| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹37.4 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹42.8 L+₹5.5 L (14.7%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹43.9 L+₹6.5 L (17.5%)Rejected-AOC NO 68 ANJANEYA TEMPLE CROSS OPP M S RAMAIAH HOSPITAL NEW BEL ROAD BANGALORE 560 094 | BENGALURU URBAN | KARNATAKA | 560094 | L3 | Rejected-AOC L3 | |
| 4 | L4₹44.0 L+₹6.6 L (17.8%)Rejected-AOC | L4 | Rejected-AOC L4 | |
| 5 | L5₹45.9 L+₹8.6 L (23.0%)Rejected-AOC NO S 7 2ND CROSS 2ND MAIN KEB LAYOUT SANJAYANAGAR BANGALORE 560094 | BENGALURU URBAN | KARNATAKA | 560094 | L5 | Rejected-AOC L5 |
Tender Value
Refer Docs
EMD Value
₹89,580
Closing Date
28 Sept 2020, 6:00 pmClosed
GE (AF) Yelahanka
GE (AF) Yelahanka Bangalore - 63
OUTSOURCING FOR M AND O OF ELECTRIC SUPPLY INSTALLATION IN TECHNICAL AND DOMESTIC AREA AND LIFT AT SRE AT AFS YELAHANKA
2020_MES_360536_3
8801/E8
Open Tender
Civil Works
Item Rate
330 days
AFS Yelahanka
As per NIT
9 documents required · 9 mandatory
₹500
GE (AF) Yelahanka
₹89,580
Yes
22 Dec 2020
12 Sept 2020
30 Sept 2020
12 Sept 2020
28 Sept 2020
13 Sept 2020
Amount
Out sourcing for maintenance and operation of Main Receiving Station (MRS), HT 11 KV with 11 KV VCB Panels, incoming & outgoing, battery bank, metering cubicle, HT 2 Pole/4 Pole structure with accessories, transformer etc including maintaining of hourly reading for HT panel and metering cubicle, BESCOM breakdown register and shall have liason with BESCOM etc all as applicable in three shifts per day round the clock each shift not exceeding 08 hours per day ( one electrician per shift) on all week days including Sundays and holidays all as specified and directed by Engineer-in-Charge.
Out sourcing for maintenance and operation of MAFI SUB STATION 1 HT 11 KV with 11 KV VCB panels of consisting of 02 VCB INCOMER, 02 VCB out going, 02 VCB Buscoupler, power pack with accessories, Transformer/Isolation Transformer / Voltage Stabilizer's of 630 KVA, ACB panel consisting 03 ACBS incomer, 01 ACB Outgoing, 01 ACB Spare, LT Panels, 01 ACB incomer, 02 ACB/MCCB's as outgoing etc including maintaining of break/shutdown registers for HT panel etc all as applicable in three shifts per day round the clock each shift not exceeding 08 hours per day (one Electrician per shift) on all days including sundays and holidays all as specified and directed by Engineer-in-Charge
Out sourcing for maintenance and operation of MAFI SUB STATION 2 alone with 11 KV VCB panels of consisting of 02 VCB INCOMMER. 02 VCB out going, 02 VCB Buscoupler, power pack with accessories, Transformer/Isolation Transformer / Voltage Stabilizer's of 200 KVA including of diesel Engine generating set 200KVA capacity of kirloskar make at and LT panel etc including maintaining of break/shutdown registers for HT panel etc all as applicable in three shifts per day round the clock each shift not exceeding 08 hours per day (one Electricial per shift) on all days including sundays and holidays all as specified and directed by Engineer-in-Charge
Out sourcing for maintenance and operation of Main Receiving Station (MRS domestic area), HT 11 KV with 11 KV VCB Panels, incoming & outgoing, HT 2 Pole/4 Pole structure RMUs & VCB with accessories, transformer etc at domestic Area including maintaining of HT panel etc all as applicable in two shifts per day round the clock each shift not exceeding 08 hours per day ( one electrician per shift) on all week days including Sundays and holidays all as specified and directed by Engineer-in-Charge.
Out sourcing for Manning and operation of 900 Kg (10 Persons) lift at SRE building 01 Nos) one shift per day on all week days including sundays and holidays not exceeding 8 hrs (ONE Semi Skilled/Shift) a day and maintaining all the relevant records on required basis all as specified and as directed by the Engr-in-Charge.
Note for Sl item No:1 to 5 (i) The operator employed by the contractor shall be of proper trade i.e Govt ITI qualified / trained under vocational training programme of state Govt / having minimum of 4 years experience in the similar type of work. (ii) The contractor shall take over the installations from the department alongwith serviceability state of plant details of the installation in writing one day before starting the contract. (iii)The shift Operator shall not leave the installation without handing over to the next shift operator. (iv)The contractor shall provide stationeries like log book,pen, pencil,cotton waste and conveyance for tradesmen and any other items required for day to day work. (v)The operator should clean the installations and installation area on everyday. If the operator fails to clean the installations and surrounding area, penalty of Rs 100/- day will be deducted from the contracted amount. (vi)Necessary log book entries shall be maintained by the operator in each shift. Necessary handing taking over details between the shift operator shall also reflected in the logbooks.
Thirumala Construction
RAMESH BABU CO
Power and Telecom Systems
devan enterprises
M/S Sneha Enterprises
UNIVERSAL ENGINEERING
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .