Loading…
Loading…
Tender Value
₹47.3 L
EMD Value
₹94,600
Closing Date
1 Jul 2026, 10:30 amClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
45 days
Expenditure
Revenue
HQ
6 conditions · 2 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
As per Part I Offer Letter, Part II General Instructions to tenderer and Tender Conditions & Annexures-Attached
Annual Maintenance shut-down of wheel shop equipments for 2026-27 (MWFPS) - Group-9-cleaning machine - 1&2, peening machine 1&2 and WFPS conveyors.
RWF-M-OT-MWFPS-2026-27-25
RWF-M-OT-MWFPS-2026-27-25
Open
Works - General
12 Months
Bengaluru Urban, Karnataka
₹0
₹94,600
1 Jul 2026
9 Jun 2026
17 Jun 2026
12 items across 5 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | 1.00 | — | — | ||
| 1. Gas cut & removal of guide rails, support angles & bottom rails at all the 3 chambers. (entry, blast and exist) -3 Set 2. Removal of work rotator shafts and bearings (drive and idler), ejector arm, shafts, bearings & cylinders. -01 Unit 3. Removal of all wear plates of blasting, exit and entry chamber & removal of inspection, entry and exit doors & cylinders. -05 Unit 4. Dismantling of three roto units & metering gate assembly. -3 Unit 5. Dismantling of bucket elevator belt assembly, top pulley, boot pulley & bearings. -01 Unit 6. Removal of scalping drum with screw conveyor, flange bearings, sprockets & chain -01 Set 7. Repair / servicing and fitment of scalping drum with screw conveyor, new flange bearings, sprockets & new chain. -01 Set 8. Repair to roto chambers & replacement of damaged wear plates. -3 Unit 9. Repair of machine shell body (entry, blast & exit chamber)- 03 Unit 10. Fitment of Main rails, guide rails & align with proper support of guide angles. (Rails to be fabricated with 25 mm manganese plate & guide angles fabricated by 10 mm manganese plate) -3 set 11. Fitment of wear plates of blasting, exit and entry chamber with proper bolting systems. -03 Set 12. Fitment of serviced roto units, serviced/new metering gate assembly and connect steel shots feeding hoses to metering gates & rotos with proper clamping. -3 Unit 13. Fabrication & fitment of steel shots feeding square & round tubes from screw conveyor to roto units. Fabrication & fitment of dust pipes from screw conveyor to ground / waste bin.- 3 Unit 14. Fabrication & fitment of perforated sheets with 10 mm manganese plate with 10 mm drill/gas cutting holes & provide proper supports (entry, blast & exit chamber)- 03 Unit 15. Fitment of ejector arm along with new shafts, bearings, serviced cylinders & hoses. -01 Unit 16. Fitment of work rotator drive and idler shaft with new bearings with proper alignment and provide cover wear plates. Fitment of Work Rotator gearbox sprocket & coupling with proper alignment. -02 Unit 17. Repairs to Inspection, entry and exit doors, its sealing and replace new hinges & door lock handles.Replacement of entry & exit door I-beam, repair & fitment of serviced door & actuator cylinders & its accessories. -05 Unit 18. Fabrication and replacement of the complete bottom hopper with 12mmm MS plate by ensuring the free flow of the steel shots to the bucket elevator -01 No 19. Fitment of roto, motor pulleys, new V-belts with after proper alignment, tensioning of drive belts & provide mesh cover for belt drive. -03 Unit 20. Repair to damaged bucket elevator shell body. Replacement of bucket elevator rubber belt, damaged buckets, defective Gearbox, elevator top pulley, boot pulley, shaft and bearings. -01 Unit 21. Painting with one coat of apple green paint.- 01 Unit 22. Testing and trial run of the machine with wheels and wheel movements from entry to exit.- 01 Unit 23. Shifting of all removed scrap material to earmarked area.- 02 M.T | — | — | — | Rs. |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
PartIOfferletter.pdf
ATTACHMENT
PartIIInstructionstoTenderers.pdf
ATTACHMENT
PartIIISpecialconditions.pdf
ATTACHMENT
PartIVPricesandpayments.pdf
ATTACHMENT
PartVIAnnexures.pdf
ATTACHMENT
PartVIINITfore-tender.pdf
ATTACHMENT
Part VIII GCC doc
ATTACHMENT
PartVBreakupofratesandschedule_1.pdf Part V Breakup of rates and schedul
ATTACHMENT
GCC_April-2022_merged_compressed.pdf
ATTACHMENT
PartVBreakupofratesandschedule_1.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .