Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.4 LAdmitted-Finance | ₹10.4 L | L1 | Admitted-Finance |
| 2 | L2₹11.0 L+₹59,288.47 (5.70%)Admitted-Finance | ₹11.0 L+₹59,288.47 (5.70%) | L2 | Admitted-Finance |
| 3 | L3₹11.0 L+₹61,976.47 (5.96%)Admitted-Finance | ₹11.0 L+₹61,976.47 (5.96%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | Rejected-Technical Not submitted all requisite document as per NIT |
| 5 | Rejected-Technical | - | - | Rejected-Technical Not submitted all requisite document as per NIT |
| Sl No | Description | Qty | Unit | DURGAWATI ENTERPRISES PRIVATE LIMITED L2 | VINEET KUMAR L3 | Maa Vindhyawasni Enterprises L1 |
|---|---|---|---|---|---|---|
| 1.00Scaffolding works | ||||||
| 1.10 | Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineer-in-charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. | 1,517.25 | sqm | 246 ₹3,73,243.5 | 50 ₹75,862.5 Lowest | 98 ₹1,48,690.5 |
| 2.00Preparation of painting surfaces | ||||||
| 2.10 | Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete (as per direction of EIC) | 5,150 | sqm | 10 ₹51,500 Lowest | 20 ₹1,03,000 | 29 ₹1,49,350 |
| 2.20 | Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq.meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground, all complete as per direction of Engineer-in-Charge.With cement mortar 1:4 (1cement: 4 coarse sand) | 228.7 | sqm | 420 ₹96,054 | 325 ₹74,327.5 Lowest | 536 ₹1,22,583.2 |
| 3.00Painting Works | ||||||
| 3.10Painting of Office Building | ||||||
| 3.11Finishing walls with Acrylic Smooth exterior paint of required shade : Old work (Two or more coat applied @ 1.67 ltr/ 10 sqm) on existing cement paint surface (as per direction of Engineer-in-Charge.) | ||||||
| 3.12 | Total area of Office building including 03 nos. of Guard post Room (Excluding area of windows) | 3,219.37 | sqm | 85 ₹2,73,646.45 Lowest | 167 ₹5,37,634.79 | 90 ₹2,89,743.3 |
| 3.20Painting of Entry office shed, Reception & Bathroom | ||||||
Tender Value
₹14.4 L
EMD Value
₹28,854
Closing Date
30 Jun 2026, 3:00 pmClosed
Director
Gaighat, Gulzarbagh, Patna - 800007
Repair and Painting Works of Existing Office Building and Boundary wall at IWAI, RO, Patna.
2026_IWAI_913207_1
IWAI/PTN/17(01)/Office Building/2026-27
Open Tender
Civil Works - Buildings
Works
30 days
IWAI, RO
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
Yes
IWAI Fund
₹28,854
Yes
17 Jul 2026
16 Jun 2026
1 Jul 2026
16 Jun 2026
30 Jun 2026
16 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Scaffolding works | |||||
| 1.1 | Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineer-in-charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. | 1,517.25 | sqm | 100 | ₹1,51,725 |
| 2Preparation of painting surfaces | |||||
| 2.1 | Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete (as per direction of EIC) | 5,150 | sqm | 100 | ₹5,15,000 |
| 2.2 | Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq.meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground, all complete as per direction of Engineer-in-Charge.With cement mortar 1:4 (1cement: 4 coarse sand) | 228.7 | sqm | 100 | ₹22,870 |
| 3Painting Works | |||||
| 3.1 | Painting of Office Building | - | - | - | - |
| 3.11 | Finishing walls with Acrylic Smooth exterior paint of required shade : Old work (Two or more coat applied @ 1.67 ltr/ 10 sqm) on existing cement paint surface (as per direction of Engineer-in-Charge.) | - | - | - | - |
| 3.12 | Total area of Office building including 03 nos. of Guard post Room (Excluding area of windows) | 3,219.37 | sqm | 100 | ₹3,21,937 |
| 3.2 | Painting of Entry office shed, Reception & Bathroom | - | - | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.77 MB
td.pdf
Tender Documents • 1.49 MB
BOQ_959702.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .