| 1 | L1₹1.4 CrAccepted-AOC 5 217 D1 TEACHERS COLONY MOHANUR ROAD NAMAKKAL 637001 | NAMAKKAL | TAMIL NADU | 637001 | ₹1.4 Cr | L1 | Accepted-AOC Lowest bidder |
| 2 | L2₹1.4 CrRejected-AOC NO 35 DADAGAPATTY SALEM SOUTH TALUK SALEM | SALEM | SALEM | ₹1.4 Cr | L2 | Rejected-AOC Other than lowest bidder |
| 3 | L3₹1.6 CrRejected-AOC 10 243 THURAIYUR MAIN ROAD PONNERI POST NAMAKKAL 637013 | NAMAKKAL | TAMIL NADU | 637013 | ₹1.6 Cr | L3 | Rejected-AOC Highest Bidder |
| Sl No | Description | Qty | Unit | ABIRAMI ENGINEERING CONSTRUCTION AND CO L1 | ASHOK CONSTRUCTION L3 | AADHISHIVAM ENGINEERING CONSTRUCTION LLP L2 |
|---|---|---|---|---|---|---|
| 1.00KORKAI A - BLOCK | ||||||
| 1.10 | Providing Sthapathi Ornamental works on above Terrace Parapet Top border of size 135mm X 100mm by sthapathi the following works to be carried on. To make a above Parapet wall top surface pasting of brick bat by using rich cement mortar. To make a UTTIRAM BORDER, KAMBU BORDER, ELUTHAGA NAVADAI BORDER, TAPPER BORDER with neatly finishing MATTA SUTHAI works by using rich cement mortar with neatly finished. All the above works should be executed as per the detailed drawing furnished by the Heritage conservation Architect and instruction of Executive Engineer, PWD. The rate for the works including Including material charges at site, Labour charges excluding scaffolding charges etc., | 95 | RM | 1,400 ₹1.6 L | 1,600 ₹1.8 L | 1,550 ₹1.7 L |
| 2.00 | Providing Sthapathi Ornamental works on Roof border of size 550mm X 220mm by sthapathi the following works to be carried on. To make a UTTIRAM BORDER,KAMBU BORDER, ELUTHAGA NAVADAI BORDER, TAPPER BORDER with neatly finishing MATTA SUTHAI works by using rich cement mortar with neatly finished. All the above works should be executed as per the detailed drawing furnished by the Heritage conservation Architect and instruction of Executive Engineer, PWD. The rate for the works including Including material charges at site, Labour charges excluding scaffolding charges etc., | 100 | RM | 4,000 ₹4.7 L | 5,500 ₹6.5 L | 4,200 ₹5.0 L |
| 3.00 | Providing Sthapathi Ornamental works on Centre Pillar 1 set- 2 Nos of size 230mm X 900mm by sthapathi the following works to be carried on. To make a above pillar wall surface pasting of brick bat by using rich cement mortar. To make a UTTIRAM BORDER, KAMBU BORDER, ELUTHAGA NAVADAI BORDER, TAPPER BORDER with neatly finishing MATTA SUTHAI works by using rich cement mortar with neatly finished. All the above works should be executed as per the detailed drawing furnished by the Heritage conservation Architect and instruction of Executive Engineer, PWD. The rate for the works including Including material charges at site, Labour charges excluding scaffolding charges etc., | 95 | Nos | 1,150 ₹1.3 L | 1,300 ₹1.5 L | 1,200 ₹1.3 L |
| 4.00 | Providing Sthapathi Ornamental works on First Floor Arch Border of size - 2035mm X 108mm by sthapathi the following works to be carried on. To make a above surface pasting of brick bat by using rich cement mortar. To make a UTTIRAM BORDER, ARCH BORDER, TAPPER BORDER with neatly finishing MATTA SUTHAI works by using rich cement mortar with neatly finished. All the above works should be executed as per the detailed drawing furnished by the Heritage conservation Architect and instruction of Executive Engineer, PWD. The rate for the works including Including material charges at site, Labour charges excluding scaffolding charges etc., | 22 | Nos | 18,100 ₹4.7 L | 20,000 ₹5.2 L | 18,000 ₹4.7 L |
| 5.00 | Providing Sthapathi Ornamental works on First Floor Bottom Border of size - 335mm X 180mm by sthapathi the following works to be carried on. To make a above wall surface pasting of brick bat by using rich cement mortar. To make a UTTIRAM BORDER, ARCH BORDER, TAPPER BORDER with neatly finishing MATTA SUTHAI works by using rich cement mortar with neatly finished. The Above all works asper the direction of Architect drawing given by the departmental officer. All the above works should be executed as per the detailed drawing furnished by the Heritage conservation Architect and instruction of Executive Engineer, PWD. The rate for the works including Including material charges at site, Labour charges excluding scaffolding charges etc., | 100 | RM | 2,200 ₹2.6 L | 2,500 ₹3.0 L | 2,500 ₹3.0 L |
| 6.00 | Providing Sthapathi Ornamental works on Ground Floor Roof Border of size 405mm X 300mm by sthapathi the following works to be carried on. To make a above wall surface pasting of brick bat by using rich cement mortar. To make a URUTTU BORDER, KAMBU KOLUVU BORDER, NAVADAI BORDER, KAMBU BORDER. Pillar Lower portion (ASTAPATHAM) KAMBU BORDER,PATTUMA NAVADAI BORDER with need finishing of MATTA SUTHAI works by using rich cement mortar with neatly finished. All the above works should be executed as per the detailed drawing furnished by the Heritage conservation Architect and instruction of Executive Engineer, PWD. The rate for the works including Including material charges at site, Labour charges excluding scaffolding charges etc., | 150 | RM | 4,000 ₹7.1 L | 4,500 ₹8.0 L | 3,800 ₹6.7 L |
| 7.00 | Providing Sthapathi Ornamental works on First floor Arch of size 50mm X 40mm (1 set) by sthapathi the following works to be carried on. To make a above wall outer surface pasting of brick bat by using rich cement mortar. To make a URUTTU BORDER, KAMBU KOLUVU BORDER, NAVADAI BORDER, KAMBU BORDER. To make a KAMBU BORDER, PATTUMA NAVADAI BORDER with neatly finishing MATTA SUTHAI works by using rich cement mortar with neatly finished. All the above works should be executed as per the detailed drawing furnished by the Heritage conservation Architect and instruction of Executive Engineer, PWD. The rate for the works including Including material charges at site, Labour charges excluding scaffolding charges etc., | 30 | RM | 1,400 ₹49,560 | 1,800 ₹63,720 | 1,550 ₹54,870 |
| 8.00 | Providing Sthapathi Ornamental works on Outer Window above Arch 1 set - 2 Nos in First Floor by sthapathi the following works to be carried on. To make a wall surface pasting of brick bat by using rich cement mortar. To make a URUTTU BORDER, KAMBU KOLUVU BORDER, NAVADAI BORDER, KAMBU BORDER. To make a KAMBU BORDER, PATTUMA NAVADAI BORDER with neatly finishing of MATTA SUTHAI works by using rich cement mortar with neatly finished. All the above works should be executed as per the detailed drawing furnished by the Heritage conservation Architect and instruction of Executive Engineer, PWD. The rate for the works including Including material charges at site, Labour charges excluding scaffolding charges etc., | 22 | Nos | 3,100 ₹80,476 | 3,800 ₹98,648 | 3,350 ₹86,966 |
| 9.00 | Providing Sthapathi Ornamental works on Head Room Roof border of size 900mm X 650mm X 341mm X 112mm by sthapathi the following works to be carried on. To make a above wall top surface pasting of brick bat by using rich cement mortar. To make a URUTTU BORDER, KAMBU KOLUVU BORDER, NAVADAI BORDER, KAMBU BORDER. (Astapadham) Pillar Bottom KAMBU BORDER, PATTUMA NAVADAI BORDER with neatly finishing of MATTA SUTHAI works by using rich cement mortar with neatly finished. All the above works should be executed as per the detailed drawing furnished by the Heritage conservation Architect and instruction of Executive Engineer, PWD. The rate for the works including Including material charges at site, Labour charges excluding scaffolding charges etc., | 45 | RM | 4,000 ₹2.1 L | 4,600 ₹2.4 L | 4,600 ₹2.4 L |
Tender Value
₹1.4 Cr
EMD Value
₹1.4 L
Closing Date
2 Dec 2025, 3:00 pmClosed
Superintending Engineer
O/o. Superintending Engineer, PWD, Heritage Buildings Circle, Chepauk, Chennai -05
Providing Cornice Art plastering and Ornamental works in front elevation of Korkai A and B Blocks, Adichanallur A and B Block and Compound Wall in Porunai museum at Kulavanigarpuram village in Tirunelveli district
2025_PWD_626402_1
63/HBC/2025-26
Open Tender
Civil Works - Buildings
60 days
Tirunelveli
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹1.4 L
Yes
13 Mar 2026
26 Nov 2025
2 Dec 2025
26 Nov 2025
2 Dec 2025
26 Nov 2025
Amount
KORKAI A - BLOCK
Providing Sthapathi Ornamental works on above Terrace Parapet Top border of size 135mm X 100mm by sthapathi the following works to be carried on. To make a above Parapet wall top surface pasting of brick bat by using rich cement mortar. To make a UTTIRAM BORDER, KAMBU BORDER, ELUTHAGA NAVADAI BORDER, TAPPER BORDER with neatly finishing MATTA SUTHAI works by using rich cement mortar with neatly finished. All the above works should be executed as per the detailed drawing furnished by the Heritage conservation Architect and instruction of Executive Engineer, PWD. The rate for the works including Including material charges at site, Labour charges excluding scaffolding charges etc.,
Providing Sthapathi Ornamental works on Roof border of size 550mm X 220mm by sthapathi the following works to be carried on. To make a UTTIRAM BORDER,KAMBU BORDER, ELUTHAGA NAVADAI BORDER, TAPPER BORDER with neatly finishing MATTA SUTHAI works by using rich cement mortar with neatly finished. All the above works should be executed as per the detailed drawing furnished by the Heritage conservation Architect and instruction of Executive Engineer, PWD. The rate for the works including Including material charges at site, Labour charges excluding scaffolding charges etc.,
Providing Sthapathi Ornamental works on Centre Pillar 1 set- 2 Nos of size 230mm X 900mm by sthapathi the following works to be carried on. To make a above pillar wall surface pasting of brick bat by using rich cement mortar. To make a UTTIRAM BORDER, KAMBU BORDER, ELUTHAGA NAVADAI BORDER, TAPPER BORDER with neatly finishing MATTA SUTHAI works by using rich cement mortar with neatly finished. All the above works should be executed as per the detailed drawing furnished by the Heritage conservation Architect and instruction of Executive Engineer, PWD. The rate for the works including Including material charges at site, Labour charges excluding scaffolding charges etc.,
Providing Sthapathi Ornamental works on First Floor Arch Border of size - 2035mm X 108mm by sthapathi the following works to be carried on. To make a above surface pasting of brick bat by using rich cement mortar. To make a UTTIRAM BORDER, ARCH BORDER, TAPPER BORDER with neatly finishing MATTA SUTHAI works by using rich cement mortar with neatly finished. All the above works should be executed as per the detailed drawing furnished by the Heritage conservation Architect and instruction of Executive Engineer, PWD. The rate for the works including Including material charges at site, Labour charges excluding scaffolding charges etc.,
Providing Sthapathi Ornamental works on First Floor Bottom Border of size - 335mm X 180mm by sthapathi the following works to be carried on. To make a above wall surface pasting of brick bat by using rich cement mortar. To make a UTTIRAM BORDER, ARCH BORDER, TAPPER BORDER with neatly finishing MATTA SUTHAI works by using rich cement mortar with neatly finished. The Above all works asper the direction of Architect drawing given by the departmental officer. All the above works should be executed as per the detailed drawing furnished by the Heritage conservation Architect and instruction of Executive Engineer, PWD. The rate for the works including Including material charges at site, Labour charges excluding scaffolding charges etc.,
Providing Sthapathi Ornamental works on Ground Floor Roof Border of size 405mm X 300mm by sthapathi the following works to be carried on. To make a above wall surface pasting of brick bat by using rich cement mortar. To make a URUTTU BORDER, KAMBU KOLUVU BORDER, NAVADAI BORDER, KAMBU BORDER. Pillar Lower portion (ASTAPATHAM) KAMBU BORDER,PATTUMA NAVADAI BORDER with need finishing of MATTA SUTHAI works by using rich cement mortar with neatly finished. All the above works should be executed as per the detailed drawing furnished by the Heritage conservation Architect and instruction of Executive Engineer, PWD. The rate for the works including Including material charges at site, Labour charges excluding scaffolding charges etc.,
Providing Sthapathi Ornamental works on First floor Arch of size 50mm X 40mm (1 set) by sthapathi the following works to be carried on. To make a above wall outer surface pasting of brick bat by using rich cement mortar. To make a URUTTU BORDER, KAMBU KOLUVU BORDER, NAVADAI BORDER, KAMBU BORDER. To make a KAMBU BORDER, PATTUMA NAVADAI BORDER with neatly finishing MATTA SUTHAI works by using rich cement mortar with neatly finished. All the above works should be executed as per the detailed drawing furnished by the Heritage conservation Architect and instruction of Executive Engineer, PWD. The rate for the works including Including material charges at site, Labour charges excluding scaffolding charges etc.,
Providing Sthapathi Ornamental works on Outer Window above Arch 1 set - 2 Nos in First Floor by sthapathi the following works to be carried on. To make a wall surface pasting of brick bat by using rich cement mortar. To make a URUTTU BORDER, KAMBU KOLUVU BORDER, NAVADAI BORDER, KAMBU BORDER. To make a KAMBU BORDER, PATTUMA NAVADAI BORDER with neatly finishing of MATTA SUTHAI works by using rich cement mortar with neatly finished. All the above works should be executed as per the detailed drawing furnished by the Heritage conservation Architect and instruction of Executive Engineer, PWD. The rate for the works including Including material charges at site, Labour charges excluding scaffolding charges etc.,
Providing Sthapathi Ornamental works on Head Room Roof border of size 900mm X 650mm X 341mm X 112mm by sthapathi the following works to be carried on. To make a above wall top surface pasting of brick bat by using rich cement mortar. To make a URUTTU BORDER, KAMBU KOLUVU BORDER, NAVADAI BORDER, KAMBU BORDER. (Astapadham) Pillar Bottom KAMBU BORDER, PATTUMA NAVADAI BORDER with neatly finishing of MATTA SUTHAI works by using rich cement mortar with neatly finished. All the above works should be executed as per the detailed drawing furnished by the Heritage conservation Architect and instruction of Executive Engineer, PWD. The rate for the works including Including material charges at site, Labour charges excluding scaffolding charges etc.,
Providing Sthapathi Ornamental works on Head Room above Square Pillar of size 750mm X 300mm by sthapathi the following works to be carried on. To make a above Pillar top surface pasting of brick bat by using rich cement mortar. To make a URUTTU BORDER, KAMBU KOLUVU BORDER, NAVADAI BORDER, KAMBU BORDER. (Astapadham) Pillar Bottom KAMBU BORDER, PATTUMA NAVADAI BORDER with neatly finishing of MATTA SUTHAI works by using rich cement mortar with neatly finished. The Above all works asper the direction of Architect drawing given by the departmental officer. All the above works should be executed as per the detailed drawing furnished by the Heritage conservation Architect and instruction of Executive Engineer, PWD. The rate for the works including Including material charges at site, Labour charges excluding scaffolding charges etc.,
KORKAI B - BLOCK
Providing Sthapathi Ornamental works on Ground floor pillar -1 Set (1 No.) of size 1036 mmX 2400mm bottom by sthapathi the following works to be carried on. To make a above Pillar top surface pasting of brick bat by using rich cement mortar. To make a KAMBU BORDER, ELUTHAGA NAVADAI BORDER, NAVADAI BORDER, PATTUMAM BORDER,KAMBU BORDER with neatly finished. All the above works should be executed as per the detailed drawing furnished by the Heritage conservation Architect and instruction of Executive Engineer, PWD. The rate for the works including Including material charges at site, Labour charges excluding scaffolding charges etc.,
Providing Sthapathi Ornamental works on Ground floor pillar -1 Set (2 Nos.) by sthapathi the following works to be carried on. To make a above Pillar top surface pasting of brick bat by using rich cement mortar. To make a KAMBU BORDER, ELUTHAGA NAVADAI BORDER, NAVADAI BORDER, PATTUMAM BORDER, KAMBU BORDER with neatly finished. All the above works should be executed as per the detailed drawing furnished by the Heritage conservation Architect and instruction of Executive Engineer, PWD. The rate for the works including Including material charges at site, Labour charges excluding scaffolding charges etc.,
Providing Sthapathi Ornamental works on Arch 1 set - (1 No) of size 115mm by sthapathi the following works to be carried on. To make a above top surface pasting of brick bat by using rich cement mortar. To make a KAMBU BORDER, KAMBU BORDER with neatly finished. All the above works should be executed as per the detailed drawing furnished by the Heritage conservation Architect and instruction of Executive Engineer, PWD. The rate for the works including Including material charges at site, Labour charges excluding scaffolding charges etc.,
Providing Sthapathi Ornamental works on Parapet Top border of size 283mm X 115mm by sthapathi the following works to be carried on.To make a above Parapet wall top surface pasting of brick bat by using rich cement mortar. To make a UTTIRAM BORDER, KAMBU BORDER, ELUTHAGABAR BORDER with neatly finished. All the above works should be executed as per the detailed drawing furnished by the Heritage conservation Architect and instruction of Executive Engineer, PWD. The rate for the works including Including material charges at site, Labour charges excluding scaffolding charges etc.,
Providing Sthapathi Ornamental works on Ground Floor Roof Border of size 265mm X 430 mm by sthapathi the following works to be carried on. To make a above wall surface pasting of brick bat by using rich cement mortar. To make a URUTTU BORDER, KAMBU KOLUVU BORDER, NAVADAI BORDER, KAMBU BORDER. Pillar Lower portion (ASTAPATHAM) KAMBU BORDER, PATTUMA NAAVAL BORDER with neatly finishing of MATTA SUTHAI works by using rich cement mortar with neatly finished. All the above works should be executed as per the detailed drawing furnished by the Heritage conservation Architect and instruction of Executive Engineer, PWD. The rate for the works including Including material charges at site, Labour charges excluding scaffolding charges etc.,
Providing Sthapathi Ornamental works on Square Pillar by sthapathi the following works to be carried on. To make a above Pillar top surface pasting of brick bat by using rich cement mortar. To make a MUGAPATTAGA URUTTU BORDER, KAMBU URUTTU BORDER, KAMBU BORDER, ELUTHAGA NAVADAI BORDER, NAVADAI BORDER, PATTUMAM BORDER, KAMBU BORDER with neatly finished. All the above works should be executed as per the detailed drawing furnished by the Heritage conservation Architect and instruction of Executive Engineer, PWD. The rate for the works including Including material charges at site, Labour charges excluding scaffolding charges etc.,
Providing Sthapathi Ornamental works on South Outer side of size 3180mm X 77mm under the sunshade above the Square Pillar by sthapathi the following works to be carried on. To make a surface pasting of brick bat by using rich cement mortar. To make a MUGAPATTAGA URUTTU BORDER, KAMBU URUTTU BORDER, KAMBU BORDER, ELUTHAGA NAVADAI BORDER, NAVADAI BORDER, PATTUMAM BORDER, KAMBU BORDER with neatly finished. All the above works should be executed as per the detailed drawing furnished by the Heritage conservation Architect and instruction of Executive Engineer, PWD. The rate for the works including Including material charges at site, Labour charges excluding scaffolding charges etc.,,
Providing Sthapathi Ornamental works on South Outer side Arch- 1 set (1 No.) under the sunshade above the Arch by sthapathi the following works to be carried on. To make a surface pasting of brick bat by using rich cement mortar. To make a MUGAPATTAGA URUTTU BORDER, URUTTU BORDER, KAMBU KOLUVU BORDER, NAVADAI BORDER, KAMBU BORDER with neatly finishing MATTA SUTHAI works by using rich cement mortar with neatly finished. (Astapadham) Pillar Bottom KAMBU BORDER, PATTUMA NAAVAL BORDER with neatly finished. All the above works should be executed as per the detailed drawing furnished by the Heritage conservation Architect and instruction of Executive Engineer, PWD. The rate for the works including Including material charges at site, Labour charges excluding scaffolding charges etc.,
Providing Sthapathi Ornamental works on Arch above the Window of size 80mm - 1 set (1 No.) by sthapathi the following works to be carried on. To make a Arch surface pasting of brick bat by using rich cement mortar. To make a KAMBU BORDER, KAMBU BORDER with neatly finished. All the above works should be executed as per the detailed drawing furnished by the Heritage conservation Architect and instruction of Executive Engineer, PWD. The rate for the works including Including material charges at site, Labour charges excluding scaffolding charges etc.,
Providing Sthapathi Ornamental works on G.F Roof border of size 250mm X 285mm by sthapathi the following works to be carried on. To make a surface pasting of brick bat by using rich cement mortar. To make a URUTTU BORDER, KAMBU KOLUVU BORDER, NAVADAI BORDER, KAMBU BORDER with neatly finished. (Astapadham) Pillar Bottom KAMBU BORDER, PATTUMA NAAVAL BORDER with MATTA SUTHAI works by using rich cement mortar with neatly finished. All the above works should be executed as per the detailed drawing furnished by the Heritage conservation Architect and instruction of Executive Engineer, PWD. The rate for the works including Including material charges at site, Labour charges excluding scaffolding charges etc.
Providing Sthapathi Ornamental works on Head Room Roof border of size 250mm X 300mm by sthapathi the following works to be carried on. To make a above wall surface pasting of brick bat by using rich cement mortar. To make a URUTTU BORDER, KAMBU KOLUVU BORDER, NAVADAI BORDER, KAMBU BORDER. (Astapadham) Pillar Bottom KAMBU BORDER, PATTUMA NAAVAL BORDER with neatly finishing of MATTA SUTHAI works by using rich cement mortar with neatly finished. All the above works should be executed as per the detailed drawing furnished by the Heritage conservation Architect and instruction of Executive Engineer, PWD. The rate for the works including Including material charges at site, Labour charges excluding scaffolding charges etc.
Providing Sthapathi Ornamental works on Head Room above Square Pillar of size 750mm X 300mm 1 Set - (1No.) by sthapathi the following works to be carried on. To make a above Pillar top surface pasting of brick bat by using rich cement mortar. To make a ELUTHAGA NAVADAI BORDER TAPPER BORDER, with neatly finishing of MATTA SUTHAI works by using rich cement mortar with neatly finished. All the above works should be executed as per the detailed drawing furnished by the Heritage conservation Architect and instruction of Executive Engineer, PWD. The rate for the works including Including material charges at site, Labour charges excluding scaffolding charges etc.
Providing Sthapathi Ornamental works on Head Room above Square Pillar of size 750mm X 300mm 1 Set - (1No.) by sthapathi the following works to be carried on. To make a above Pillar top surface pasting of brick bat by using rich cement mortar. To make a ELUTHAGA NAVADAI BORDER TAPPER BORDER, with neatly finishing of MATTA SUTHAI works by using rich cement mortar with neatly finished. The Above all works asper the direction of Architect drawing given by the departmental officer. All the above works should be executed as per the detailed drawing furnished by the Heritage conservation Architect and instruction of Executive Engineer, PWD. The rate for the works including Including material charges at site, Labour charges excluding scaffolding charges etc.
ADICHANALLUR A BLOCK
Providing Sthapathi Ornamental works on Parapet Pillar of size 300mm X 750mm - 1No. by sthapathi the following works to be carried on. To make a above Pillar top surface pasting of brick bat by using rich cement mortar. All the above works should be executed as per the detailed drawing furnished by the Heritage conservation Architect and instruction of Executive Engineer, PWD. The rate for the works including Including material charges at site, Labour charges excluding scaffolding charges etc.
Providing Sthapathi Ornamental works on Parapet Top Border 175mm X 125mm by sthapathi the following works to be carried on. To make a above Pillar top surface pasting of brick bat by using rich cement mortar. To make a UTTIRAM BORDER, KAMBU BORDER, ELUTHAGA NAVADAI BORDER, TAPPER BORDER with neatly finishing MATTA SUTHAI works by using rich cement mortar with neatly finished. All the above works should be executed as per the detailed drawing furnished by the Heritage conservation Architect and instruction of Executive Engineer, PWD. The rate for the works including Including material charges at site, Labour charges excluding scaffolding charges etc.
Providing Sthapathi Ornamental works on Parapet Bottom Border 100mm by sthapathi the following works to be carried on. To make a above Pillar top surface pasting of brick bat by using rich cement mortar. To make a UTTIRAM BORDER, KAMBU BORDER, ELUTHAGA NAVADAI BORDER, TAPPER BORDER with neatly finishing MATTA SUTHAI works by using rich cement mortar with neatly finished. All the above works should be executed as per the detailed drawing furnished by the Heritage conservation Architect and instruction of Executive Engineer, PWD. The rate for the works including Including material charges at site, Labour charges excluding scaffolding charges etc.
Providing Sthapathi Ornamental works on Roof Border 345mm X 125mm by sthapathi the following works to be carried on. To make a above Pillar top surface pasting of brick bat by using rich cement mortar. To make a URUTTU BORDER, KAMBU KOLUVU BORDER, NAVADAI BORDER, KAMBU BORDER. (Astapadham) Pillar Bottom KAMBU BORDER, PATTUMA NAVADAI BORDER with neatly finishing of MATTA SUTHAI works by using rich cement mortar with neatly finished. All the above works should be executed as per the detailed drawing furnished by the Heritage conservation Architect and instruction of Executive Engineer, PWD. The rate for the works including Including material charges at site, Labour charges excluding scaffolding charges etc.
Providing Sthapathi Ornamental works on Round Pillar 300mm X 2400mm (Ht.) by sthapathi the following works to be carried on. Round Pillar Upper Portion (Thalai set) URUTTU BORDER, KAMBU KOLUVU BORDER, NAVADAI BORDER, KAMBU BORDER. Round (Astapadham) Pillar Lower portion KAMBU BORDER, PATTUMA NAVADAI BORDER with neatly finishing of MATTA SUTHAI works by using rich cement mortar with neatly finished. All the above works should be executed as per the detailed drawing furnished by the Heritage conservation Architect and instruction of Executive Engineer, PWD. The rate for the works including Including material charges at site, Labour charges excluding scaffolding charges etc.
Providing Sthapathi Ornamental works on Arch Pillar 1 set - (2 Nos.). All the above works should be executed as per the detailed drawing furnished by the Heritage conservation Architect and instruction of Executive Engineer, PWD. The rate for the works including material charges at site, Labour charges excluding scaffolding charges etc.,
Providing Sthapathi Ornamental works on Arch Pillar 1 set. All the above works should be executed as per the detailed drawing furnished by the Heritage conservation Architect and instruction of Executive Engineer, PWD. The rate for the works including material charges at site, Labour charges excluding scaffolding charges etc.,
Providing Sthapathi Ornamental works on Ground Floor Roof Border 300mm X 330mm by sthapathi the following works to be carried on. To make a above wall surface pasting of brick bat by using rich cement mortar. To make a URUTTU BORDER, KAMBU KOLUVU BORDER, NAVADAI BORDER, KAMBU BORDER. (Astapadham) Pillar Bottom KAMBU BORDER, PATTUMA NAVADAI BORDER with neatly finishing of MATTA SUTHAI works by using rich cement mortar with neatly finished. All the above works should be executed as per the detailed drawing furnished by the Heritage conservation Architect and instruction of Executive Engineer, PWD. The rate for the works including Including material charges at site, Labour charges excluding scaffolding charges etc.
Providing Sthapathi Ornamental works on First Floor Arch Top Border 165mm X 200mm. All the above works should be executed as per the detailed drawing furnished by the Heritage conservation Architect and instruction of Executive Engineer, PWD. The rate for the works including material charges at site, Labour charges excluding scaffolding charges etc.,
Providing Sthapathi Ornamental works on Arch Top Centre Pillar - 1 set (1 No.). All the above works should be executed as per the detailed drawing furnished by the Heritage conservation Architect and instruction of Executive Engineer, PWD. The rate for the works including material charges at site, Labour charges excluding scaffolding charges etc.,
Providing Sthapathi Ornamental works on Ground Floor Parapet Top border of size 135mm X 66mm by sthapathi the following works to be carried on.To make a above Parapet wall top surface pasting of brick bat by using rich cement mortar. To make a URUTTU BORDER with neatly finished. All the above works should be executed as per the detailed drawing furnished by the Heritage conservation Architect and instruction of Executive Engineer, PWD. The rate for the works including Including material charges at site, Labour charges excluding scaffolding charges etc.,
Providing Sthapathi Ornamental works on Ground Floor Parapet Bottom border of size 135mm X 66mm by sthapathi the following works to be carried on.To make a above Parapet wall top surface pasting of brick bat by using rich cement mortar. To make a URUTTU BORDER with neatly finished. All the above works should be executed as per the detailed drawing furnished by the Heritage conservation Architect and instruction of Executive Engineer, PWD. The rate for the works including Including material charges at site, Labour charges excluding scaffolding charges etc.,
Providing Sthapathi Ornamental works on Ground Floor Roof bottom border of size 165mm X 200mm by sthapathi the following works to be carried on.To make a above Parapet wall top surface pasting of brick bat by using rich cement mortar. To make a URUTTU BORDER, KAMBU KOLUVU BORDER, NAVADAI BORDER, KAMBU BORDER. (Astapadham) Pillar Bottom KAMBU BORDER, PATTUMA NAVADAI BORDER with neatly finishing of MATTA SUTHAI works by using rich cement mortar with neatly finished. All the above works should be executed as per the detailed drawing furnished by the Heritage conservation Architect and instruction of Executive Engineer, PWD. The rate for the works including Including material charges at site, Labour charges excluding scaffolding charges etc.,
Providing Sthapathi Ornamental works on Ground Floor Pillar 1 set - (2 Nos.). All the above works should be executed as per the detailed drawing furnished by the Heritage conservation Architect and instruction of Executive Engineer, PWD. The rate for the works including material charges at site, Labour charges excluding scaffolding charges etc.,
Providing Sthapathi Ornamental works on Ground Floor Side Arch. All the above works should be executed as per the detailed drawing furnished by the Heritage conservation Architect and instruction of Executive Engineer, PWD. The rate for the works including material charges at site, Labour charges excluding scaffolding charges etc.,
Providing Sthapathi Ornamental works on Head Room Border 345mm X 125mm by sthapathi the following works to be carried on. To make a above Pillar top surface pasting of brick bat by using rich cement mortar. To make a URUTTU BORDER, KAMBU KOLUVU BORDER, NAVADAI BORDER, KAMBU BORDER. (Astapadham) Pillar Bottom KAMBU BORDER, PATTUMA NAVADAI BORDER with neatly finishing of MATTA SUTHAI works by using rich cement mortar with neatly finished. All the above works should be executed as per the detailed drawing furnished by the Heritage conservation Architect and instruction of Executive Engineer, PWD. The rate for the works including Including material charges at site, Labour charges excluding scaffolding charges etc.
Providing Sthapathi Ornamental works on Head Room above Pillar of size 750mm X 300mm by sthapathi the following works to be carried on. To make a above Pillar top surface pasting of brick bat by using rich cement mortar. To make a URUTTU BORDER, KAMBU KOLUVU BORDER, NAVADAI BORDER, KAMBU BORDER. (Astapadham) Pillar Bottom KAMBU BORDER, PATTUMA NAVADAI BORDER with neatly finishing of MATTA SUTHAI works by using rich cement mortar with neatly finished. The Above all works asper the direction of Architect drawing given by the departmental officer. All the above works should be executed as per the detailed drawing furnished by the Heritage conservation Architect and instruction of Executive Engineer, PWD. The rate for the works including Including material charges at site, Labour charges excluding scaffolding charges etc.,
ADICHANALLUR B BLOCK
Providing Sthapathi Ornamental works on First floor Square pillar -1 Set (1 No.) of size 300 mm X 300mm for a height of 2.1m by sthapathi with neatly finishing of MATTA SUTHAI works by using rich cement mortar. All the above works should be executed as per the detailed drawing furnished by the Heritage conservation Architect and instruction of Executive Engineer, PWD. The rate for the works including Including material charges at site, Labour charges excluding scaffolding charges etc.
Providing Sthapathi Ornamental works on Parapet Top Arch border of size 269mm X 107mm by sthapathi the following works to be carried on.To make a above Parapet wall top Arch surface pasting of brick bat by using rich cement mortar. To make a URUTTU BORDER,KAMBU KOLUVU BORDER, NAVADAI BORDER, KAMBU BORDER with neatly finished. To make a KAMBU BORDER, PATTUMA NAAVAL BORDER with MATTA SUTHAI works by using rich cement mortar with neatly finished. All the above works should be executed as per the detailed drawing furnished by the Heritage conservation Architect and instruction of Executive Engineer, PWD. The rate for the works including Including material charges at site, Labour charges excluding scaffolding charges etc.
Providing Sthapathi Ornamental works on G.F Roof border of size 135mm X 115mm by sthapathi the following works to be carried on. To make a surface pasting of brick bat by using rich cement mortar. To make a URUTTU BORDER,KAMBU KOLUVU BORDER, NAVADAI BORDER with MATTA SUTHAI works by using rich cement mortar with neatly finished. All the above works should be executed as per the detailed drawing furnished by the Heritage conservation Architect and instruction of Executive Engineer, PWD. The rate for the works including Including material charges at site, Labour charges excluding scaffolding charges etc.
Providing Sthapathi Ornamental works on G.F Pedestal border (625mm depth Ring border, 63mm and 35mm).All the above works should be executed as per the detailed drawing furnished by the Heritage conservation Architect and instruction of Executive Engineer, PWD. The rate for the works including Including material charges at site, Labour charges excluding scaffolding charges etc.
Providing Sthapathi Ornamental works on Handrail Bottom border of size 160mm X 90mm. All the above works should be executed as per the detailed drawing furnished by the Heritage conservation Architect and instruction of Executive Engineer, PWD. The rate for the works including Including material charges at site, Labour charges excluding scaffolding charges etc.,
Providing Sthapathi Ornamental works on Parapet Pillar 300mm X 300mm. All the above works should be executed as per the detailed drawing furnished by the Heritage conservation Architect and instruction of Executive Engineer, PWD. The rate for the works including material charges at site, Labour charges excluding scaffolding charges etc.,
Providing two legged scaffolding using 48.30mm dia heavy duty MS pipe over all height of 3.00m the distance between 2 legs being1.25m and the spacing of the post being 2m in each rows and providing platform with C.W. planks using 40mm thick silver oak and 1.00m wide in complete form with horizontal bracings @ 1.50m c/c vertical direction and with cross bracings using same 48.30mm dia including cutting, threading assembly with red oxide primer, labour charges cost of specials such on large plate, shoe, carcher, coupling, bolt and nut transportation charges. The bottom of vertical post shall rest on 300x300x70mm 1:2:4 concrete base etc complete complying with standard specification and as directed
For initial 3m Height
For every additional 2.50m Height
COMPOUND WALL
Providing Sthapathi Ornamental works on Compound wall (West side) of size 75mm X 15mm. All the above works should be executed as per the detailed drawing furnished by the Heritage conservation Architect and instruction of Executive Engineer, PWD. The rate for the works including material charges at site, Labour charges excluding scaffolding charges etc.,
Providing Sthapathi Ornamental works on Compound wall Pillar Top Coping of size 230mm X 450mm.X 150mm. All the above works should be executed as per the detailed drawing furnished by the Heritage conservation Architect and instruction of Executive Engineer, PWD. The rate for the works including material charges at site, Labour charges excluding scaffolding charges etc.,
Providing Sthapathi Ornamental works on Compound wall (South side) of size 75mm X 15mm. All the above works should be executed as per the detailed drawing furnished by the Heritage conservation Architect and instruction of Executive Engineer, PWD. The rate for the works including material charges at site, Labour charges excluding scaffolding charges etc.,
Providing Sthapathi Ornamental works on Compound wall Pillar Top Coping of size 230mm X 450mm.X 150mm. All the above works should be executed as per the detailed drawing furnished by the Heritage conservation Architect and instruction of Executive Engineer, PWD. The rate for the works including material charges at site, Labour charges excluding scaffolding charges etc.,
Providing Sthapathi Ornamental works on Compound wall (East side) of size 75mm X 15mm. All the above works should be executed as per the detailed drawing furnished by the Heritage conservation Architect and instruction of Executive Engineer, PWD. The rate for the works including material charges at site, Labour charges excluding scaffolding charges etc.,
Providing Sthapathi Ornamental works on Compound wall Pillar Top Coping of size 230mm X 450mm.X 150mm. All the above works should be executed as per the detailed drawing furnished by the Heritage conservation Architect and instruction of Executive Engineer, PWD. The rate for the works including material charges at site, Labour charges excluding scaffolding charges etc.,
Providing Sthapathi Ornamental works on Compound wall (East side) of size 75mm X 15mm. All the above works should be executed as per the detailed drawing furnished by the Heritage conservation Architect and instruction of Executive Engineer, PWD. The rate for the works including material charges at site, Labour charges excluding scaffolding charges etc.,
Providing Sthapathi Ornamental works on Compound wall (North side) of size 75mm X 15mm. All the above works should be executed as per the detailed drawing furnished by the Heritage conservation Architect and instruction of Executive Engineer, PWD. The rate for the works including material charges at site, Labour charges excluding scaffolding charges etc.,
Providing Sthapathi Ornamental works on Compound wall Pillar Top Coping of size 230mm X 450mm.X 150mm. All the above works should be executed as per the detailed drawing furnished by the Heritage conservation Architect and instruction of Executive Engineer, PWD. The rate for the works including material charges at site, Labour charges excluding scaffolding charges etc.,
Providing Sthapathi Ornamental works on Compound wall (North side) of size 75mm X 15mm. All the above works should be executed as per the detailed drawing furnished by the Heritage conservation Architect and instruction of Executive Engineer, PWD. The rate for the works including material charges at site, Labour charges excluding scaffolding charges etc.,
AADHISHIVAM ENGINEERING CONSTRUCTION LLP (BID ID -1525040)
ASHOK CONSTRUCTION (BID ID -1524639)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_749019.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
conditioncornice.pdf
Tender Documents • 12.31 MB
BOQ_749019.xls
BOQ • 0.43 MB
Download all tender documents and submit your bid