .