Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹4.6 LAccepted-Finance | L-1 | Accepted-Finance L-1 Bidder | |
| 2 | L-2₹5.5 L+₹89,692 (19.5%)Rejected-Finance 2 III 7 OBRA COLONY OBRA OBRA SONBHADRA UTTAR PRADESH 231219 INDIA | SONBHADRA | UTTAR PRADESH | 231219 | L-2 | Rejected-Finance L-2 Bidder | |
| 3 | Rejected-Technical | - | Rejected-Technical As per PQC | |
| 4 | Rejected-Technical | - | Rejected-Technical As per PQC |
Tender Value
₹5.0 L
EMD Value
₹10,000
Closing Date
13 Jan 2022, 6:00 pmClosed
Superintending Engineer-II, 2x200MW, BTPS,OBRA
Superintending Engineer-II, 2x200MW, BTPS,OBRA
Replacement/repairing work of damaged frame, louvers support, header pipe, socket, nozzle, shed structure of cooling tower of CAC Plant, Overhauling of LP valve, repairing of LP pipe line and installation of grille in AC Duct for 5x200MW Units, BTPS
2021_RVUNL_648262_1
09/SE-II/2x200MW/TMD/2021-22
Open Tender
Miscellaneous Works
Fixed-rate
180 days
5x200MW Units, BTPS, OBRA
Please refer Tender documents.
3 documents required · 3 mandatory
₹590
DY. CAO, CFAandBO, BTPS, OBRA
₹10,000
30 Mar 2022
27 Nov 2021
17 Jan 2022
27 Nov 2021
13 Jan 2022
27 Nov 2021
27 Nov 2021 - 13 Jan 2022
Amount
Replacement of all damaged frames of cooling towers of C.A.C. Plant by fabrication & erection of new frame by MS Plate/Angle/T for fixing of louvers.
Paitnting of above 16 nos. newly fabricated & erected frames of cooling towers.
Fabrictation & Erection of ladders for each cooling tower No. 1 & 3. (Size -500mmX500mm Approx)
Replacement of all damaged louvers of cooling towers of A.C. Plant by fabricating new louvers out of G.C. sheet and fixing of the same in the frame of cooling tower. (Size 120X300X0.6/0.8 MM)
Dismentling of OLD/damaged shed structure cooling tower of A.C. plant.
Fabrication of shed structure on each cooling tower and sheeting by corrugated GI/GC sheet.
Cleaning of LP pipes by cutting/welding of hoints of L.P. pipes.
Up to 50mm.
Patch welding work to attend leakage of L.P. pipe.
Upto 100mm.
Upto 150mm.
Overhauling of L.P. valves.
Installation of new/repaired grille in AC duct including fabrication/repairing and installation of damaged portion of duct in UCB, DCS room of Unit no. 12 &13.
MASSIVE CONSTRUCTION CO
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .