Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.1 LAccepted-Finance NO 5 8TH STREET KALAINGAR NAGAR THIRUVOTTIYUR CHENNAI 600 019 | THIRUVALLUR | TAMIL NADU | 600019 | ₹30.1 L | L1 | Accepted-Finance Lowest |
| 2 | Rejected-Technical | - | - | Rejected-Technical EMD and BQR condition are not satisfied |
| Sl No | Description | Qty | Unit | KR CONTRACTOR L1 |
|---|---|---|---|---|
| 1.00 | Removal of settled ash /Clinker in Unit-II & III Common trench from Bottom Ash hopper to Ash Handling Pump House and interconnection tunnel between Unit-III & II by hammering and feeding the ash slurry into the trenches including consumables & T&P’s. | 400 | Opns | 2,682.12 ₹12.7 L |
| 2.00 | Filling in ash bags, stacking the ash bags inside the interconnection tunnel between unit-II and Unit-III at the entry of the trench and providing dummy plate, dewatering of slurry sump with the help of centrifugal mono block pump for carrying out the removal of wet ash deposit in the trenches including consumable and T&P’s. | 2 | Opns | 1,18,945.43 ₹2.8 L |
| 3.00 | Taking out the stacked ash bags in the ash slurry trenches after completion of work and changing the ash slurry including Consumables and T&P’s. | 2 | Opns | 7,805.34 ₹18,420.60 |
| 4.00 | Removal of Spreaded and accumulated ash at Surge hopper silo area to Opposite to Administrative Building/NCTPS-I area including T&P’s. | 4,800 | MT | 254.64 ₹14.4 L |
Tender Value
Refer Docs
EMD Value
₹26,700
Closing Date
9 Jan 2026, 2:00 pmClosed
CE/NCTPS-I
CE/NCTPS-I
Removal of settled ash Clinker in Unit II III Common trench from Bottom ash hopper to Ash Handling Pump House and interconnection tunnel
2026_EB_639029_1
CE/NCTPSI/SE/MII/SpNo131/25-26
Open Tender
Power/Energy Projects/Products
60 days
NCTPS Chennai
refer to tender document
3 documents required · 3 mandatory
₹0
₹26,700
Yes
20 Feb 2026
3 Jan 2026
12 Jan 2026
3 Jan 2026
9 Jan 2026
3 Jan 2026
Removal of settled ash /Clinker in Unit-II & III Common trench from Bottom Ash hopper to Ash Handling Pump House and interconnection tunnel between Unit-III & II by hammering and feeding the ash slurry into the trenches including consumables & T&P’s.
Filling in ash bags, stacking the ash bags inside the interconnection tunnel between unit-II and Unit-III at the entry of the trench and providing dummy plate, dewatering of slurry sump with the help of centrifugal mono block pump for carrying out the removal of wet ash deposit in the trenches including consumable and T&P’s.
Taking out the stacked ash bags in the ash slurry trenches after completion of work and changing the ash slurry including Consumables and T&P’s.
Removal of Spreaded and accumulated ash at Surge hopper silo area to Opposite to Administrative Building/NCTPS-I area including T&P’s.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.67 MB
BOQ_764831.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid