Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 LAccepted-AOC | ₹5.0 L | L1 | Accepted-AOC First Lowest |
| 2 | L2₹5.0 LRejected-AOC | ₹5.0 L | L2 | Rejected-AOC Second Lowest |
| 3 | L3₹5.1 LRejected-AOC GRAM PO DUDHI SONBHADRA U P | ₹5.1 L | L3 | Rejected-AOC Third Lowest |
| 4 | L4₹5.6 LRejected-AOC | ₹5.6 L | L4 | Rejected-AOC Fourth Lowest |
| Sl No | Description | Qty | Unit | BABALU CONSTRUCTION L1 | PANKAJ KUMAR GUPTA L3 | D & D CONSTRUCTION COMPANY L4 | M/s Akbar Husain L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation of foundation treches in clay soil including lift 1.5m and lead upto 30m from trench as per direction by Engineer in charge. | 30.69 | M3 | 80 ₹2,455.20 | 90 ₹2,762.10 | 80 ₹2,455.20 | 85 ₹2,608.65 |
| 2.00 | Shuttering work for cement concrete including cost of all materials, labour, T&P etc. required for proper completion of work. | 26.69 | M2 | 100 ₹2,669 | 105 ₹2,802.45 | 205 ₹5,471.45 | 110 ₹2,935.90 |
| 3.00 | Providing and laying of P.C.C.(1:2:4) with cement and coarse sand F.M.>2.0 crushed hard dalla stone grit 20 to 40mm. size including cost of all materials, labour, T&P etc. but excluding cost of reinforcement required for proper completion of work. | 26.69 | M3 | 3,900 ₹1.0 L | 3,700 ₹98,753 | 6,300 ₹1.7 L | 3,500 ₹93,415 |
| 4.00 | Shuttering work for rainforcement cement concrete including cost of all materials, labour, T&P etc. required for proper completion of work. | 26.69 | M2 | 100 ₹2,669 | 105 ₹2,802.45 | 335 ₹8,941.15 | 100 ₹2,669 |
| 5.00 | Carriage, cutting, Bending and placing steel for reinforcement with cost of binding wire including cost of all materials, labour, T&P etc. required for proper completion of work. | 2.67 | MT | 50,000 ₹1.3 L | 57,000 ₹1.5 L | 6,000 ₹16,020 | 56,000 ₹1.5 L |
| 6.00 | Providing and laying of R.C.C.(1:1.5:3) with cement and coarse sand F.M.>2.0 crushed hard dalla stone grit 4.72 to 20mm. size including cost of all materials, labour, T&P etc. but excluding cost of reinforcement required for proper completion of work. | 26.69 | M3 | 4,800 ₹1.3 L | 5,200 ₹1.4 L | 7,200 ₹1.9 L | 4,800 ₹1.3 L |
| 7.00 | R.R. stone masonry in 1:4 cement mortar with cement, course sand F.M>2.0 & stone boulder including cost of breaking stone boulder, all materials, labour, T&P etc. required for proper completion of work. | 22.07 | M3 | 4,500 ₹99,315 | 4,000 ₹88,280 | 5,400 ₹1.2 L | 4,500 ₹99,315 |
| 8.00 | Cement plastering in 1:4 with cement and cours sand on stone masonry including cost of all materials, labour, T&P etc. required for proper completion of work. | 247.88 | M2 | 100 ₹24,788 | 115 ₹28,506.20 | 190 ₹47,097.20 | 100 ₹24,788 |
Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
31 Mar 2026, 5:00 pmClosed
Executive Engineer
Office of the EE KCD3 Pipri
Construction of stone masonary stair on D/S slope of right flank at ch. km. 2.200 of Kanhar Dam at Amwar.
2026_UPIDC_1127065_1
01/EE/2025-26
Open Tender
Civil Works
90 days
Amwar Duddhi Sonbhadra
Please refer tender document
2 documents required · 2 mandatory
₹225
₹20,000
13 May 2026
18 Mar 2026
2 Apr 2026
18 Mar 2026
31 Mar 2026
18 Mar 2026
Earth work excavation of foundation treches in clay soil including lift 1.5m and lead upto 30m from trench as per direction by Engineer in charge.
Shuttering work for cement concrete including cost of all materials, labour, T&P etc. required for proper completion of work.
Providing and laying of P.C.C.(1:2:4) with cement and coarse sand F.M.>2.0 crushed hard dalla stone grit 20 to 40mm. size including cost of all materials, labour, T&P etc. but excluding cost of reinforcement required for proper completion of work.
Shuttering work for rainforcement cement concrete including cost of all materials, labour, T&P etc. required for proper completion of work.
Carriage, cutting, Bending and placing steel for reinforcement with cost of binding wire including cost of all materials, labour, T&P etc. required for proper completion of work.
Providing and laying of R.C.C.(1:1.5:3) with cement and coarse sand F.M.>2.0 crushed hard dalla stone grit 4.72 to 20mm. size including cost of all materials, labour, T&P etc. but excluding cost of reinforcement required for proper completion of work.
R.R. stone masonry in 1:4 cement mortar with cement, course sand F.M>2.0 & stone boulder including cost of breaking stone boulder, all materials, labour, T&P etc. required for proper completion of work.
Cement plastering in 1:4 with cement and cours sand on stone masonry including cost of all materials, labour, T&P etc. required for proper completion of work.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.78 MB
BOQ_2102081.xls
BOQ • 0.32 MB
TenderDocumentRightSideStair.pdf
Tender Documents • 4.80 MB
Download all tender documents and submit your bid