Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
₹7.8 L
Closing Date
5 Aug 2021, 6:55 pmClosed
Executive Engineer REW Div. Poonch
Office of the Executive Engineer REW Div. Poonch
Please refer to BOQ
2021_RDPR_131592_1
e-NIT No. 30 of REW Poonch dated 23-07-2021
Open Tender
Civil Works
Item Rate
40 days
Mangnar
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Yes
Executive Engineer REW Div. Poonch
Exempted
27 Sept 2021
24 Jul 2021
7 Aug 2021
24 Jul 2021
5 Aug 2021
24 Jul 2021
Amount
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil :
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size)
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) 20% boulders
Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
Providing wood work in frames of doors, windows, clerestory windows andother frames, wrought framed and fixed in position with hold fast lugs or withdash fasteners of required dia and length (hold fast lugs or with dash fastenersshall be paid for separately):Sal wood
Providing 40x5 mm flat iron hold fast 40 cm long including fixing to frame with10 mm diameter bolts, nuts and wooden plugs and embeddings in cementconcrete block 30x10x15 cm 1:3:6 mix ( 1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size).
Brick work with common burnt clay (non-modular) bricks of class designation 7.5 infoundation and plinth including curing in : Cement mortar 1:6 ( 1 cement : 6 coarse sand)
Reinforced cement concrete work in walls (any thickness) including attached pilasters,buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts andstruts upto floor five level including curing but excluding cost of centering shuttering,finishing and reinforcement. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in Cold twisted bars
Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
Centering and shuttering including strutting, propping etc. and removal of form for: Lintel, beams, plinth beams, girders, bressumers and cantilevers
Centering and shuttering including strutting, propping etc. and removal of form for: Columns, pillars, piers, abutments, posts and struts.
Centering and shuttering including strutting, propping etc. and removal of form work for: Suspended floors, roofs, landings, balconies and access platforms.
Centering and shuttering including strutting, propping etc. and removal of form work for: Edges of slabs and breaks in floors and walls Under 20 cm wide
Smooth finishing of the exposed surface of RCC work with 6mm thick cement mortar 1:3 (1 cement: 3 fine sand) including curing.
15mm Cement plaster of mix: 1 : 6 ( 1 cement : 6 fine sand
Providing and fixing panelling or panelling and glazing in panelled or panelledand glazed shutters for doors, windows and clerestory windows (Area ofopening for panel inserts excluding portion inside grooves or rebates to be measured). Panelling for panelled or panelled and glazed shutters 25 mm to 40mm thick. First Class kail wood
Providing and fixing glazed shutters for doors, windows and clerestory windowsusing 4mm thick float glass panes including ISI marked M.S. pressed butthinges bright finished of required size with necessary screws. First class kail wood
Providing and fixing glass panes with putty and glazing clips in steel doors,windows, clerestory windows, all complete with : 4.0mm thick glass panes
Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete. 50mm thick with 20 mm nominal size stone aggregate.
Applying priming coat: With ready mixed pink or grey primer of approved brand and manufacture on wood work (hard and soft wood
White washing with lime to give an even shade on New Work (three or more coats)
Finishing walls with water proofing cement paint of required shade on New work (two or more coats applied @ 3.84 kg/10sqm
Carriage of material loading/unloading & stacking complete
Sand and stone agg. Below 40mm nominal size 10 Km by MT & 1000 Mtr by HL
brick 200 KM by MT and 1km by HL
cement by MT 10 km HL 1km
steel MT 10 km and HL 1km
Stone 200 Mtr by HL
YASAR ARFAT
JAVID YOUSAF KHAN
FAQ1R AHMED
MAHROOF AHMED
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .